Monthly Operating Rept for Jan 1981
ML19343C008
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/01/1981
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML19343C004 List:
References
NUDOCS 8102180490
Download: ML19343C008 (5)


Text

L

, s ?ON*VLY OPERATP:C P:FOR"ATION DISTRI31* TON

('- l' Number of f] pies Director------------------------------------- 0 (Original of ? Letter)

Of fice of Inspection and Enforce ent (

. 5. Nucle a r Re gula to ry Co mi sion Wasnington. 3.C. 20555 Karl V 5eyfrit. Director ---------------------------- 1 (P Letter; Ea;1on I.

Of fice of Inspection and Enforcement Nuclear Regulatorv Co mission 611 Ryan Plaza Orive Suite 1000 Arlington. Texas 76012 Director - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter)

Of fice of Management !ntormation and Prcgram Control U. 5. Nuclear Regulatorv Commission Washington. 3. C. 20555 Tea Cintula ----------------------------------- 1 (P Letter)

. 5. Nuclear Ee;ulatory Commission 121 5 National ".arfland Bank Su11 ding Vasnin g to n. 3.C. :0553 Mr. Richard ? helps --- ---------------------------- 1 (P Letter)

FSV. IA. Site Rep rese nt ative M eral Atomic Company

?. '

3o:: 426

?latte rille, Colorado 30651 NRC Resident Site Inspector --------------------------- 1 (P Letter)

Senior Vice President. Room 770 ------------------------- 1 ;P Letter)

Vice President, Electrical Engineering and Planning. 39*h Avenue - - - - - - - - - 1 MP Letter)

"ic: 'r2sident. P r:duttien Oi-is ion. 3elle"te" - - - - - - - - - - - - - - - - - 1 (? *.et te r)

?uality Assurance Manager ---------------------------- 1 (P Letter)

S i t e En ginee ring Coo rdina to r - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Lettee)

N uclea r P ro j ec t Mana ge r Mon tb ello - - - - - - - - - - - - - - - - - - - - - - - - 1 (? Letter)

Cary Reeves. Public Relations. Room 950 --------------------- 1 (Original of "emo)

Bill 5hinkle. ?roperty Accounting. Holly Se: rice Center ------------- 1 (Original of Memo)

Supe rvisor. Licensing and Administrative Services.

Nuclear Project Oepartment. Monthallo -e------, ---------- 1 (P Letter)

Supervisor Project Engineering. Nuclear Projec* Department, "ont5ello - - - - - - 1 (P Letter)

Cocu ents Centrol *echnician. MontSello --------------- ----- 2 (2 P Letters)

Corresponcence Ccordinator. Nuclear Project Department. Montballo -------- 1 (P Letter)

Suc le a r P r:d uc ticn Mana ger - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (? Letter)

Cperations Manager - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Ad=inisertrive Services Manager ---------------,--------- 1 (P Letter)

PORC Cce=1ttee - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

FS V NTS C S e c r e t a ry - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

P Files ------------------------------------- 1 (P Letter)

Record Storage - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter)

Tecnnical Services Review ---------------------------- 1 (P Letter)

  • echnical Se rvices Supe rvisor -------------------------- 1 (P Letter)

G re y 3o c k No t e b oos - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Monthly ?perations Foldar ---------------------------- 1 "onthly Operating Information Folder - - - - - - ----------------- 1 (P Letterl Monthly Ope rat ing Informa tion File - - - - - - - - - - - - - - - - - - - - - - - - 0 (original of Report and 1 Copy of P Letter)

Gas cooled Reactor Associates --==---------------==----- 1 (P Letter)

Attention: Mr. Dan Yueh 3344 North Torrey Pines Court Suite 300 La

  • olla. California 92017 Electric Pever Research Institute - ---------------------- 1 (? Letter)

Attention: Mr. Melvin T. Lapides 3412 Killview Avenue P. O. Box 10412 Palo Alto. California 94303 l

M0218 k O

. - i certATINc OATA RrPORT ocCxt; No. 50-267 .

