BALTI M O RE GAS AN D ELECTRIC CO M PANY GAS AN D ELECTRIC BUILDING B A LTI M O R E, M A RYLA N D 21203 Aarwun c. Lunovm.Ja.
^
July 18, 1973 c c.....oc-,
a som.
t Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Co= mission
'4ashington, D.C.
20555 THIS DOCUMENT CONTAINS Attn:
Mr. Robert W. Reid, Chief Operating Reacotrs Branch #h Division of Operating Reactors Sub. ject :
Calvert Cliffs Nuclear Power Plant Unit No. 1 & 2, Docket No. 50-317 & 50-318 Movement of Heavy Loads Near Spent Fuel
Reference:
NRC letter dated 6-12-78 from Stello to Lundvall forwarding 5-17-78 letter, same sub. ject.
Dear Mr. Beid:
The referenced letter requested that we provide certain infor=ation relative to the control of movement of heavy loads near spent fuel. Attached are (1) copy of the specific questions asked and (2) our responses thereto. As suggested by your letter, many of our responses are in the form of references to previously sub-mitted information.
Very truly yours',
A. E. Lundvall, Jr.
Vice-President - Supply RCLO/=lk ee:
J. A. Biddison, Esquire G. F. Trowbridge, Esquire E. L. Conner, NRC
~
J. W. 3rothers, Sechtel M
- l
)
Attachment (1)
INFOR'4ATION REQUESTED 1.
Provide a diagram which illustrates the physical relation between the reactor core, the fuel transfer canal, the spent fuel storage pool and the set down, receiving or storage areas for any heavy loads moved on the refueling floor.
i 17.
Provide a list of all objects that are required to be moved over the reactor core (during refueling), or the spent fuel storage pool.
For each object listed, provide its approxi= ate weight and size, a diagram of the movement path utilized (including carrying height) and the frequency of movement.
3.
What are the dimensions and weights of the spent fuel casks that are or vill be used at your facility?
h.
Identify any heavy load or cask drop analyses performed to date for your facility.
Provide a copy of all such analyses not previously submitted to the NRC staff.
5 Identify any heavy loads that are carried over equipment required for the safe shutdown of a plant that is operating at the time the load is moved. Identify what equipment could be affected in the event of a heavy load handling accident (piping, cabling, pumps, etc) and discuss the feasibility of such an accident affecting this equipment.
Describe the basis for your conclusions.
6.
If heavy loads are required to be carried over the spent fuel storage pool or fuel transfer canal at your facility, discuss the feasibility of a handling accident which could result in water leakage severe enough to uncover the spent fuel.
Describe the basis for your conclusions.
7 Describe any design features of your facility which affect the potential for a heavy load handling accident involving spent fuel, e.g., utilization of a single failure-proof crane.
f S.
Provide copies of all procedures currently in effect at your facility for the =ovement of heavy loads over the reacter ccre during refueling, s
the spent fuel storage pool, or equipment required for the safe shut-down of a plant that is operating at the ti=e the move occurs.
9 Discuss the degree to which your facility complies with the eight (8) regulatory positions delineated in Regulatory Guide 1.13 (Revision 1, December, 1975) regarding Spent Fuel Storage Facility Design Basis.
1
Attechment 2 RESPONSES f"O INFORMATION REQUESTED 1.
The physical relations between the reactor core, the fuel transfer canal and the spent fuel storage pool are illustrated in Figures 1-7,1-8, l-9,1-11,1-12 and 1-13 of tne Calvert Cliffs Final safety Analysis Report (FSAR).
There are no loads moved on the refueling floor.
7 h
The only objects required to be moved over the reactor core during refueling are the reactor vessel head and the upper guide structure (and the ssociated lifting rigs) both of which are removed from the reactor at - the start of refueling, transported directly to their respective lay-down pads, and returned to the reactor at the completion of refueling.
The spent fuel shipping cask is the only object required to be moved over the spent fuel storage pool. The casks are moved only over the cask storage area of the pool and not over the spent fuel storage area of the pool.
This item is discussed in the response to question 3, below.
3 The NFS h shipping container is used at this facility.
The dimensions and weight are contained in the Nuclear Euel Services application 49ted October 6, 1972, as supplemented, Docket No. 71-6698, certificate of I
compliance No. 6698.
h.
The heavy load drop analysis is provided in the, answer to Question i
5.26 in the Supplement to the FSAR.
l 5
No heavy loads are carried over equipment required for the safe shut-j down of a plant that is operating at the time the load is moved.
6.
No heavy loads are carried over the fuel transfer canal. The only heavy load moved over the pool is the shipping cask.
An accident with the shipping cask would not result in leakage severe enough to uncover
- pent fuel.
See Question 5.26 of the FSAR.
7 As previously stated, the only heavy load moved in the vicinity of spent fuel is the spent fuel cask. The potential for an accident in-volving this load is prevented through the use of. both mechanical and electrical interlocks on the overhead crane in the spent fuel handling area.
8.
Enclosed are copies of the following procedures which control the movement of heavy loads over the reactor core, the spent fuel storage pool or safe shutdown equipment:
HE-1, HE-2/0, HE-3, E-16, RV-7, av-8, RV-17, and RV-18.
9 The degree of compliance with the eight regulatory positions of 301.13 Rev. 1 are as follows:
1.
The spent fuel storage facility is designed to Category I require =ents.
2.
The,. spent-fuel storage pool is tornado-protected.
3.
Interlocks prohibit crane =ove=ent over spent fuel.
-- Attachment (2)
- h.. The spent fuel pool is located in the auxiliary building, which is equipped with a ventiltition and filtration system that limits the release of radioactive materials to the environment. The radiological consequences of a final handling accident are analyzed in FSAR section I
1h.5 5
The spent fuel pool is designed to withstand the impact of'a spent fuel a
shipping cask while still retaining +.he required water level over the I
stored spent fuel. The crane is designed such that it canhot be moved
[
over stored spent fuel.
ts. No drains, permanently connected mechanical or hydraulic systems or systems for maintaining water quality and quantity could malfunction or fail resulting in a loss of adequate cooling water to the spent fuel pool. See FSAR Section 9.h.5 7.
Radiation moniters alarm both locally and in the Control Room in case of a high radiation level in the spent fuel storage area. This instru-mentation does not actuate the filtration system. However, the control room operator can actuate the filtration system from the Control Room upon receiving the alarm.
S.
Both the makeup and the backup cooling systems for the spent fuel pool are seismically designed to Category I requirements.
p e s = = =, C....*.~
visa s
).
.4.
.............,==.ymfe.3=.
3 1%n..ua r n: ~.
u...:...sr cw-..-
o1
. COVER S12.I
U:C 'O. 20, cc:e::ra
/,
/
...e.r.....,.
..c.gs sa.3.-..-.
-.._3 p.
1 M,,.
.c
.....n..m
.v COV."un".:..'*A.R'..'..'.~.'.
a.
i,..
I
, c.,,
I.,.,.,
- k.... c b,
2,.,a
.n, e.,,, e
..eu.4 a :
e.r -
.i., e s
e l
v w
Orit-!n11 Rnv 1 M. E. Febersen 11/23/76 S. J. Mart.in si/25/7L J. A. 3asile 11/2L/7h Rev 2 M. I. Roberson 12/17/TL R. '4.
~, cue L2/1T/TL S. J. art in 12/17/71' Rcv
=.."..~.'~.<..e..
=. I '. f., I ~. ~
- o...
- c-.
D
'"' I '.~. I". ' 9 mu.c' =. s w~..
=.t ' ~. i. ~
'~
. j.:
O i.j
,,I Rev 8v. _ '.w*,s n/. /,... s -- ; 2. s a. is .u i1i. ~ n,, - 1 Rev i./- /h/// f[
- 7 j;'tA?C,h
.h.f.t, - - .'} fb ('7':, .,. =.. " .d. n',, c. e " '..,,- .,a e
- v S^S Da.e sw l'
- n. $,. 4....
8 ...i.... r e,
- r.......
. f e. e..f. ;. 7n..2
- 3. y.
n. v. ...4. l
- z..y e...
,...,..e ...f..- ". 1.0
- o..
c...'.'-- ^'.*;..'~.~ R.v. Jea. C a. *.c. t i c, f*. .s .s Rev,a .? ,-f.f.j .a j ,e 4 ,i O g.,, ~ ~.. i l i i C"',.'y,,',,,. ;,"s ^*',,.';',,,,,~;,;,, y,,,
a.
== w, 1 .e... c... - m J ...4... l 3., u........ '..t... '. '4..e. 4.....:--."".......a.....: .t.' ;...... .:.......... i. .s.1 ..e..: p,9* ........J. 3..J.,..., e n. ... J. . a r .,...J...... ,...,.?.*.. I .*.t....-..... j. w
i l t 3V 8 ,..e.m. a....,. rO.4 , :A m...m i..e-,, = 3 ,wu. .n I. IT:'RODUCTION s This procedure specifies the sequential steps necessary for the instalia-2 w h tien of the reactor vessel closure head. "his procedure is applicable E to the Calvert Cliffs "uclear Power Plant Units #1 and #2. tI. w-r_-.,.-.Lr,..e A. CI Dvj!;. E-306~-165-010, 'nstru: entation Flange Asse=bly C.-'..'h,r.,'.*^w6~e ' 4~>-O.'.,, '"7 .T.s. a.'A.' a*.' .a. Ar.an,...en. A e. 3 .s. . -,,,. = .2.m..4 ..;-v ., c s ..s, An wwre .se.,e,.,,. A se.. .4e ~,, ~. e-. -* * *
- I **, t =" e n ::
v E=.. -- W- ~,. 4 U, I.. ?*-* 'N*,
- h*
- U 3. E','=,. 4..
c.- 1* u w .6
- r..
