ML19344B323

From kanterella
Jump to navigation Jump to search
Forwards Primary Containment Integrated Leak Rate Test, Second Periodic Test & Local Leak Rate Tests Results, Jan-May,1980.
Date released: 12/24/2019 Download: ML19344B323


Primary Containment Integrated Leak Rate Test,Second Periodic Test & Local Leak Rate Tests Results,Jan-May,1980.
ML19344B327
Person / Time
Site: Pilgrim
Issue date: 05/31/1980
From: Cafarella P, Smith P, Wollman S
BOSTON EDISON CO.
To:
References
Download: ML19344B327 (112)
Forwards Primary Containment Integrated Leak Rate Test, Second Periodic Test & Local Leak Rate Tests Results, Jan-May,1980.
ML19344B322
Person / Time
Site: Pilgrim
Issue date: 08/20/1980
From: Andognini G
BOSTON EDISON CO.
To: EISENHUT D G
Office of Nuclear Reactor Regulation
References
Download: ML19344B322 (1)