05000313/LER-1980-026, Forwards LER 80-026/03L-0

From kanterella
(Redirected from ML19344B059)
Jump to navigation Jump to search
Forwards LER 80-026/03L-0
ML19344B059
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/15/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19344B060 List:
References
1-080-12, 1-80-12, NUDOCS 8008250504
Download: ML19344B059 (1)


LER-1980-026, Forwards LER 80-026/03L-0
Event date:
Report date:
3131980026R00 - NRC Website

text

.

l r

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501) 3714000 August 15, 1980 1-080-12 Mr. K. V. Seyfrit, Director Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Comm.

Region IV 611 Ryan Pla::a Drive, Suite 1000 Arlington, Texas 76011 Subj ect:

Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Licensee Event Report No. 80-026/03L-0 (File:

0520)

Gentlemen:

In accordance with Arkansas Nuclear One-Unit 1 Technical Specification 6.12.3.2.d. attached is the subject report concerning a small primary to secondary leak which developed during power operation.

Very truly yours, 0

David C. Trimble Manager, Licensing DCT:GAC:ja Attachment cc:

Mr. Victor Stello, Jr., Director Office of Inspection S Enforcemen+.

U. S. Nuclear Regulatory Comm.

Wa shington, D. C.

20555 Mr. Norman M. Iblier, Director Office of Management and Progran Analysis U. S. Nuclear Regulatory Comm.

Wa shington, D. C. 20555 O

MEMBER MfDOLE SOUTH UTIUTIES SYSTEM