An 810201 I l

COMPL..!ED ST J. W. Cahm

.z?HcNE (303) 783-2224 l t

CPERATINC STATUS sons (,

1. Unic Name: Fort St. Vrain 7
2. Reporting Period: 810101 throuzh 810131  !
3. Licensed thermal Power (Wt): 842 t
4. Nameplate Racing (.Oross We): 342 5 Oasisn Electrical Rating (set We): 330 l
6. Maximum Oependable Capacity (cross We): 342
7. Maximum Oependable Capacity (Net We): 330 , j
8. If Changes occur in Capacity Ratings ( tems Number 3 Through 7) Since Last Report, Give Reasons:

None 1

4

9. Power Level To Which Restricted, If Any Ciet We): 231  ;
10. Reasons for Restrictions, If Any: Nuclear Rgkulatorv Coviission restrict h 70i non h o  !

resolution of temperature fluctuations.

This Month Tear to Date C a lative  ?

11. Hours in Reporting Period 744 744 13.945
12. Number of Hours Reactor Was Critical 518.2 518.2 9.653.4 ,
13. Reactor Raserve Shutdovo Hours 0.0 0.0 0.0 r
14. aours cenerator on-Line 393.5 393.5 6,086.8
13. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. cross Ther=al Energy cenerated (Wa) 179.038.8 179.038.8 2,887,131.6
17. cross Electrical Energy cenerated ($n) 63.566 63.566 935,360 .

f

15. Net slectrical Energy cenerated (Wu) 57.418 57.418 856,719
11. nic Service Tactor 52.9% 52.9% 43.6%

P

20. Cnic Availability Tactor 52.9% $2.9% 43.6%
21. Unit Capacity Tactor (Using MDC Net) 23.4% 23.4% 18.6%
. Unit Capacity Factor (Using OE1 Net) 23.4% 23.4% 18.6%
23. Unit Terced outage Race 47.1% 47.15 38.1% ,
24. 3hutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Zach): Refueling - Acril 3 for i approximately 8 weeks.
23. !! Shut Down at Zad of Report Period. Esti=ated Oate of Startup N/A
25. Units In Test Status (Prior to Comercial Operation): Forecast Achieved I:rt;:AL CRI n CAI.I n N/A N/A IN:T:A:. c.EC RICm N/A N/A CO:stERCIAL CPE3AT:03 N/A N/A re w a mu - ----- -

D E

. m AVERAGE DAILY UNIT PC'4ER LE'EL Docket No. 50-267 Unit Fort St. Vrain Date 810201 Completed By J. W. Gahm Telephone (303) 785-2224 Month Januarv, 1981 DAY AVERAGE DAILY POWER LE'EL DAY AVERAGE DAILY PC'4ER LEVEL (We-Ne t) (We-Net) 1 0.0 17 139.1 2 0,0 18 124.6 3 0.0 19 160.8 4 0.0 20 157.3 5 0.0 21 129.3 6 0.0 22 158.4 -

7 0.0 23 90.1 3 0.0 24 80.4 9 0.0 25 148.1 10 0.0 26 158.0 11 0.0 27 160.3 12 0.0 28 191.7 13 0.0 29 201.6 14 0.0 30 202.1 15 102.0 31 1ca.s 16 121.o

  • Generator on line but no net generation.
  • . E d C e f e f N

E n o e o R i f R b . l l U

C

. r s e r e E 2 ue v i v P 0 t v e a p

e 2 l l l n 4 T N 7 ra e i 2 F - i v i r h a 2 V E

V a lg g r 2 R pt i . o i .

V m - P rep h s t h s h 5 i re t t O a

. a 8 T c on e on t C 7 N

por t a n t a 7 S 1 O et e d i d 6 0 . ) I r t ei l ei 2 t r

2 0

W 3 0

T C oei d n ux d o f ux A d o 0 o 1 . 3 t u f 5 F 8 J ( E nd nt o nt V nin on on n

I T wt a i a i a E

C on tl e tl i.