}. T, .*'t."J..q -'.1. C,,.a
- m.,5...
T....s.4 as, e ,,g 3,. r*-* a w e. .. ~... o. .g ?.. e..- 3..,. .r..O r,J h e.y, C s.. . r..a,4
- 4 4 4.. 4.,. n.. 4. Ass.
,1.. e7 a G. .t.ac.. yesse_1 Asse. _i.. T.. ...4a, .u.n ".u a_, L"
- ,. 0'2..". c.
9_.1 4.,"s / 7. *.1 4."1 .w. .. j ..a... J -c 0 L.*.*d,.s 4 __e + e.s, 3Q*.E.4_1s a.r. 9.T. a;- . 3 . ;.~ .- - E -,- c 3 - e' 2.',, c..i,.~~... E.. ' '= aa ne. Da %'.d.' s v. .s_ g. a v-e',., .-:... ::s 2 4 w e. 4, ...,,....u. -..g w.. ..s .r. - d.:.q - =. =P*,.a.e....- ft,..........,,.............,*4.
- e. -s.
a- +u. . w. sag. -s .=.-..,.~.......; .e. -c.. . g.. J su.. .ll *. ?- c* 0, aJ-.,7, a.9 a e,.. t*-* g. w w g. a.. .,.t.* ha- .3......... ....J*. a 9 a r ".,... .....a i ~ ~ - ' i ~. ~,........ =...!. '2... a.. .. ~ - = * = i l l i I t-
a 2-k. Lifting eye bolts, piece Ho. 216-lh of Reference II.. 3 Wire brush, acetone, ripple cloth or equivelant. 6. Super _ Moly, pre =i.xed 3o.h02hc or r.oly coat 351. 7. 2.... a 3 4.,. 4 n 3 eye o,.,_3. s, _4 . e.,.o. c., L-v 4 o,2.e.,c.e,.. n..v. m y 5 8. Nut vrench, piece No. 21h-13 of Reference II.J. 9 Lifting book, piece 3o. 21h_21 of Reference II.J. 10. Drill motor and vire whe2.1 with extension sha_^. for cleaning stud holes. 12. Stud vrenen, piece "o. 21h-17 of Reference II.J. ~.... a ._., z, _ a...<. e, < e, e -,. m.,., r. n_, o. 1e.r e e..... w lb. Containnent polar crane, la ge hook 15 Reacter vessel head lift rig
- 16. precisien level
......_c.,,...._z.,..,a...a_... ...e..e_.e r .-.m. .w. . s. :,.. _ se. o'.__ s._... a .e. 9.: e. a.' e.4 ' o,._' v 4 * *
- 3. 4..d.i...
~ wheels. ~ ..-... a.- a._. C...., P, . _ a _..,.7. ..y ._.s. i \\ ..~. - - t- ....a. a.. .s ..,,7 n y s ~ w
3_ h. Dool accou.rability in accordance with CO-:-206.3 5. Visually inspect that the cru extension shafts are entering the ther=al sleeves with no interference vhile th_6 head s is being lowered to avoid the possibility of da=nging the shafts. e i-A pole may be used to direct the extension sha*ts if required. C. Initial Conditions 1.
- 4ater level inside the reactor vessel is no higher than six inches belov the reactor vessel head = sting flange.
Verified by Date 2. .-2 k, ?:le.: Crs.ne Checkcut Procedu e has been : - leted for the large hock. Verified.by Date 3. Reactor Head Li*t F.ig is asseniled and installed. Ve-* ".e." 'a.e L. F.7-22,. ten: tor liead Gacket ?.eplacement Procedure has been ,. c.. . a.. ..e .......... ~... ..a _~.. ..........z ) \\- \\ ~ j .s........... 2. l l
L-NOCT - 52e folleving steps D.1 and D.2 =ay be perfor: red in any order. D. Stet-by-Stet *rocedu-e 1. Peactor vessel head hookup end lift. c Engage the polar crane large hook on the R.V. head lifting a. bail. Insure the bail is centered on the book to avoid shifting when lifted. b. Take a strain on the head li*t rig, do not lift the head off of the pads at this time. c. Jos the large hook in the up direction. At each jos measure the distance between the head 'lange end *.he lay-down pads. If one side is higher than the others adjust the polar crane position to even out the reasure=ents. Tnis process should continue nntil the head is clea of the laydown pads. It is extremely i=portant that the head does not shift assinst the laydown pads. d.
- icen the head is clear of the pads t&e tvo readings, oO apart, vith a precisien le tel on a s.oc h pa-t of the head u-4-.
.g eni3: ---2--- -er-;e.g.,- n,;,, s. ~,, -.. /n_ a Actual Reading A :- 1 ' ". '.i- - . ~;.
- ...i m --
are r nt e r
- c. n. : : ? in.' '. 1:. a r Ol e T.*.
e e
5-the bail to shift on the hook and give a If a.er several lifts the head level lift. a is still not level contact the appropriate mechanical =aintenance fore =an. At that time _ rr the decision vill be made as to the necessity a of edjusting the turn-buckles on the tripod lifting frame. Record all level readings taken during this process and attach to this procedure. / Signature Date Q.C. I Signature Date 2. Reactor head gasket and reactor vessel flange cleaning. a. Wipe with clean eleths, gasket and reae cr vessel head flar,ge seating surface. b. Wipe clean all areas around stud hole plugs c. Inspect the reacter vessel gasket surface fer cleanliness. Sis surface cust be free frc all ble ishes and di-t that eculd effect the "O" ring seal. 31enishes should be blended cut tv hand :-i tin:- -ith a fine abra:ive eleth. / / Signature "'i m Date i
- _.a
~ ~. L *.....L.? ~ 1. 4 I ret-.cr
- el.
l l ) monitored during lowering to insure proper alignaent pin engagement. - CAU"'IC's - ? Insure that when the CEA extension sha*ts enter the sleeves there is no binding. A pole may be used to move extension shafts during lowering. If binding does occur, contact Ii?I-M before proceeding. c. Recheck the Reacter Vessel & R.V. head seating su-face for cleanliness. I SiE=ature Date h. Lower vessel head until touchdo'.rn. Rer.ove hoch. / / Signature "'i=e Date m~ _ Steps L ~x7 een be ee-oleted prier to step i. c.-- a. .s..,... .s (1) Screv the threaded od asse:ily to its upper =est ...a...,.- .s... ,.-.,.a. _~ w ...,..........._....,-......u. r ..s 2, .t..-..,e...
- i..m ';.
....2.-<..r-i L . ~.. +,. -. - - -, _.,. .v._ c
-T-c. Re=ove spacer block and vasher. d. With stud hole plug re= oval tool, re=ove plug. NOTE - E. 'Ihe T-handle of the plug handling device must ' a be enga6ed in a clockvise direction to avoid decrecing the diameter of this expandable plug and disengaging this handle from the plu6 body. Clean stud holes with extended wire wheel en a drill =ctor e. or equivslant. f. Inspect the stud hele for foreign =aterial. Inspect the threads for da= age. Minor thread da= age can be cor ected by chasing vith thread chasing tool. CAL"ICM - Great care is required when perfor=ing =inor thread repairs in the stud holes to avoid 4 age to unaffected threads. l z. Ps.: ce -..- icles fr:n ::.: h:le: v_ h a. a: := ' e r.er j 1 l h. If t';ere is any questien as to whether P.: -her threal verk i -.. n,.. i. . a :- .. '. e i - . s ' - ' f.:--- 3i --i---s .h. g g g 6 4. s.3 .s. ......e um . t
3-1 l l l one circular piece of standard bond paper l (63jh" diameter) into each hole. Ensure the 1 paper dise resig squarely at the bottom of ) each stud hole. s e k. Place vasher on hole flanga. 1. Start stud by hand approx. 3 threads before using machine. Use machine to screw stud in until stud bottons. Remove stud handling device, back stud out about 1/2 m. turn by hand. / / Signature Time Date n. Repeat steps a through k for each stud. / / Signature Time Date 6. Align =ent pin re:.cval. a. Install the lifting eye in the top of the align =ent pin. b. Withla veight scale on the re'ueling =?. chine hoist er polar crane suppo-t the veis;ht of the slig.nent pin. n...-..- .. ~. .:,...,...,._.s._., ..:.,,..............._..,...z............,.., a. w..o.1.e. 4.s s...A .w o. .. ~ . u..,, 2.....,a... .,..,...._=.2.
- o..
