ML19343D584
| ML19343D584 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System, Satsop |
| Issue date: | 04/28/1981 |
| From: | Bouchey G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Rosztoczy Z Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19343D585 | List: |
| References | |
| GO-1-81-119, NS-L-KAH-81-051, NUDOCS 8105050384 | |
| Download: ML19343D584 (1) | |
Text
W P
,P Washington Public Power Supply System A JOINT OPERATING AGENCY
[
$d'/
P.O. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND, W ASHINGTON 99352 PHONE (509) 372 50f April 28,1981 e\\pVi I. I GO-1 119 NS-L- KAH-81 -051 s
Q' Mr. Z. R. Rosztoczy, Chief 9}
y-Equipment Qualification Branch 1.3 O 4 Division of Engineering
-k gJd soff
-3 Office of Nuclear Reactor Regulation
'M A$I#
U.S. Nuclear Regulatory Commission A#
Washington, D.C. 20555 g., _ f >
s!
Dear Mr. Rosztoczy:
Subject:
CLASS lE EQUIPMENT QUALIFICATION PROGRAM On January 16, 1979, the Supply System presented its Class lE Equipment Qualification program to the NRC staff and cormitted to submit an informa-tion report describing the methodology for qualifying I&C/ electrical equip-q ment on the WNP-1/4 and 3/5 projects.
The staff agreed to review the report and provide comments on the technical content and format of the report.
Accordingly, enclosed are five copies of the subject information report for your review.
Should you have any questions regarding the report, please feel free to contact me.
Very truly yours, Ji)bsu cky G. D. Bouchey Director, Nuclear Safety Encl.
W/0 Encl.
cc:
N. S. Reynolds (D&L)
\\
W.
Wood (NRC)
THIS DOCUMENT CONTAINS P0OR QUAUTY PAGES