bb - O3N k8
~g UNITED STATES y"
NUCLEAR REGULATORY COMMISSION y,(
/ 3. ;
n 1
ADVtsORY COMMITTEE ON REACTOR SAFEGUARDS
)
{
g Af e waswisctos, o. c. rosss
%% f January 22, 1981 Honorable Johi. -
wrm Chairman U. S. Nuclear Reguiatory Commission Washington, DC 20555
Subject:
WO-HUNDRED-FORTY-NINTH MEETING OF THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, JANUARY 8-10, 1981
Dear Dr. Ahearne:
The Advisory Connittee on Reactor Safeguards held its 249th meeting in Washington, DC on January 8-10, 1981.
Items considered at this meeting are summarized below.
249th ACRS Meeting The Committee met with members of the NRC Staff and representatives of the nuclear industry to discuss the NRC Staff's proposed requirements for near-term construc-tion permit applications (NTCPs).
The Committee met with members of the NRC Staff and representatives of the Tennessee Valley Administration to discuss the proposed operation of the Interim Distributed Ignition System installed in the Seouoyah Nuclear Power Plant Units 1 and 2, and the results of the start-up tests and operating experience at that plant.
Cocies of reports regarding the matters noted above have been provided to you.
The Committ e continued preparation of its annual report to Congress on the NRC's Reactor Safety Research Program for FY-1982.
During this session, the Committee heard a report regarding activities of the LOFT Special Review Group.
Additional work on this report is scheduled during the 250th ACRS meeting.
The Connittee met with you and Commissioner Bradford to discuss the safety phi-losophy of the Commission, the Commissioners' views regarding the establishment of quantitative safety goals, matters pertaining to the funding of the NRC's Reactor Safety Research Program, and the environmental impact statement for the Virgil C. Summer Nuclear Station.
The Committee met with the Executive Director for Operations and the Director of the Office of Nuclear Reactor Regulation to discuss the requirements for the restart of Three Mile Island Nuclear Station Unit 1 (TMI-1) and the Committee's recomendation in its report of December 11, 1980 regarding reliability assess-ments of the plant as modified.
810 4 0'0 0 9/T. '
y
/
Honorable John F. Ahearne January 22, 1981 The Committee concurred with the regulatory positions of the following Regula-tory Guides:
Regulatory Guide on Functional Specification for Active talve Assemblies in Systems Imcortant to Safety in Nuclear Pode PTants,
] Task No. SC 704-5), dated September 1980.
Regulatory Guide on Nuclear Power Plant Simulators for Use in Coerator Training (Task No. RS 110-5), dated October 1980.
ACRS Subcomi*. tee Activity Since the last report of ACRS activities, the following subcommittee meetings have been held:
Emergency Core Cooling Systems, in San Jose, CA on December 10-11, 1980 Reactor Radiological Effects, in Washington, DC on December 11-13, 1980 Site Evaluation, in Washington, DC, on December 11 and 13,1980 Combination of Dynamic ! cads, in Washington, DC on December 16-17, 1980 Regulatory Activities, in Washington, DC on January 6,1981 Sequoyah Nuclear Power P1 ant Units 1 and 2, in Washington, DC on January 6, 1981 Safety Philosophy, Technology, and Criteria, in Washington, DC on January 6, 1981 I
Reactor Safety Research, in Washington, DC on January 7, 1981 Metal Components, in Washington, DC on January 7,1981 li r
Future Schedule The following items are tentatively scheduled for consideration during the 250th ACRS meeting, February 5-7, 1981:
Reactor Safety Research -- Annual ACRS Report to Congress on the NRC Safety ll, Research Program for FY-1982 Near Term Construction Permits -- Discussion of affect of proposed require-
?
i-ments on plant design ll Reactor Safety Research -- Proposed NRC Long-Range Research Program Plan j*
t iL
a' i
Honorable John F. Ahearne
~3 -
January 22, 1981 i
San Onofre Nuclear Plant Units 2 and 3 -- OL Review (seismic design)
Fission Product Source' Tem for Nuclear Safety Evaluations i
Meeting with NRC Chaiman and' Commissioners -- status of ACRS activities.
Sincerely yours, J. Carson Mark Chairman 4