= .......o. .~. ,.s...,........: p 9
4 - 7 Clean alignment pin stud heles and install studs in accords::e with step 5 of this procedure. / / 0 Signature Time D_ ate r E. Post Maintenance Test Pecuir=ments ~ E 1. None 17. A"_TACEME"TS A. Stud Hole Inspecticn Sheets 4 l 1 ~ o- 'l
i i 1 I i i } t ^ e a e e ~ l 4 e f 1, 6 g e e "g t i 1 I i s c l h k N kw Elme b= E= r.4b
- =
0m e CO ~ M M CI: 4 2: ME OC = O W CC Q N k ~9 h k b I C b I. I
i l I t i e i i e l i I 8 i a .0 I t .= h I i l 1 b-- i f l i i I l i i j i e 6 t i N l l l i i I t + t i r e t ti L, t I .N n. g. I l l l 9 u= bi 1, = me ,b, bC i-LU M M = 0 = m 6 a g i O O b E D Q k U N M N N N N e s 4 l l l l l
i I' k h i f 8 t. e e a e i f 8 s .e - * * * = S 9 9 [ M f i l l i i l I e 4 I 6 l c i d l Ti
- m-==*
O 0 e: C T," Mc: . '.eb Ce t: O P-4 C: 2 w >=e C e C. s k ? A T 1 b-o O N m V Q b c O o N 8 N O O O tO C to to O tO q 't -? + s . e k. e
t5 [ 4 e i i k l 9 a m. .~~e e - - ~ ~ - = I M sl t. e l I, I 3 i . i i i. .i i i f I l t i u i l i l l ? l i l 's i l C e u 1 t 1 I t .f. n r: r. I n o w t 9, i E: l ,-e s be 2:< i-2: C ~ = Cao a 2 ~ a.b t 4 ' h-h N Y M b g v t + t v v t W w to o o a OPc i I i t
~ CCI 201 Change 1 ATTAC1! MINT (2) h. / g p. t CAL 7IRT CLD"FS EUCLIA.R PO*dIR FIART MAI.HTINANCE PROCDURI \\' i limmber' RI-1 g 4 1ROCDURI T--.I TRIPCD ASSEMBLY TRANSFER FROM COEE SUPPORT BARREL'L FT RIG TO UPPER GUIDE STRUCTURE LIIT RIG. ~ RITEnTION.-me.IOD Writtenhr Date TOSRC, .Date ved Rr Date *~2 [ ~ Oris inal W. C. Man 1 " ' '/7'
- i. -
~ Rev. 9 In O nder.t Reviev Date OPS CAI Date ~ u/. ,: ~ ~ 6/25/73 Y-e 1 3 NoL/./977 0-iginal/.M. = K Rev. - - - - - - - - -,,- - -COMPLEIID PRO CEURI- - - - - - - - - f - - - - - - - COMPLE!ID Signatu:e / Date EUCLEAR PLAST IHG h.::(-MAIEIINANCI Signature / ~.Date PLANT OPERATIOHS & SATITY RI7!I~i CCF2CITIE Mtg. Fo. / Date CHIEF INGINII3 Signat=e / Date e e e eo e se e S l o ,,e- -+-w- ,m..,a
- e, - - -,
,a u w - -+m n~---- w----
~ i i i ~ CALVERT CLIFFS NUCLEAR POWER PLMIT MA.INTE3ANCE PRpCEl'JRZ #13-1 TRIPCD ASSEGLY TRAILW. FROM CORE SUPPO*"' BARREL LI5T RIG TO UPPER GUIDE STURCTURI LIFT RIG eIE-1 ^ I. INTRODUCTION 0 ? A. This procedure vill specify the steps required for transfer of the b tripod' assembly from the Core Support Barrel lift rig to the Upper Guide Structure lift rig. This procedure is applicable to both Units #'. and #2 at Calvert Cliffs.' II. REFERENCES A. C.E. dvg E-STD-16 L200 Tierod assy & de: ails B. C.E. dvg E-STD-16L201 CSE Lift Rig Assembly .C. C.E. dug E-STD-16L202 CSB Lift Rig Spreader Weldment D. C.E. dwg E-STD-16L203 CSB Lift Rig Assembly Details E. C.E. dwg E-STD-16L20k CSE UGS Tool Assembly F. C.E. dwg E-STD-16L205 UGS Lift Rig Assembly G. C.E. dvg E-STD-16L O11 CSB Assembly H. C.E. dvg E-STD-16Lolk CSB Upper. Section I. C.E. dvg. E-STD-230-085 CSB Laydown Pads J. C.E. dvg E-STD-233-kl7 R.V. Guide Pins i. K. C.E. Instr. Manual 8067-k85-16L2 Reactor Internals Lift Rigs L. C.E. Instr. Manual T2167 & 73167 Reactor Vessel Assembly M. CCI-107A Systems Cleanliness Requirements H. BG&E, Calvert Cliffs Procedure #RV-21/0 O. BG&E, Calvert Cliffs Procedure #RV-18/0 II
I. PROCEDURE
A. Prerecuisites The following tools and equipment shall be available and operational. 1. 1 can of.neo-lube with applicator. 2. Strap vranch for 3" rods. 3. Wrench, 2 3/k"'open end. i h .-....-n..-
______, h. Wrench, h 1/h" open end. 5 Torque vrench for torquing to 10 ft-lbs. 6. Wrench 13/16" open end. i 7 Plastic hammer [ I E 8. Three (3) 15' length of 1/2" nylon rope 9 15" piece of 1" brass round stock with attachment 10. Polar crane B. Precautions i 1. Tool accountability vill be in accordance with CCI-206. 2. Crane operation shall be in accordance with CCI-210. 3. Insure a M nf=um of 5" of thread is engaged in the tierod elevis. k. Observe all radiological control boundaries and signs. Treat all fluids and ce=ponents as radioactive unless certified clean by Rad-Chem. C. Initial Conditions 1. If UGS lift rig is in the refueling pool layde m area, then refueling pool level must be belov UGS vorking platferm. Verified By Date 2. All temporary shie W ng and cen' h ent devices, if needed, installed and certified by Rad-Chem. Verified By Date 3. HE-h, Checkout of Polar Crane, has beca co=pleted. Q.C. Date l l
3
- o D.
Step-by-Step Procedure )- 1. Travel polar crane with hydra-set over CS3 lift rig and engage the lifting bail / clevis of the lift rig with hydra-set-hook. 5 Signature / hme / Late
- 2. ' Attach a nylon rope to each tierod lower clevis.
Signature / Time / Late 3. Using a 2 3/h* wrench and a strap wrench loosen and remove nuts and washers fra lower tiered clevis bolts. Signature / Time / La*a h. Take a strain aa the nylon rope and drive out elevis bolt: using a plastic ha=ner and stock. Attach nuts and washers to bolts and retain for installation. Sipature / hme / Lad - 5 Slowly lift the tripod assembly, at the same time use the nylon ropes to prevent tierods from rapidly swinging inwa:f.. Contdm this procedure until the tierods hang vertically. Signature / Time / Late 6. Travel the tripod use=bly to the position above the UGS lift rig. 1 Insuring the 195 leg will be matched in its correct elevis, spread tierod legs with attached ropes and insert bolts. Lubricate belt ~ threads with two coats of neolube. Signature / Time / La a 7 Tnstall washers and nuts on elev s bolts and using a 2 3/h" wrench and strap wrenen, torque nuts to 10 ft-lbs. Torque ;irecch S/1; Signature / Time / La.4 q.C. i Signature / Time / Date
4_
- s g.
S. Review EE-2 for recorded r %,ges, if a=y, tb the tripod asse=bly. If changes were made, then the tierods =ust be returned to their original le=gths used 9,e= lifting the UGS. Hecord ery changes to I the tierod length below: E o 75 Leg 195' Leg 315 Leg S16:arre / Time / Tate O.C. sis =avre / Time / I, ate 7 2. Post t'a"tenance Test Recnirements / a 1. None 4
Cha.nge :. i M ukv er m d r ~e s r m. 6-e i kp a <>m_. v.npw - p 3p p *u..yT_ y.m. y a +.m CL,.hm.,.=, C'.:: a,. ge.a - peg ta .a- .an-u - ~. . s,. e.
- s. m
- v. m=.*.s.*ro -. ~ ~ -'
a _..s r.
- m.., cm..... y~,.,,v.P :n_.. u-L73.p y-... emy73,mm,,g y g 3_y.....u
- m.,.
r c .q e y, p p r..
- g. =
- m..,,
vu ..s.. u CY T*it. go...' ?.r*.p D.."a C O. t..r,a.n. _; 3 ?a ~. w T.:.:. a.1,., - - .,p Vritten 2.- Date ICSRC Date f /Ainreied 2.- Date 4 ~,. :c p=C 1-i-w 'I - u-f t +' ( i p.>.- ~. WaL-kI= ' * -W Orit-inel l'ia d,.. u _ n_.!'_'_,- ~ Rev. Indenendent Reriev Date OPS OA? Date 4 u * * ? - k S* .!/ dl'f 'I M Ort r-int Rev. _____.__com m moc=m_________________ comm Signatre / Date 1&.CI, a. '. l Ph.., u.l :. e.,,m. _.._.....-. .:.a . u r. i-Sigsctre /.Date w.Gv., 0e... r. n...5 L,.e. -...v. p. _ n C.ei.a..r-, o. c. u. Mtg. 1.b. / Date C"s.~L" v'W
- 6. '. o.
s Signature / Date l
un.. v. ~.n, C. r..c.- ..v-u:A;-. .m. 3m.. n.s.. :....., .,m-
- r.. a L,,.:..2:.
hr..:.-210 .a a :,.,. n.s - .a a ;,y m. wc.c.*. e_tu*./ **i*.***c.'* - - * *. L'30. ' '==. G'u ".** 0 7...
- u* 'Y *"'. -*
- T M.. 7.'a' f."'vn YT u m..7
.t'.'.O.*.#O..".
