Interim Deficiency Rept Re Spacing of Concrete Anchors, Initially Reported 810326.Min Spacing Requirements Violated in Areas Where Different Contractors Are Mounting Adjacent Supports.Addl Rept by 810821
ML19343D394
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/24/1981
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-49-965, NUDOCS 8105040405
Download: ML19343D394 (2)


Text

-

Deycit 7 u.. :.1. me .,ma

,.\

L,... ~_ ;w i I m eas n a: a April 24, 1981 EF2-49,965 Mr. James G. Keppler, Director Region III U.S. Nuclear Regulatory Ccrnission 799 Rocsevelt Road ,

Glen Ellyn, Illinois 60137

Subject:

Interim Repcrt of 10CFR50.55(e) Item en Spacing of Cencrete Anchors (442) .

Dear Mr. Keppler:

On March 26, 1981, Detroit Edisen's Mr. H.A. Walker, Supervisor - Cen-structicn Cuality Assurance, telephcned Mr. G. Fiore11i of NRC Regicn III, to report en a problem with spacing of cencrete anchors at the Fermi 2 Site.

These anchers wurn used to support pipe suppcrts, cable trays, air condi-tiening ducts and other items. Mini:=n spacing is specified on engineer-ing documents and a neber of installations have been noted where this minimum spacing require:aant has been violated. This appears to be occur-ing in areas where two different centractors are rounting supports adja-cent to each other. For instance, a neber of cases were noted where piping supports and cable tray or ccnduit suppcrts were mounted sida by side. Apparently, construction perscnnel as well as quality contrcl inspectors were not paying c1csc attenticn to other contractors irstalla-tions.

Another report en this item, either interi:n or final, is scheduled to be sent to you cn or before Aucust 21, 1981. If ycu have questicns concern-ing this ratter, please contact Mr. H.A. Walker, Supervisor - Ccnstruction Quality Issurance.

Very truly ycurs, r

Donald A. Wells, Manager Quality Assurance D;JJ/HAN/pn O

-[ .Q

.a. .

r '!  %\gp+K [D L #>fgejb'E slosoeo @5 P00RORENL

- i Mr. James G. Keppler, Director April 24, 1981

- Page Two EF2-49,965 cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Progra:rs U.S. Nuclear Regulatory Ccratission Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Ccr:rlssion Resident Inspectors Office 6450 North Dixie Highway Newport, Michigan 48166 1