ML19344A087

From kanterella
Jump to navigation Jump to search
Advises That Revised Target Dates for Commercial Operation Are Apr 1982 for Unit 1 & Nov 1981 for Unit 2.Revised Fuel Load Dates Are Nov 1981 & June 1981,respectively
ML19344A087
Person / Time
Site: Midland
Issue date: 07/10/1979
From: Mark Miller
ISHAM, LINCOLN & BEALE
To: Cowan F, Kornblith L, Smith I
Atomic Safety and Licensing Board Panel
References
NUDOCS 8007290967
Download: ML19344A087 (1)


Text

_. _ _

.. _-~_

Y?

ISHAM, LINCOLN & BEALE COUNSELORS AT LAW ONC FIRST NATIONAL PLAZA FORTV-SECONO FLOCR CHICAGO,tLLINOas 60603 TELEpogoNC 3t2* S88-7800 TE lex: 2-St ee wASMsNOTON OFFICC

, 406o t m STattT.N W.

SCvENTM FLOost

}

July 10, 1979

      • ";",IU;.h'O O

l Ivan W. Smith, Esq.

Mr. Lester Kornblith, Jr.

Atomic Safety and Licensing Board Atomic Safety and Licensing Board i

U.S. Nuclear Regulatory Commission U.S. Ntclear Regulatory Commission Washington, D.C.

20555 Washin$ ton, D.C.

20555 Dr. Frederick P. Cowan 6152 N. Verde Trail Apt. B-125 Boca Raton, Florida 33433 Re:

Consumers Power Company (Midland Plant, Units 1 and 2)

Docket Nos. 50-329, 50-330 l

Gentleaen:

l i-I As counsel for Consumers Power Company in the above-cap-

.y tioned matter, we advised you by letter dated June 20, 1979, of the Company's revised fuel-load schedule for the Midland Plant.

The Unit y

i 2 target fuel load date is June 1981, and the Unit 1 target fuel load l

date is November 1981.

The Company has now completed its evaluation of the duration between fuel loading and commercial operation, and has concluded that the target date for commercial operation of Unit 2 is November 1981 and the corresponding-date for Unit 1 is April 1982.

-l I

l The target-dates for commercial operation were previously March 1981 and March 1982, respectively.

l Very truly yours, 7

Michael I. Miller l