- C r
. an.. - ....s. 4 - '.:AEF.L1 S??.EA.JER 3'./.M
- -!E-2 / 3 r
-... n.., nn. 0., a~ .Thisprocedurevillspecifythestepsrequiredtotransfer}thetriped 4 { s.ssembly frc: the upper guide structure tc the cere cupport barre'. spreacer bea=. This procedure is applicable to Units #1 and #2 at Calvert Cliffs I;uclear Power Plant. -. r-...:....w..r e- ~ A. C.E dvs. E-STD-16L-200 Tierod As::y & Details B. C.E dvs. E-SD-16h-2Cl CS3 Lift Eig Asse bly C. C.E dvs. L-STD-16k-205 UCS Lift Ri6 Asse bly D. C.E Instr. "anual 8067-h35-16L-2 Reacter Ir.ternals Lif. Rig E. C.I' Instr. Manual 72167 & 73167 Reacter Vessel Assembly r.L.. ewr I.m. e. ...w. / A. Prerecuisites_ The folleving, tools and equipment shall be availabic and operational: 1.
- Teo-lube with applicator.
2. Strap vrench for 3" rods. 3 Wrench, 2 3/L" open end. k. Urench, k 3/L" cench. 5 Torque vrench for torquing to 10 ft-lbs. 6. 12' ladder Three (3) 15' length of 1/2" nylon rope. 7. 6. 15" piece of 1" brass rour.d stock. 9 iia==er 10. Polar crane and hydra-set. 3. Precautiens 1. Teci accountability vill be in acecrdance vith CCI-206.
2. Crane cperation shc.11 be in accordance with CCI-21C. 3. Insure a =ininun of 5" of thread is engaged in the tierod clevis. h. Cbserve all radiclogical control boundaries and signs. Treat f all fluids and conpenents as. radioactive unless ce ified clean -1 bv Rad-Chem. C. Initial Conditions 1. If CS3 Lift Rig is attached to CSE and both are in refueling pool icydown area, then refueling pool level =ust be belev CSE spreader beam. Verified bf Late 2. All tencorary shielding and containnent devices, if needed, installed and certified by Rad-Chem. Verified by Date 3 HE h, Checkout of Polar Crane,.has been completed. M
- c. C.
Date s. V =
_3-D. Ster-br-Sten "-ocedr e 1. Travel pelar crane with hydra-set ever "JOS lift rig and enta e the lifting bail /elevis of the lift rig vith hydra-set hock. A b ? Signature / Time -- / Date e 2.' Attach a nylen rope to each tiered 1cver elevis. Signature / Time / Date 3 Using a 2 3/h" vrench and a strap vrench icesen and rencve nuts and washers frc= lever tiered clevis belts. Si. nature / Time / Date k. Tcke a strain en the nylen rope and drive cut elevis belts usinc a plastic ha==er and stock. Attach nuts and vashers to belts and retain fer installatien. Signature / Ti=e / 'Jate 5 Sicvly lift the triped asse:bly, at the sa:ce tire use the nylen repes to prevent tiereds frc= rapidly svinging inward. Continue this preceiv e until the tiereds hang vertically. Signatre / Tine / Octe 6. Travel the triped asse=bly to the position abcve the C23 lift rig. Insuring the 195* 1es vill be catched in its correct elevis. Spread tiered lags with attached ropes and insert belts. Lutricate belt ~ threads with tvc coats of neelube. Si6nat=c / Time / Date b <yA .c. q V Signatre / Time / Cate
h-7 Instell vashers and nuts on Clevis bolt and usin6 a 2-3/L" vrench and strap vrench, torque nuts to 10 ft./lbs. Tcrque '<.'rench S/N Signature / Time / Date r A
- x. 'y Q.C.
d Signature / Time / Date 8. Recorded Changes - NOTE - For Unit !2,the proper original tierod lengths have been established for use on the UGS. Therefore, the first time this procedure is performed, it is not necessary to review E-1. Review E-1 for recorded changes, if a=y to the tripod asse=bly. If changes were made, then the tierods must be returned to their original lenSths used when lifting the CS3. Record a:y changes to the tierod lenth below: l o 75 Leg 195 Les 31 5 Les Signature / Ti=e / Date k T [ QC Si pc.;ure / Time / Date V~ Post Maintenance Test Recuire=ents 1. None
Cn'.'h'.:..~.',a. C.*.~~: : =~'..,.. "...O f.:'sUP.:'. r .gu m, -.. g. . : n. .. =. r n: ..n..: CCVER S*--. UNIT 10, 2 C, CC!C:CN O REACTOR VISE 1.1 EAD RIMOVAL Nt.a.c:.7 RV-7 PRCC m L.er..... ; CCMPCHI'." NU:2.~. iiritten.--j Date Detaile:i Revier 3-j Date General Reviev 57 Date i 0 t e.geg3d Hill Ivans 10/13/7 2 UA L J Lehr5: 3 /15 /~'3 ,f /r/ / s l o_s - r-J M 78 b ,(Y D i-ji'Whhw ll,l-) y-nv. L s R v. S' W.3-tr s t. /!/1 Y $1,W c..::aw <.-if .j . y R3v. Dn. nsv. SQCS Date PCSRC y Approved By Daze ^ .D3u;1 ass 8/1/73 Oris;inal T.S. Gibser, 8/1/73 NA(73-2) k,CE% v. f.) y-7 / 78-/O l - 2. (, ~7 y R:;v. L b. m fdJ/7/ ~7 7 -T M2=ul( 5,^vr7 R:v. C Rev. Rev. Rev. CCMF.'.:. -, PRCCILL?l CCMPL "ID 3Y Sig=ature/Date IUCLT.AR?Lb?INGC---MAZi.:iANCE Signature /Date Etentic: Period Th3 fc11cving reviews are recuired for precedures vith changes: m.; ;n-** n.i. w.... w.e w 4 w Jb;.r... .;.==.*~A~ f a. a re c. y v. w.._.. Meeting u:.:er W.Se[qE" Et e.Ie. Signatu ef; ate
o CALVERT CLIFPS NUC1IAR POWER PLANT P.AIN"I!A'iCI PROCDURE 30. EV-7 RIACTOR VISSIl RIAD RE: OVAL IN*RODUCSON Pis procedure specifies the sequence of steps to be used in the re-moval of the reactor vessel head and head studs. This procedure is applicable to Units #1 and #2 ar. the Calvert Cliffs Nucient Power Plant. I.
- v. ::.r.: a CES A.
2 Dug. E-8067-165-010, hstrumenteien Flange Assembly 3. CE Dvg. E-8067-165-013, h-core Instr mentation Installation Arrange =ent C. CE Dug. E-8067-165-001, 2 Sheets, In-core Detector Asse=blies D. CE Dus. E-8067-165-008, Thimble Support Fra=e Instanation E. CE Dug. E-233 k15, Closure Head Asse=bly F. CZ Dvs. E-233 k39, Closure Head lifting RiE Asse=bly G. 03 Book No. 72167/73167, Re' actor vessel Assembly Inst-uctien Manual E. CE Dvg. I-233 kl7, Alignment Pins Details J. CE Dvs. E-23k-123, Stud, Nut and Washers Details E. CE Dug. C-2k6-118, Plug Handling Device L. CI Dwg. I-233 kok, General Ar ange=ent Ilevation M. CE Dug. E-2k6-000, Closure Stud and Nut Handling Device K. CE Dwg. I-233 ko3, General Arrange =ent Plan O. CE Dvs. I-233 L32, !"iscellaneous Details i l P. CZ Dwg. E-8067-165-00L, Guide Tube Cluster Assembly q. Stud Tensiener Mst:.:eti e. and ai -=--- "-.ur.1 (::0 del NO. 2-5067-1), 31ach Indu.stries R. CI Dwg. I-8067-230-166, Stud Spacer Ascerloly RV-7 II
I. PROCEDURE
A. Prerequisites "he following equipnent is available and operational: - I 1. Stud Tensien.'.ng Equip =ent, 31ach Int.ustries ( : ode 172.o. 2-5067-1) e 5-2. Two align =ent pins, piece Dos. 216-01 and 216-06 of,I_I_. References "H". 3. Fdy-two stud holes plugs, piece no. 216-19 of II. Refe-ences "H". h. '!hree plup; handling devices, piece No. T.16-20 of II. Refennees
- w".
5 One alignment pin vrench, piece no. 216-13 of II. References "H". 6. Two lifting eye-bolts, piece no. 216-lh of II. Refe ences "H". 7 Neolube (Mil-Ir-2h131) 8. Super - Moly, pre =ixed No. h02hD 9 ':hree stud lifting eye-bolts, piece No. 21h-07 of II. References "J". 10. Nut vrench, piece No. 21h-13 of II. Refe-ences "J".
- 11. Lifting hook, piece No. 21h-21 of II. References "J".
12. Stud vrench, piece :~.o. 21h-17 of II. References "J". 13 Stud handling device, piece no. 000-01.of II. References "M". ik. Two "0" rings, piece No. 216-18 of II. References "H". 15 Conta1==ent polar erane, large hook
- 16. Reactor vessel head 11*: rig 17 Centact pyro =eter
- 18. Fi*ty tve (52) stud spacer asse=blies 19 Precisien level,.CC2 in/ft.
