Text
o e
Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 250-1000 m
F. L CLAYTON, JR.
Senior Vice President Alabama Power t*v sootrem eectrc system October 15, 1980 Docket No. 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the September,1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, 40-F. L. Clayton, Jr.
FLCJr/JRC:bhj Attachments cc:
Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, RII (1 copy)
\\
\\
8010210 4 6' 2 L
t-o**,.
JOSEPH M. FARLEY NUCLEAR PLWT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS
. SEPTEMBER, 1980 There were five unit shutdowns and seven power reductions in the ~ month of' September The following safety-related maintenance was performed in September:
1.
Replaced cells 19, 20 and 21 on the B train Service Water battery and cells 27, 28 and 29 on the A train Service Water battery.
i2.
Replaced 1B Diesel A train air compressor relief valve.
3.
Repacked and set the lift on #10 River Water pump.
4.
Repacked air reservoir discharge valves on 1B Diesel train A and B air start systems, i
1 l
i 1
eye ye H
g e"
w us-
-+9p ay=r p
s-
---~