ML19343D584

From kanterella
Jump to navigation Jump to search
Forwards Revision 2 to WPPSS-0025, Qualification Program for Class IE Instrumentation & Electrical Equipment for Washington Nuclear Projects 1/4 & 3/5.
ML19343D584
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 04/28/1981
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Rosztoczy Z
Office of Nuclear Reactor Regulation
Shared Package
ML19343D585 List:
References
GO-1-81-119, NS-L-KAH-81-051, NUDOCS 8105050384
Download: ML19343D584 (1)


Text

W P

,P Washington Public Power Supply System A JOINT OPERATING AGENCY

[ $d'/

P.O. BOX 968 3000 GEO. WASHINGTON WAY RICHLAND, W ASHINGTON 99352 PHONE (509) 372 50f April 28,1981 GO-1 119 #.

NS- L- KAH-81 -051 e\pVi I. I s Q' -

Mr. Z. R. Rosztoczy, Chief y-Equipment Qualification Branch 9}

1.3 --

Division of Engineering -k gJd O 4 soff #-3 Office of Nuclear Reactor Regulation 'M A$I#

U.S. Nuclear Regulatory Commission A#

Washington, D.C. 20555 g ., _ f >

. s!

Dear Mr. Rosztoczy:

Subject:

CLASS lE EQUIPMENT QUALIFICATION PROGRAM On January 16, 1979, the Supply System presented its Class lE Equipment Qualification program to the NRC staff and cormitted to submit an informa-tion report describing the methodology for qualifying I&C/ electrical equip- q ment on the WNP-1/4 and 3/5 projects. The staff agreed to review the report and provide comments on the technical content and format of the report.

Accordingly, enclosed are five copies of the subject information report for your review. Should you have any questions regarding the report, please feel free to contact me.

Very truly yours, Ji)bsu cky G. D. Bouchey Director, Nuclear Safety Encl.

W/0 Encl.

cc: N. S. Reynolds (D&L)

W. Wood (NRC)

\

THIS DOCUMENT CONTAINS P0OR QUAUTY PAGES