2C. Th ee PAR inspectien device alirn=ent pins if cevice is te be installen. 21. PAR cevice ali.:...ent pin i..: n110tien teel. l
~3~ RV-7 22. Strap vrench and 'a nut vrench for leveling 5' lift rig tie reds. 23 0-250 ft-lbs. terque vrench, L + 1 =ultiplier, and socket ferremovingandreplacingheadliftingcapscrev[. 4 { 2k. 1 elve (12) new 2" cap screws, 3GLE Mech. #59-936. 3. Precautions 1. Observe all radic1cgical centrols, 6 and signs. Treat a" fluids and reactor vessel co=ponents as radioactive unless certified radiologically clean by the Radiation Che=istry Group. l l 2. Do not relax the closure studs until the Reacter Coclant Syste: pressure is O psig and the reacter vessel has been drained to a water level at least six inches be3cv the top of the reacter vessel flange. 3 Keep all studs, vashers and nuts in matching sets, indexed to f their respective holes, for reinstallation in the appropriate holes in the reacter vessel en reasse=bly. All itens are individually marked, frem 1-5h, in sets. h. Do not pressurice the Stud Tensioning Device unless the stud tensicner/ puller bar is ec=pletely engaged en the assembled stud. Do not re=ove the reacter vessel head until the head has been vented and the E2 centent has been determined. C. Initial Cenditions 1. The centainment polar crane has been checked out. Verified by Date 2. Stud detensiening has been ec pleted in acecrdance with the apprcpriace precedu: e (EV-39 er EV h0). l Verified by Date
h-QV-7 3 ':'he Reacter Vessel Head has been vented and tested for gas. 5H: Ik552 I 2 Verified by Date k.
- 'ater level inside the reacter vessel is at least six inches a
[ below the reacter vessel head mating flange. we Verified by Date Shift Supervisor 5 52 stud hele plugs are available. Verified by Date 6. The twelve two-inch diameter socket head cap screvs in the conling duct asse bly ::ust be replaced vith new cap screws er cap screws that have had ::DE mar =' lux av=-%atics after operation. Dese cap screws have been terqued to 800 + 25 ft-lbs. Tcrque Wrench Serial # Verified by Date QC Date .'n f 1 l t J e
- S*
6+ .g i
- /
/[f TO AVOD GA*!!!!G,0/J ,,7 w,t sc=z.e sai u = 3: ' / !# ' ThT.I!CC I"*O ECII Jb,t. m. w.._.,.-..... the [t. e
5-gy-7 D. Step-2 -Ste; Prc:edre 7 . n.... Steps #1, ::i #I can te ace: plished c...-,.....~......a.. . e .p y 1. Stud S;teer 1:ser:ica: -e Re=cve the teP elesin s:rev.elece 21h-Ch cf.C a. e 5efere. e " ". b. 1: stall the stud vrench, Attach the closee stud handling device, asse=bly 000-01 c. of H. References "M"., to the stud as fellows : (1) Screv the threaded rod asse=bly, piece 000-15 of reference "M", inte its upper-most positica in the tute. Se nut sub-asse=bly, piece 000-09 of refer-ence "M", =ust be engaged on the red so that it is at the icver-= cst peint in the slot and rests on . the spring, piece C00-05 of reference "M". (2) "hread the stui handli 6 device asse='ely into the eles= e stud. .v Insee tha, all threaded surface have been lubricated with Super-=cly ph02LO cr equivale:'. t d. Using the stud v ench re=cve the head clcsure stud, keeping ten:10: c= the spring of the elesure stud handling device y.<.. s.a. >..-.....a..s. .,.. :..,...,..t. e,. c.... e... a..- ..--,.t..4 .s devi:e vi:n :no sir-cpers:cd.cis: that is su;; r.u frc :ne liftint-fr:.==.
. EV-7 e. Lift the stud a.d install the stud hele plus. Stud hele plu;s withcu. handles (" tee") into ..c.' e s.". *.',,.*,*, 2, - L.
- ..".*.*.t*. *~.'..=.-*.*c..
c p a wi-devi:e is to be installed do not inste.11 plugs into holes. Step =a.i be perferned at the n.cint in time when the plugs vculd nor. ally be installed. f. Install the stud spacer assembly. g. When the stud spacer asse=bly is installed, lover the stud so that its c g lete veicht rests en the spacer asse=bly. h. Remove totally the tvc st','.ds (Nos. 1 & 26) where the align ent pins are to be inserted and place them with the nuts in place and the vashers res-ing en top of the nuts, in their laydov racks. 1. Repeat steps IV.-D.-2.-a.. thrc' ugh IV.-D.-2.-g. for each closure stud. e-Signature /"'ime /Date 2. Align =ent pin asse=bly installation: Inspect & replace if necessary the alignment pin 0 rings; use a. Neolube as a lubricant. b. Clean the alignment pin hole: th eads with acetone scaked, clean cloths. c. Inspect and clean.he thread: cf the alignment pins. Inperfections c be dressed-up u inc hand files. d. lubricate the align ::: pin thread: vith Super-ncly.ebC2LO. e. Re:cv: the pipe plu : fr = the te; cf the alignment pins and .a s., .4.o.a..,. ,c. ...... o I f. Install the ali;=ent pin: in the cle.u e tud heles, en '- A i ~ e d yw.e .*.n. 2 C e. .a . '..,.'.w. ~.~... 4,. ..t m... .t.. e ..w w..u. J
- gy-7 in the holes and tighten hand tight. Signature / Time /Date .J. ? H QO / Time /Date s. 3 Is the PAR inspection device to be inst ="ed on the reactor vessel? Yes No If no skip to step h. Inspect and replace as necessary the PAR inspection device three a. aligrzent pin 0-rings. Use Neolube as a lubricant. b. Inspect and clean the threads of the ?AR alignment ; ins. Imperfections can be dressed using hand files. I,ubricate the alignment pin threads with Super-moly ph02h0. c. d. Remove studs #3, 26 and kh to t?.e storage racks. Install the ?AR alig= ment pins in stud holes #S, 26, and hh, using e. the special ha=dling tool botto=ing the pins hand tight. Signature / Time /Date k. Reactor vessel head removal and placement in the laydown. a. The refueling pool is in a Class cle= " ness cenditien-COI-10TE. b. Connect large heck to 37 head lift rig. Do not use the hydra set. c. Toc 1 accountability under CC: 206 has been put i=to e" feet. d. Slowly raise One reactor vessel head until.it just separates fro: the flange. Adjust crane pesition until head in centrs11y located on aliganent e. pins. U:less step "d" is done the head vill not level itself. av 7 f. Take two reading on the flange 09 apart, to ensure the head lift is level. The re.xi=u= cut of level specification: 'i C.005 inch /fect. eo Signature /!ine /Date M QC /Cime /Date - NO"'E - If RV head exceeds.005 in/ft. lover the head and release tension en the lifting bail. 21s may allow the hook to shift slightly resulting in a level lift. If after several atte= pts the head v"1 not lift within.c05 in/f:., centa t.he unit foreman. g. Re=ove the reactor vessel heai vith the pelar crane and place it in t,he storage girders on the laydown area. Signature /Ci=e /Date j - CAU"' IOU - l Do not allev the head to strike the s:crage girders while lowering. I.. Post-Maintenance Test Re:;,u.irements Hone. k O .N._ A*=^=- -s=( kW = licne. e l
w.t e w. Change 1. 3 A".'IACEMENT (2) CALVI-CLIFFS ::UCLEAR PO*=3 PLAST MAI.T"INANCE PROCDURE Number HE-16 $IROCIT"'. I2E REAC?3R VESSEL HEAD LIFI RIG RECVAL 4 Y DETI5"'IC?; FI3.IOD e Written Pv.-- Date POSRC.. D?.te / A = oYed.2v Date yu, ({jG,w l*.{ o.d * . ~ - a s" L &rr-1 *
- o - i.,
-\\ !IC H-2-75 Oricina.1 Bill " vans 2-1L-73 Rev. .e Inde" pendent Review Date OPS CAE Date $ ' f*. Jt.r m.~ a'M Em / A/e v 7 ? Orieina14 ?' M. , oo,r~e Rev. - - - - - - - - - - - -CO E E"ID PROCI~URE- - - - - - - - - - - - - - - - - 6 &Il Signature / Date EUCLEAR PLA3"' E*i;.i.w :n-liAI'; E';AICE Signature / Date PLANT OP.rRATIONS & SATITY R.. VIEW C0!EE Mtg. Ib. / Date CHIEF EEGIIir:.t Signature / Date 9 .+ 6
Cu...di3m. C..mcuu : ~ i.., n3.ppJ. ZR 3 ...m. e s o...m =..A..C.p. c.0e.-. :.s u n:. /i.., .$ g a.; s i a .n .. s.... nc 1 ~: ,.:.. m 3,........ -r .A.- -.~r.....>,.w., ......n_ y
- v..y.. o~so,. v. o.,
Thisprocedurespecifiesthesecuenceofstepstobeusedb.henrenovin-z t"# the reactor vessel he..d lift rig. This procedure is applicable to Units e
- 1 and #2 at Calw.. Cliffs !!uclear Fover Pla.t.
s..
