Atalama Power Company 600 North 18th street Post Office Box 2641 Birmingham. Alabama 35291 Tetaphone 205 250-1000 m
F. L CLAYTON, JR.
senior Vice President Alabama Power the soutMm eretnc sy; tem March 20, 1981 cI 9, Docket No. 50-348
.c@
i-(
2 Mr. D. G. Eisenhut
- P
'j~
Director, Division of Licensing
'/
U. S. Nuclear Regulatory Commission
!!ashington, D. C.
20555 JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 1 SNUBBER TECHNICAL SPECIFICATIONS
Dear Mr. Eisenhut:
Your letter dated November 20, 1980 to All Power Reactor Licensees requested that a license amendment application be submitted within 120 days regarding Technical Specification Revisions for Snubber Surveillance.
Alabama Power Company requests an extension of the 120-day time period because numerous changes to Table 3.7-4 have been identified as a result of the I. E.Bulletin 79-14 effort. This work was just completed during the outage which will be terminated the week of March 15-21, 1981.
Alabama Power Company requests this extension so that a complete and accurate version of Table 3.7-4 may be submitted. The proposed snubber Technical Specification amendment will be submitted as a part of the Technical Specification revision needed to upgrade the Unit 1 specification to be compatible with the Unit 2 specification which is scheduled to be filed within the next month.
If you have any questions, please advise.
Yours very t ly, J
V
- h. L. Clayton, Jr.
FLCJr/WGW:wm n
l-fo Ol cc: Mr. R. A. Thomas y
Mr. G. F. Trowbridge Mr. E. A. Reeves Mr. W. H. Bradford
/
0 8103240483 J