ML19344B536
| ML19344B536 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/15/1980 |
| From: | Trimble D ARKANSAS POWER & LIGHT CO. |
| To: | Haller N NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19344B537 | List: |
| References | |
| 2-100-10, NUDOCS 8010210424 | |
| Download: ML19344B536 (1) | |
Text
6 4
- wwg.,
ARKANSAS POWER & LIGHT COMPANY POST OFFICE box 551 LITTLE ROCK, ARKANSAS 72203 (501)371-4000 October 15, 1980 2-100-10 Mr. Noman ft. Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Comm.
Washington, D.C.
20555
SUBJECT:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Onarating Report (File: 2-G620.1)
Gentlemen:
Attached find the Monthly Operating Report for September,1980, for Arkansas Nuclear One - Unit 2.
Also, attached are corrected Operating Data Report Sheets for the period from flarch 23, 1980, to August,1980.
l These corrections represent a change in operating statistics due to the l
detemination of the unit's m6ximum dependable capacity.
i Very truly yours, D.@.[M D. C. Trimble Manager, Licensing DCT:DVH:1p Attachments cc: Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Comm.
Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Mr. Victor Stello, Jr., Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Com.
\\g Washington, J.C.
20555 8 010 210 Q'}
MEMBE A MICOLE SCUTH UTILITIES SYSTEM