- u.. : :t:,C o n
A. CZ Dravinc I-233 h39, Closure Head Lifting Rig and Cooling Due: Asse=bly and Details, Unit 1. 3. CI Dravins 3-233 h3h, Closure Head Liftinc Rig Details, Unit 1. C. C Drawing E-233 h36, closure Head lifting Ric Details, Unit 1. D. CZ Draving 3-23h-022, Closure Head Lifting Rig Details, Unit 2. E. CZ Drawing E-23h-027, Closure Head Lifting Ric and Cooling Duct Assembly and Details, Unit 2. F. CI Drawing I-23h-020, closure Head Lifting Rig Details, Unit 2. G. CZ Instruction Manual 72167/73167 Reactor Vessel Assembly. III. PRO *EDURI A. Prerecuisites 1. The folleving equipment is available and operational: a. one 15' ladder b. one mechanic's tool box 3. P eeautions 1. Observe all radiological centrols, boundaries, and signs. Treat all fluids and co=ponents as radioactive unless cer. tified clean by Rad-Chem. C. Initisl Conditions 1. RCS is in a cold shu:,down condition. Verified by Date
. t 1 2. All tenporary shieldin and centnintent devices, if needed, installed a.d certified by Rad-Chem. Verified by Date ,1 3. EE h, Polar Crane Chechout, has been ec=nleted. - A. r T'" I.C Date C w N = D. Ste >-3v-Oten Precedure 1. Vith the Reactor Head Lift Rig hoched to the polar crane, lift it just encuch to get slach in the three pins. - NOTE - There is only 1/16' clearance between the pins and the holes in the shroud. Signatu e / Tine / Date 2. 7nen freedom in the pins has been achieved, take the cotter pins out and retract the pins frc= the lifting rig. Signature / Time / Date 3. Raise the reactor head-lift rig slowly until the legs are clear of.the shroud. Sir: nature / Time / Date k. Vnen the legs are clear, then transport the rig to its laydown area. Pin the legs to the pads provided in the laydown area and insert the cotter pins. Signature / Time / Date E. Post '!aintenance Test none l 1
g p g g....., b &e a.*.* c. hoJ,,L....t ,.... -.....,' M. vs. J s v., J s v. : u : z......,........ _ , u,.,...z. .......~... : a..: u w ca COVER Si~:.ZT U:iIT 10, 20, CO:":0:;[] m;}cIR RV-17 PROCE::L*'.E TI~'LI' P'-"ov/.* c-' *?.';.S. ^~T. C. T. m"r r 09 e 9 e. CO GO::E::T liU'GD Writtc:1 'oy Dice De: iled ?.cview by Date General Revicv by 22:c 3ri r-inal O N Rev 1 ff. Beka w, '_ ' / '_6 /' h E.. J. r a v- ' ' /16 /7 J. A. F~ d ' a ' ' / ' < / ' ': s Env 2 M. Robarsen 6/0/76 V. T., '.'h i ' a+ a - /0/74 ) . *e' ' a r </o/74 Rev 3 E. !!atthias 1/20/79 'f.
- 3. *?ilkerson 1/20/~'
Edbernen 1/20/" 3 2 i'/bd ! ~ t o,.. a ? / ~'" _[ A. Rev C ,i_... -Rev 5 , I ',!.:u l M. ' l.' ' n.~I' l*? W '.3 \\? !? als-W y i., s l SQCS l Date l POSRC i i Aparovar' 'm-I n' a I i l l lOrit in?.1 Rev 1 J. R. S:.ith, Jr. 11/16/?h !'TO. Th-105 R. M. Dour-les: 21/16/~h Rev 2 R.J. renenber.- 6/0/76 76-52 R. M. Deu-15.s 6/9/76 i Rev 3 J. Cc.rter 1/2d/77 77-G2 _ !'d Ocuclasci 1/20/77 ( %,. >...f._l$~.!/ I.'!.'.'!l't 7 jt& /o/M/77 'Yi-I'S Env 4 h ,.p.. t f h*' I 3~W ' ~l0
- IY
- %~ l-30 -i T Bev CO:GLI'~D FE0DURI - - - - - - - - - - - - - - - - - - i 1.' "A6 "..' D.:.'". 0 g Signar.cre/L..tc t g4bfe=*Lm.r e o .o.r.c..m..r.=. w.- = -.n... c.s.... _-...., ; e r. T. ..~.u l Sicnaturc/D:.* c )ctentica? cried 3'ha foll:ving revi:v: a e required fer.recedure vith chances: L.., O.z . r.:.. y c 7 ,.,,..,c... i. ..-4 .a e,.. Meet:nc su::::.- ~Ui.
- ~.**.
..e...'.-. .~'m
~ ~.....
~:
o CALVERT CLIFFS !;UCLEAR PO*ER PLAIIT MAI!!TETA! ICE PROCEDURE #RV-17 U. G.S. & I.C. Ds.:.C"O3 ASSY. RE"0 VAL OF RV-17 I. II;TRODUC* ION This procedure specifies the sequence of steps to be used..for removing the upper guide structure and in core instru=entation assembly. This ~ v h procedure is applicable to Units 1 & 2. II. REFERC;CES A. CE dvs. E-8067-165-001 In Core-Instr. Assy. B. CE dyg. E-8067-165-003 I.C.I. Thimble Assy. C. CE dvg. E-8067-165-00h Gaide Tube Instr. Assy. D. CE dvg. E-8067-165-006 Eullet nose Assy. E. CE dvrt. E-8067-165-008 I.C.I. Thinble Suncort Plate Assy. i F. CE dvg. E-8067-165-012 In Core Detector Assy. G. CE dvg. E-8067-165-013 In Core Instr. Arrangement. H. CE dvg. E-8067-165-010 Flange Assy. I. C5dvg.E-8067-162-019 Gripper Operating Tool Assy. J. CE dvg. E-8067-16h-205 U.G.S. Lift Rig Assembly. K. CE dvg. E-8067-16h-20h Instr. Roist Tool Assy. L. CE dvg. E-8067-16h-031 Upper Guide Structure Assy. M. CT ivg. E-8067-230-001 Reactor ReNeling Arrangement. N. CE Instr. Manual 8067 h85-16h-2, Reactor Internals Lift Rigs. O. CE Instr. Manual 72167 L 73167, Reactor 7essel Assembly. III. PROCC'JRE A. Prerecuisites, 1. Assemble the following tools: a. One can neolube vith applicator b. Inst:-ament heist tool assy., reference K "hinble :up7ert plate lift rir,, reference E l c. I
2 d. U.G.S. lift rig, reference J e. Hydraset f. Torque vrench for torquing to 50 ft-lbs. 6" sqaure plate for aligning UGS (Unit 1 only) f g. r [ B. Precautions 1. Report any kncvn or suspected change in radiological conditions to the Rad-Chem Group in=ediately. 2. Treat all fluids and cc ponents as radioactive unless certified clean by Rad-Che=. 3. Deleted 14 The hydraset must be nonitored continuously while re=oving U.G.S. to detact sicms of bindine. ...a...-.,.-.- ... -... ~.......... 5 The U.G.S. lift rig shall be used only for lifting U.G.S. ve.-tically. Lateral forces must not be applied for the purpose '~ of positioning reactor ccaponents. At no time shall the lift rig be used to move UCS from a horizontal orientation to a vertical orientation or vice-versa. The UGS lift rig shall not be used to lift any components other than UGS. 6. When raising the UcS throush the first three feet of its travel and when lifting the I.C.I. support plate the crane shall be controlled at a slow speed (6" per minute maxi =um). 7 Tool accountability and cleanliness in accordance with CCI-206 ~ and CCI-107 respectively. C. Initial Cenditions 1. Center CEC:1 extension shaft has teen re=oved; remaining shafts are uncouple:1 in accordance with CI-lF. Verified by Date Shift Supertisor or S.R.O.
2. HE k, Polar Crane Checkout Procedure, has been ecmpleted. .g r ' ir ~ Date g d
: QC
~ D. Sten-3, -Sten Procedure I 1. Lift boIt cleaning and inspection. ~ 5 Working from the platform and using the lifting bolt a. torque tool, remove the lift bolt. b. Inspect, clean, and lubricate with two coats of neolube the bolt thread and underside of the bolt head. Place the lift bolt torque tool in its stavage position. c. d. Repeat steps 'a' through 'c' for the re=sining two bolts. Signature / Ti=e / Date 4 m ~. p.-~.- ... Q. C. - - ""~j Signature /, Time / Date 2. Deleted 3 Raise UGS lift rig and travel polar crane to its marked position over the reactor vessel. Engage the guide bushings with respective alignment pins. Signature / Time / Date 4. Lower the UGS lift rig until it rests on the UGS. Signature / Time / Date - NOTE - r Some additicnal movement of the UGS lift rig =ay be required to align the bolts installe:i in Steps SM. 5 Lift each vrench frem its stowed position and 1cuer the attached bolt etrofully i:ito the threaded stud hele in the UGS. !!easu e and record the lencd of tool that projects above the column Iq c. 1 ~--, , ~ -, -, -
~k. l Compare readings ir ,tachment A. \\ 75* Les i 195* Les ~ 5 315' Leg i A. Signature / Time / Date v '4'7 fr~k QC Signature / Time / Date 6. Screw the bolts into the UGS and torque them to 50, 5 ft-1bs. Torque Wrench Serial # Measured and record the length of the tool that projects above the column legs. Cc=ptre with original readings in Attachment A. d 75* Les 195 Leg 315* Leg f 1 Cal'eulate the differences between the values indicated in steps 5 and 6. ' Record these differentials. 75* Leg Differential ___ { 195* Les Differential 315* Leg Differestial 1/ " + /8" Differential acceptance criteria is 2 2 A Signature / Time / Date '7 k 's QC Signature / Tine / Date ~ ) i 7 Disengage the large hook frc= the UG3 lift rig and attach the hydraset, engage'the instrument asse=bly hoist adapter in accordance with reference 'J'. - HOTE - Ensure that the instrument asse=bly lift slinc
_5_ straddles the 195* Leg of the lifting tripod. Signature / Time / Date 8. After coating the pick-up bolt with two coats of fieolube, raise t ~ { the entire lift sling assembly so that the hinged 1aydown bea=s can be retracted. Retract these bea=s and lover the instnment assembly lift sling so that it mates up with the ICI thi=ble support plate. i Signature / Time / Date 9. Lower the instrument hoist tool into the hoist adapter tube. Measure and record the height of the vrench above the UGS lift ris platfom deck. Height: h Signature / Time / Date K{ qC I Signature / Time / Date 10. Screw the pick-up bolt into the ICI thimble support plate and torque it to 1515 ft-lbs. Torqae '4rench Sesial # Measure and record the height of the vrench above the UGS lift rig platform deck. Height: Calculate and record the differential height frc= those indicated in steps 9 and 10. 4 ~ Differential Height: I"i / ". h 8 Differential height acceptance criteria is 1 Signature / Tine / Date 3 =r 7 QC. Si; nature / ice / Cate
v . 11. Remove the hoist tool from the adapter and return it to storage. Signature / Time / Date
- 12. 2aise the ICI thi=ble support plate; hoisting speed 6 in/ttin.
