ML19343D577
| ML19343D577 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 04/28/1981 |
| From: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.1, TASK-2.K.3.13, TASK-TM JPN-81-31, NUDOCS 8105050355 | |
| Download: ML19343D577 (2) | |
Text
_-_-__
POWER AUTHORITY OF THE STATE OF NEW YORK l
NEW Yonx. N. Y.10019 10 Cotuusus CtRcLe G EO R,4,,8,[,.,s s,R R y (2126 397 6200 op matine orrecan JOHN W. BO. TON
- '
- .~;:::::::.
9,ygggg, JOHN S.DY.ON
- ~"~
...N...C N.....
- = :':'..,
aaaaEA,'.",a^"'
smeau..a
!.*,'o",*c'.^ U....or RICH ARD M. FLYNN April 28, 1981 2,*Tll'"'"*
no.. r i. wiLeoNr' JPN-81-31
".^.*..L',"".',.....,
P R.D.RICM R. CLAR"
.. u u.6.ow.. 6 Director of Nuclear Reactor Regulation
,, (.h k CD S. Nuclear Regulatory Commission
/,o
-!py U.
20555 Washington, D. C.
N Ippolito, Chief
~
Mr. Thomas A.
Operating Reactors Branch No. 2 p
""iY 0 4 193g.d Attention:
Division of Licensing y
D*
James A. FitzPatrick Nuclear Power Plant s,
Docket No. 50-333
\\'h/'g
Subject:
Post-TMI Requirements
Dear Sir:
The Authority wishes to inform you of the current status 1 of the following modifications which, according to Enclosure 1
of NUREG-0737, are due for implementation by July 1, 198 :
Separation of HPCI-RCIC Start and RCIC Restart _
II.K.3.13 on Reactor Low Level The BWR Owners' Group submitted a conceptual design on in the letter from D. Waters (BWR OwnersThis item requ December 29, 1980 The modification applicable Group) to D. Eisenhut (NRC).
tion approval from the Commission.
h ical to the FitzPatrick plant involves replacement of the mec an i
dashpot assembly of the RCIC stop valve with mi electro hydraul c The Authority is in the icocess of placing an hi.s order for the EHV unit with the original manufacturer but valve (EHV) unit.
been informed that a 72 week delivery time will be pleted is October, 1982.
Installation of Dedicated H> Penetration _
II.E.4.1.2 The conceptual design for this modification, submitted on 1980 in our letter JAFP-80-759, requires pre-The Authority is September 30, implementation approval from the Commission.
in the process of placing an order for the valves required for Based on information received from thek this modification. vendor, the delivery time for these valves is 40 to 50 w D %
f JN3ss~
t e,.
This modification could, therefore, not be completed until June, 1982.
For both of the above modifications, the Authority will attempt to expedite the delivery of the required equipment and will continue to keep you informed of any changes in schedule that may develop.
Should you require further information, please do not hesitate to contact us.
Very truly yours,
/m i
/
J.'
eY l '5enior Vice President Nuclear Generation
[
l i
{
r I
[
i i
i l'
f i
l t
t
[
[
--