E t

E T

Y B N E

R d op co k . co mW A D ) o n

R O

t co u

uo ak uo I

H r C t d c t a d c T h ns e e e E

T I

N T

E.

E.

l. D N

swot ry r

el n

ry r

x U t t n a' i A td a ra ir ra I

c m E S

nt e em b e em U auh wi rt wi A l h e or ua or a C PS r P p Tw P p T

N X X E

N E E O V N 0' E L A I A 4 D A / A /

L U V V CG N N H

E TE

' SD l l B i l B

~

Y)

Su i

l C l I C

^

S~

N D

1 1 C~ 8 0

1 9 E~-

R l 0 0 t

s g L L E-U r 3 3

M-I. a n

0 0 l t i- n 9 9 N

A_ a 0 0

l. f 0 0 S

N ,-

R A - A -

H / 1 / 1 n T F N 8 N 8 M_

i EL l

U H F T_

H S T OG N R T. t P

DI OT O

T A A A 2 / / /

I-N I

I E

k iTNC l

l EikUMA l

E N N N HSiN .

n N o O l.

S A 1 1 A 1 1 t A

E a R r e

p o

N 8 0 7 0 O t IT 6 0 3 0 n A 3 1 a

  • 3 l H

I p

. e u

E P

F F F F n i

Y T t n

1 3 1 o 3 0 2 3 C E 2 2 1 1 T

A 1 1 0 0 D 0 O 1 1  :

B i t B 3 Y R

2 1 2 3 A 3 0 0 0 M O - - - - M N 0 1 1 1 U 3 3 3 3 S f ,

4  ;! < ' ;j ' = ]i < ! , 1 l

{

. . . . . . ._ . ..- . - . - _ . . - . . -. -- - \

  • l

. 1 REFUELING INFORMATION

1. Name of Facilitv. Fort St. Ursin- l'ni t No. 1
2. Scheduled date for next refueling shutdown. Aoril 3, 1981
3. Scheduled date for restart following refueling. June 3. 1981
4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendment? No If answer is yes, what, in general, will these be?

1 If answer is no, has the reload Yes fuel design and core configura-tion been reviewed by your Plant Safety Review Co=mittee to deter-mine whether any unreviewed safety questions are associated t with the core reload (Reference .

10CFR Section 50.39)?

If no such review has taken - ==

elace, when is it scheduled?

5. Scheduled date(s) for subnitting - - - - - - - -

proposed licensing action and suoportinc information.

6. Important licensing considera-tions associated with refueling, e.g., new or different fuel de-sign or supplier, unreviewed design or performance analysis methods, significant changes in fual design, new operating pro-cedures.
7. The number of fuel asse=blies a) 1482 HTGR fuel elements.

(a) in the core and (b) in the scent fuel storage cool. 5) 10 2nene uTc7 s,. t ot,-oor,.

S. The present licensed spent fuel Capacity is limited in size to about one-pool storage capacity and the third of core (approximately 500 HTGR ele-size of any increase in licensed cents). No change is planned.

storage capacity that has been requested or is planned, in number of fuel asse=blies.

1 REFLT ING INFORMATION (CONTINUED)

9. The projected date of the 1986 under the Three Party Agreement (Con-last refueling that can be tract AT (04-3)-633) between DOE, Public discharged to the spent fuel Service Company of Colorado (PSCo), and pool assuming the present General Atomic Company.*

licensed capaciev.

  • The 1986 date is based on the understanding that spent fuel discharged during the term of the Three Party Agree =ent will be shipped to the Idaho National Engineering Laboratory for storage by DOE at the Idaho Chemical Processing Plant (ICPP). The storage capacity has evidently been sized to acco=odate fuel which is expected to be discharged during the eight year period covered by the Three Party Agreement.