4 maximum. If a hang-up condition exists, it must-be investigated I. E and corrected prior to continuing lift. When the bullet nose assemblies protntde through the working platform, place the hinged laydown beams in the engaged position. Lower the adapter beam to rest on the laydown pads. Signature / Time / Date 13 Remove the lift sling asse=bly from the hook and place it in storage. m Signature / Time / Date 1k. Attach the hydra-set to the UGS lift rig. Co==ence lift of the UGS at a rate of 6"/ min. { Ensure the shim ring is not sticking to the UGS. In the event the shi= ring should stick. Iiotify the fiPEi i==ediately. ' NPE4 liotifled Signature / Time / Date Not RequiredI l (Check) The combined weight cf the UGS/ lift rig is 116,500 lbs. If the lifting veight is exceeded by 5,000 lbs, stop lift and in-vestigate for a possible hang-up. Prepare notes of problems encountered. Si6 nature / Time Date 15 C:ntinue liftinc UGO. After the first 3 ft. of travel crane speed nay be increased. Ynen t.he UCC is clest cf the refu:linq
_3_ pool floor, travel the crane to its mark'ed_ position above the - ---._UGS laydown area. Slowly lover UGS on its laydown pads or cribbing. 0 g - NOTE - k. A The following guidelines should be fellowed to assist in aligning the UGS on its laydown pads. Unit 1 - See Attach =ent 3. Unit 2 - With the UGS centered in the laydown pads insure that the line on the deck of the UGS lift rig is parallel with the south vall of the pool. . ~...- -- -, -. These guidelines are set forth to insure that the nut lock bar.s on the botto= of the fuel align =ent plate are not crushed on the laydown pads. . Signature / Ti=e / Date
- 16. When UGS is on its laydown pads, disengage the hydra-set hook fro = the lift rig elevis.
Signature / Ti=e / Date E. Post !!aintenace Test l. None IV. ATAC!t!T;TS A. Tool Elevation Tabulation B. Unit 1 UCS Laydown Alignnent e 6 e
t i ATTACP'E::"' A i i I icot asit.: ?: rAsutActm: I 75* l _ t_%
- l-sis' IC
= A l d i I c I A l ~e Ie s A n 2s M"l % E i Z't n i 2.u ;'i I 2-DE l ZG'e ' l l i ePPEa re,mDE-u t
- . g'.f *. a.t 2% hi l wYi' l 2't Vi l 2u ti' l 2-1.W"I ZW/i' l
.r-l [5 i /a' l%'c '$ l l IN - @C.E .u.:.t l l l l ~.LNf.It7.0.~05 ACJ.ic t? l l l l l .m c A~ C. _..fg _,C... Il 'l p' j-3 I I n 3 s '-- e,3 II j -1 i D y-- T ll y e rn I{' W D ei
- e. _r e : a g
- l. 't 81 _
w 1 1lUGS-L:72 J l 3 f I EIG UGS-LI?2 RIG l l ei i r! ? ~. I I j v i r I 6 i I FIGURI.1-UCC COL'J'.:I I F:GURI: 2-!CI TOOL e 0
A'ITACE'E*;"' 3 WIT 1 (O!:LY) ims LAYDOTT ALIGT'E:2 N b I 4 O-4 .i I 6 ~ UGS FUEL. SU;;OLi O' GulDE sur.;ts:L ALic.N N ;;;T PLA~E [ I .o \\ \\ \\ . - \\., -. ~~..- --\\ >\\\\ - ~ - - s ) s 5, \\ l ... ~ ~ ~ ~ -- : ~ {.. j / / r y, N f s, /60* CaulDE I DU5HIH4 4 \\. 6" St.CC K - ?:O"E - To assist in locatin. the U"3 on it: 1r.devs pad 2 6" pl te sh uld be layed i: the pcci ascinst the es: side of the scu:h irrd:c. pad as sheva abe.e. Set the U~3 such th;t the lh5* keyvay is 6" f: c= the south layd: = pad as chc ~.
CAL'. ::A-it,1::a . I '. RUCLIail P%TR PL*:;T :'.AI;.I-*A::02 F.P.CCIDURL' COVER SEE r U:iIT 10. 20, C0 c:0:30 i f agg3 RV-18 PROCEDUP.I TITLI INS"'ALLATIc:: OF TE ffPPE= OUICE ST?t*0T'J:E A m IC .. Dr~.~IECTCH *ASSY. - - -, CC:GO!'E::T ITU:GIR-Written by Date Detaile. Revies by Date General Reviev by Date l 1 3ricinal L' Rev 1 M.E. Robersen 11/23/'k Se J. Martin J.A. Basile 11/23/7h C Rav 2 i DA P.X icha/n VJ. nAuf ic.lu In 10.0ad s t h..t h -. 9 v Rev 1 l Rav ( _.Rsv SQCS. Dste FOSRC / Approved by Date Originzl ) Rev i R. Kronenber 11/23/7h Mtg. (Th-111) ..:L dduelass 11/23/7L YU IWs D-? 3~2e ' i % Rev 2 t Rev ) Rev ) Rev = Cc:er.ra raccru?.I - - - - - - - - - - - - - - - -.: 1 CO:GLED 3Y 8 Signature /Date WC Le. P,. i., .,...n...,w,..--..... - ...i. 2..... ~ Signature /D:.te Retention Peried
- Tha folic.ing revie.s are rcquired for prc:cdures with changes:
PLL.,A C:.. ..v-..S & e.--,,a. 3...,IA a m. -,...,-..- v..... I Meeting Iiu '.,er ~ CICC C;GI::FZ?. sm J
.a CALVERT CLI??"3 NUCLEAR PC'.ER PLA'IT !!AI:ITE'iriCE PROCEDURE #RV-18 INS"ALIA=:t 07 S*E L>PER CU*03 STRL*C'"L2E rid ICI DEu u_e.x ASSY. I. ' IIIT*.03UC'"IO7 This procettre vill specify the steps to be folloved when-installine: the ~ .I. Upper Guide Structure and IC! Detector Assy. This procedure is applicable T, to both Units #1 and 2 at ca.1 vert Cliffs. II. REFERE'!CES A. CE Dug. E-8C67-165-C01 In-Core Instr. Assy. Rev. 2 B. CE Dvg. E-8067-165-003 ICI Thimble Assy. Rev. O C. CE Dug. E-8067-165-00h Guide "'ube Cluster Assy. Rev. 2 D. CE Dvs. E-8067-165-Oc6 Bullet : ose Assy. Rev. 2 E. CE Dvs. E-8C67-165-008 ICI Thi=ble Support Plate Assy. Rev.* 5 F. CE Dvg. E-8067-165-012 In-Core Detector Assy. Rev. 2 G. CE Dvg. E-8067-165-010 Flange Assy. Rev. 3 H. CE Dvg. E-8067-162-019 Gripper Ocerating Tool Assy. Rev. h \\ I. CE Dv6. E-8067-16h-205 "G3 Lift Ric Asse=bly \\ J. CE Instr. Manual #72167 1 73167, Reactor Vessel Assembly, June, 1972 III. PROCZtCRE }., A. Prere::uisites 1. The following tools vill be available and operational: a.' Instrument hoist tool assembly b. Hydra-set c. Torque vrench for torquing to 50 ft-lbs. d.
- himble support plate lift rig.
B. Precautiens 1. Tool ace =untability end cleanliness vill be in accordance with CCI-206 and CCI-107 respectirely. I e e
2. Obserte all fluids and ec=ponents as radioactive unless certified clean by Rad-Che=. 3 The hydra-set =ust be monitored continuously while installing UGS to detect signs of binding. L k. The UGS lift rig shall be used only for lifting UG5 vertically. Lsteral forces =ust not be applied for the purpose of positioning reactor co=:enents. At no time shall the lift rig be used to move UGS frc= a hori: ental orientation to a vertical orientat Ma or vice-versa. The UGS lift rig shall not be used to lift any components other"than the UGS. 5. When lowerine the IcI support plate and when setting the UGS through its last three feet of travel, the polar crane shall be controlled at a slov speed (6' per =inute =aximu=). C. Initial Conditions 1. Missile shield is positioned adjacent to the containment equip-ment hatch vith rail stops installed. Verified By Date 2. HE h Polar Crane checkout com ptett. ] ~ ] 7, RJ&
- 4..
