PNO-TMI-81-007A:on 810317,during Attempt to re-enter Reactor Bldg,Technicians Unable to Lower Submersible Pump Into Sump to Proceed W/Zeolite Experiment.Five Gallons of Sump Water for Experiment Obtained on 810320
ML19343C846
Person / Time
Site: Crane 
Issue date: 03/23/1981
From: Conte R, Fasano A, Kalman G
Office of Nuclear Reactor Regulation
To:
References
PNO-TMI-81-007A, PNO-TMI-81-7A, NUDOCS 8103250423
Download: ML19343C846 (2)


Text

.

PRELIMINARY NOTZFICAT10N 50320810317 March 23, 1981 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-TMI 81-07A This preliminary notification constitutues EARLY notice of events of POSSIBLE safety or public interest significance.

The information oresented is as initially received without verification or evaluation and is basically all that is known by NRC staff on this date.

Facility: Metropolitan Edison Company Three Mile Island, Unit 2 Middletown, Pennsylvania Docket Number 50-320

Subject:

REACTOR BUILOING (CONTAINMENT) ENTRY (UPDATE)

\\

The seventh entry into the Unit 2 Reactor Building commenced on Tuesday, March 17, 1981, and was completed on Friday, March 20, 1981. The entry was originally scheduled for a three day period but was extended when difficulties were encountered with an experiment designed to process a small volume of Reactor Building sump water through a test zeolite.

ion exchange column.

Initally, technicians were unable to lower a submersible pump into the sump water.

During the second phase of the entry, on Thursday, March 19, 1981, the pump was freed and five gallons of sump water were processed through the zeolite column. The five gallons of effluent from the zeolite experiment were retrieved from the Reactor Building on Friday, March 20, 1981. The effluent will be analyzed to determine the effectiveness of zeolite in processing sump water.

Media interest has occurred because of public sensitivity to TMI related events. T'he Commonwealth of Pennsylvania has been informed.

The NRC does not plan a press release at the present time.

This preliminary notification is issued for information only and no further actions by the NRC is anticipated.

t l

The NRC TMI Program Office received notification of this occurrence by monitoring the events as the opc ' rred.and this infonnation was current s of 0:00 a.m..

SN

.KW DW A.( h

Contact:

. KalmanM0-ll36 R. fonte 590-1125 Fas no 590-1123

, d' i h7

. Ba rett 590-1120

[

Cb a dWQgh A U,TRg4198 k r-i

'u N., M b 'v.y

\\t

%4w pN

'* S '

81O3g5gH.%

5*

I

-' PN0'-TMI 07A (continued)

. March 23, 1981 DISTRIBUTION: (Facsmile Transmission Times Noted)

H ST BLDG

// 1[

MARYLAND NATIONAL lE:XOOS /)

  • c8 Chairman Hencrie BANK BUILDING

/ /.'.1[

(IE:HQ Di'st)

Comissioner Gilinsky W. J. Di rcks, EDO~

Commissioner Bradford C. Michelson, AE00 Region I

//.'//

Comissioner Ahearne J. J. Fouchard, PA Region II

/J..w ACRS N. M. Haller, MPA Region III S. J. Chilk, SECY G. W. Kerr, OSP Region IV

/J : 4.3 __

C. C. Kamerer, CA H. K. Shapar, ELD Region V

//l#3 PHILLIPS BLDG //,17 WILLSTE BLDG _/C'.h (MAIL)

H. R. Denton, NRR J. G. Davis, NMSS R. Minogue, SD R. H. Vollmer, NRR T. Murley, RES IE:X00S F. Schroeder, NRR g ument Mgt. Br. 3 D. F. Ross, NRR LANDOW BLDG (Fax *by HQ)

S. Ebbin, asuu O. Eisenhut, NRR (6 MIN /PAGE)

J. Tourtellotte S. H. Hanauer, NRR J. J. Cumings, OIA Asst. Chief Hearing B. J. Snyder, NRR Counsel, OELD PRELIMINARY NOTIFICATION l

I l

l u -