Forwards LERs 80-050/03L-0,80-051/03L-0 & 80-052/03L-0
Date released: 12/24/2019 Download: ML19344B148


LER 80-052/03L-0:on 800719,during Mode 1 Operation, Containment Bldg Pressure Indicator 2PI-5603-3 Failed High. Caused by Erratic Current Repeater 2PY-5603-3B.Repeater Replaced & Pressure Indication Returned to Normal
ML19344B157
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/15/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19344B157 (1)
LER 80-051/03L-0:on 800717,during Mode 1 Operation,Core a Protection Calculator Failure Alarm Was Received.Cause Not Determined.Calculator Reinitiated & All Failure Indications Returned to Normal.Bypasses Removed
ML19344B154
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/15/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19344B154 (1)
LER 80-050/03L-0:on 800717,while Testing Steam Driven Emergency Feedwater Pump 2P7A,turbine Driven 2K3 Tripped on Overspeed.Cause Not Found.Accelerated Test Schedule Resumed to Determine Reason for Trips
ML19344B149
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/15/1980
From: Pendergraft R
ARKANSAS POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19344B149 (1)
Forwards LERs 80-050/03L-0,80-051/03L-0 & 80-052/03L-0
ML19344B147
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/15/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)