ML19343C343

From kanterella
Jump to navigation Jump to search
Withdraws 730604 Telcon Info Re Inadvertent Delay in Surveillance Test Performace from Consideration as Ao. Requirement for Hpis Pump Testing No Longer Exists W/Plant Shutdown
ML19343C343
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/14/1973
From: Hartley F
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
CYH-2399, NUDOCS 8103100438
Download: ML19343C343 (1)


Text

'

i

.1 CONNECTICUT YANKEE ATOMIC POWER COMPANY

)

HADDAM NECK PLANT RR = 1, BOX 127E EAST H AMPTON, CONN. 06424 June 14,1973 CYH-2399 Regulatory File CF

.g U. S. Atomic Energy Comission

/ 'l ' ~

s

/

N',h Washington, D. C. 20545

/~

^

  1. lp<6,' '., ' }f)
Q d

/'7 ATTENTION: Director, Directorate of Licensing

/d g _.y lH Eg, 4.,}

REFERENCE:

Provisional License No. DPR-14 l

Docket No. 50-213 y ', -'..., -

,x k'.)

M

Dear Sir:

QM We have re-evaluated the information reported by telephone on 6/4/73 to the Directorate of Regulatory Operations, concerning the inadvertent delay in performing a surveillance test and we hereby withdraw the report from consideration as an Abnormal Occurrence.

Our decision is bc ed upon a review of plant conditions when the pump was removed from service (full power) as compared to conditions during the second 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> surveillance interval (plant shutdown, sub-critical, plant cool down in progress).

The requirement for testing the High Pressure Safety Injection Pump no longer existed with the plant shutdown.

Very truly yours,

,P

^

w-cd F. W. Hartley Plant Superintendent RHG/bn cc: DR0 b;b i,-

twin USidG

'3 a.

JUN 181973M r nef3 TORY Nl 6

yxt. stcr.m NOFIT CLIM Q

3 Tb y

5/b 3/064.3?