.1 CONNECTICUT YANKEE ATOMIC POWER COMPANY
)
HADDAM NECK PLANT RR = 1, BOX 127E EAST H AMPTON, CONN. 06424 June 14,1973 CYH-2399 Regulatory File CF
.g U. S. Atomic Energy Comission
/ 'l ' ~
s
/
N',h Washington, D. C. 20545
/~
^
- lp<6,' '., ' }f)
- Q d
/'7 ATTENTION: Director, Directorate of Licensing
/d g _.y lH Eg, 4.,}
REFERENCE:
Provisional License No. DPR-14 l
Docket No. 50-213 y ', -'..., -
,x k'.)
M
Dear Sir:
QM We have re-evaluated the information reported by telephone on 6/4/73 to the Directorate of Regulatory Operations, concerning the inadvertent delay in performing a surveillance test and we hereby withdraw the report from consideration as an Abnormal Occurrence.
Our decision is bc ed upon a review of plant conditions when the pump was removed from service (full power) as compared to conditions during the second 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> surveillance interval (plant shutdown, sub-critical, plant cool down in progress).
The requirement for testing the High Pressure Safety Injection Pump no longer existed with the plant shutdown.
Very truly yours,