bec to DAC:ADM:
i CENTRAL FILES PDR:HQ LPDR Nebraska Public Power District
' '" h Ic June 27, 1980 Mr. Karl V. Seyfrit, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 011 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011
Subject:
IE Bulletin No. 80-15 Possible Loss of Emergency Notification System (ENS)
Dear Mr. Seyfrit:
he si5blect'id:lle' tid requ' re'd' certain ch'ecNsbe made' and-infdrmation i
reported in regards to status of ENS with loss of offsite power.
This letter. is sub. mitt,ed as, the. report.. required by. item 6. of the bulletin.
Action Item 1 The Cooper Nuclear Station ENS phones are powered by Local Telephone Company and not by On-Site Power as listed in the enclosure to the bulletin.
Action Item 2
.Not applicable.
Action Item 3 A test was conducted on June 27, 1980 to determine that the ENS phones remain operable with a simulated loss of offsite power.
The CNS power to the CNS telephone netsrork was interrupted at approximately 9:50 A.M.
on June 27, 1980.
Calls were then initiated from the site to the NRC Operations Center using the Control Room ENS phone and the Technical Support Center ENS phone.
This test verified that the ENS phones remain fully operable with loss of offsite power to our facility.
8008200 b'l 1
e.
J 9
Mr. Karl V. Seyfrit June 27, 1980
.P. age.2.
o.-.... s..
..e s.,
Action Item 4 Not. applicable.
Action Item 5 A directive was issued on June 27, 1970 which requires notification to
. t.h. e NRC. Ope..r.atio.ns. Cente.r.by co.mm.ercial. telephon.e..or r. elaye.d message within one. hour of the time that an extension.
inoperabie for any reason. ~
~
of the ENS is foun.d to be s'
As requested in your letter, it is estimated that three manhours were spent in conduct of the review and preparation of this report.
If you have any dtiestio'ns regarding this 'ma'tt'er,.please ' contact L. C. ~
~
Lessor at Cooper Nuclear Station.
.Si cerely,
..,. :p. m...n...........
.v..
. e s, - s,. ;..-. >.( u.. -
)
- w ;,...
.r.w. s..
~...
.s.....
g J..i. A.iIant..
~.
c
,' DirectoE o'f. ice'ns'ing'.
.,..,..... ~.,.
^
and Quality Assurance JMP:LCL:cg O
.