Q.C. Signature / Time / Date 3. Refueling =achine is positioned at the Nel transfer end of the refueling pool. Yerified By Date k. All te=porary shieldin:: and centain=ent devices, if needed, installed and certified by Rad-Ohe=. Verified By Date I i i D. Ster-3 r-Sten precet:. e_ _ 'ICTI - It is not 1.nort ut in which order steps 1 L 2 are co.pleted. _. ~
3 1. Travel the polar crane with the hydra-set attached and encare 1 1 j the lift rig bail / clevis. Insure that the polar crane is positioned l /~ at its r.arked location above the upper guide structure lavdown area. l Signature / _ Time / Date 4 g... 2. Using UGS bolt toro.ue tools, check to."que of hold down bolts at 50 + 5 ft-lbs. Torque Wrench Serial # 7 Signature / Time / Date Tl., I
- , 5" Q.C. Signature
/ Ti=e / Date h 3. Raise the UGS fro: its laydown area, approxi= ate veight of UGS is 60 tons. Travel the polar crane to its marked centerline pocition \\ \\ above the reactor vessel. Comence lowering the UG3 to engsge the \\ gali6n=ent pins. s s t Signature / Time / Date \\ k. Continue lowering the UG3 while =enitorinc }.he hydra-set for b indi.ation of interference. Through the last three feet of travel, operatethepolarcraneinslowspeed(6"plerninutemaxi=u=)until the UG3 is seated on the C33 flange. _ 5WE - t There vill be a veicht loss of 30 tons vhen UG3 bottoms on fuel springs. i s Signature / Tine / D tc 1* o PV y,* Q.C. Sir, nature / Time / Date N
-k-5 Disenssce the hydra-set fro = the liftins bail /c'.cvis of the f 1 7 lift rig and espge the ICI lift sling assembly. This assembly g should straddle the 195* 1eg. Position and center the caane a book over the -lift rig ensuring the eAbles are ve. ical. y s-Signature / Time / Date 6. Raise the thimble support plate approximately 6', tilt the bea=s outvard.. Lover the support plate until touch down; controlling the polar crane at slov speed (6" per =inute ~=H-am). Siganture / Time / Date 7. Ensure the cable guide plate seats itself on'to the delta bea=. Also, observe that the cables are centrally positioned in the cable guide. } Signature / Time / Date '4. Working frc= the platform, =anually lover instrument hoist tool s \\ \\ \\,into the ICI adapter and en62ge the tool. t. s \\ Si5 nature / Time / D1te V. Unserev the adapter from the ICI and raise adapter abcut 1 foot. \\ Signanure / Time / Date
- 10. Renove instrunent hoist tool from adapter e.nd store on platfor=.
Signature /- Time / Date ~
- 11. Raise the adcpter to the vo;-hing platfor= and store in the position as shown on Ref. (I ), Section E-3.
l Sic sture / Tire / Date r J ? e
+i ( j
- 12. Lover the crane book to the platform and stov the hydra-set; 1
l re-engage the lifting elevis with large hook. 1 / I SiEnature / Time /_ Date t ? ~ t. - NOTE - UGS Lift Eig vill not clear refueling machine with hydra-set attached. l
- 13. Detach lift rig frem UG3 ty unscreving the lifting bolts with the vrench asse=bly.
Return vrench into its_ storage position, t Signature / Time / Date l II4 Clear platform of equipe.ent and personnel. Raise UGS lift I rig, travel polar crane to its marked position above the I UGS lift ric laydown area. i g 4 \\ A \\ Signature / Time / Date l 15.; Lover lift rig until touchdevn. Disengage crane hoek fre= l l s 'g lift bail / clevis of the lift rig and return to storage. \\ Signature / Ti=e / Date \\ E. Fest f&intenance "'est Fe:uire.ents 1. None IV. Attach =ent "A" CE Dvg. E-8067-16h-205 UGS Lift Rig Asse=bly Section 3-3 i I. 0
ATTACI!!E iT "A" g, 1,, e 4 g f 1 9 l I J f-" a il e l nw E < l 4 m @pl ,/ --g r p ~ i-l 2 t a
- C.
i e M. I t . F"~' f t / t i =1 l 1 m m AM ( W %I 6 N K l N l \\ 'N l j h L._C% h l Ii h s l i r i \\ \\ \\ \\ t \\ t \\- \\ t t. i I e f f ri ~ \\ t \\' ,_ __ _ _ q i i_ Y s k I i ? I l P .I i
p p av e o. s. woweae G w' n ts. A,."P."'.'.*. s' *., - '
- e-Cs'%'La'k'-'.'~.'.'
".~o ~ ~.' & ~ L u.. eTee o..pm. m. *-*.c -. .e e.<,... m,-- - a p ;p m er e==y e
- -=e v..
..r e _....sv.- v r = ", 2 't._, C ^..' ". '.'.". O
- g. 3 3 r:,,
z,r.s., . gera E-3f PROC C'JEE TIT E o-' v~ e '-'e--* r-4 ~ r 1w. v. e: r=. CO.m_ w,.... r m. r. .=-. - , 'Jritten by Date Detailed Review by Date Gencrcl Review b'/ Date I 4
- Orfrinci t.
.i,..n Y!b + b tW^ Y' ? 'I +. ?:!I2!7y 7 'T
- . a w
?cv Rer
- 4 Rcw j
SQCS Date POSRC E Approved by Date i t 1 l [m.N,. ~~~~,h. L r ,c,.~ m e,a /,,,. 4, g. /, j 2 ~ 2 1 -g._ ) s . o / - ' ~ 3.* '7. i l i ?P." 1
- l i
E nv- ) i 1 l 1 COMPLEO PROCICUEZ CCyPL"D 3Y Sicncturc/ Late I l., g w.p. 3..., .g u.:.gp u. <.,-,--.,;.:. - a . m... a. ...:.u u Signature /Da e l l lBotentienPeriod t "he fe'lovinc revicus are required f'er precedu er with ch2nces: t m..,,.n,..-.u on._..
- e., r
-.,...-.C,-..._-- zn .a Meetins mnder
COI 201 Change 1 1 ATTACE?C:TI (2) CALiz.:t? CLITES !TJCLEAR PO'n~ER PLANT MAIZZ:~A30E PROCEURE e Ember M i 4 l 6 1 '.3.t0 C "U". "., ".~. ~ ~_'.
- ? ' "*0". V?.o '." V:.AD ' ". R.G
-"..c". ALu" ' *. T O'.". . c. u y E.
- RE*E
- 7" ION SI"J.IOD
__Vrittih 2v _ - Date POSRC Date Aerhved 3v Date Oricinal Bill Evans 2/1h/73 ', iL M - 2.l 7 ',/ W ( %,_< -
- 1. ~.,,.,.,.,, -
f II* 3 ~7 a, 1:.. Rev. ,n -Inderende:!t Reviev Date OPS CAE Date /
- v. a -w i
Oricinal ' X. :. ',303ERSO:: 10/20/73 ff/ '.,, Lu N C U. 2 7 7 i Rev. I - - - - - - - - - - - - -COMPLE'"ED PRO CDURE- - - - - - - - - - - - - - - - - COMPLETED S1 nature / Date 5 NUCLEAR PLAITT IRG_ar w-!!AIsu;AICE Signature / Date PLANT OPERA
- IONS & SAFI"'r RE7II"n* COMMI?"IE Mts. Ib. / Date CHIIF ENGINED.
Signature / Late l l I I i l -7.- s-p7 -r --ry 1-
i CA*VE30 CLIFFS UUC'IAR PO,iER PLA:.T MAI !TUA:!CE ??OCDUEE #EE-3 EE-3 PIAC"CP VESSEL EEAD LI?!' RIG I:iSTALLA_"IO?! I. IIiTRODUC*IO?i i This precedure specifies the sequence of steps to be used in the z [ installation of.he reactor head lift rig. This procedure is e applicable to Units #1 and #2 at Calvert Cliffs Nuclear Power Plant. II. REFEFI':CES A. CI drawing E-233 439-Closure Head Lifting Rig and Cooling Duct Assy and Details Unit 1. 3. CE drawing E-233 h3k-Closure Head Lifting Rig Details Unit 1. C. CE drawing E-233 k36-Closure Head Lifting Rig Det ails Unit 1. CE drawing E-23h-022-C-osure Head Lifting Rig Details Unit 2. D. E. CE drawing E-2S-027-Closure Head Lifting Rig and Cooling Duct Assy. and Details Unit 2. F. CE drawing E-23h-020-Closure Head Lifting Rig Details Unit 2. G. CE Instruction Manual 72167/73167 Reacter Vessel Asse=blv. III. PROCEOL3I A. Prerec_uisites The following equipment is available and operational. 1. One 15 ft. ladder 2. One mechanics tool box. 3. Freenutions Observe all radiclogical contr:1s bcundaries and signs. "re at all fluids a. i ec=ponents as potentially radioactive unless ce..ified by Ead-Chem. 1 i i 4
i C. Initial Conditions 1. E h, Polar Crane Chechout Procedure, has been-co=pleted. p Q.C. Dste c 1P* 2. All te.perary shielding and containnent devices, if needed, installed and certified by Rad-Che=. Verified by Date 3. The RCS is in a cold shutdos.T. condition. Verified by Date D. Step-Bv-Sten Procedu e 1. Cofmeet the hook to the reactor head lift rig.
- Sig, Time Date 2.
Connect the lift rig to the CEDM cooling shroud:
- a. Transport the. lifting rig direc bly over the vessel head and shroud.
--e e-p, - - - -y n ,e wwv
V b. Lover the li'ti:5 rig ca efully until the holes in the bette: of the legs of the Lift rig line up with the pin holes in the shroud. The legs are natched.arked for eerrect installatien. J h I c. Place the pins th ough the hcles of the liftini rig aa.d shroud. i-6- - RC"E - Tnese pins should not be fereed in the holes. Tney vill go in by hand when the rig and shroud a e in proper align =ent. d. When the pins are in place, insert the cotter pins into the heles. Spread the cetter pin legs to prevent them from falling cut. Signature / Time / Date I4
- 4..,
QO Signature / Time / Oate E. Post Mcintenance Test Hone e}}