ML19343C008

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1981
ML19343C008
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/01/1981
From: Gahm J
PUBLIC SERVICE CO. OF COLORADO
To:
Shared Package
ML19343C004 List:
References
NUDOCS 8102180490
Download: ML19343C008 (5)


Text

L

?ON*VLY OPERATP:C P:FOR"ATION DISTRI31* TON s

( l Number of f] pies Director-------------------------------------

0 (Original of ? Letter)

Of fice of Inspection and Enforce ent

(

5. Nucle a r Re gula to ry Co mi sion Wasnington. 3.C.

20555 1

(P Letter; Karl V 5eyfrit. Director Ea;1on I.

Of fice of Inspection and Enforcement Nuclear Regulatorv Co mission 611 Ryan Plaza Orive Suite 1000 Arlington. Texas 76012 Director - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter)

Of fice of Management !ntormation and Prcgram Control U. 5. Nuclear Regulatorv Commission Washington. 3. C.

20555 1

(P Letter)

Tea Cintula

5. Nuclear Ee;ulatory Commission 121 5 National ".arfland Bank Su11 ding Vasnin g to n. 3.C.
0553 Mr. Richard ? helps --- ---------------------------- 1 (P Letter)

FSV. IA. Site Rep rese nt ative M eral Atomic Company

?.

3o:: 426

?latte rille, Colorado 30651 NRC Resident Site Inspector


1 (P Letter) 1

P Letter)

Senior Vice President. Room 770 Vice President, Electrical Engineering and Planning. 39*h Avenue - - - - - - - - - 1 MP Letter)

"ic: 'r2sident. P r:duttien Oi-is ion. 3elle"te" - - - -

- - - - - - - - - - - - - 1

(? *.et te r) 1 (P Letter)

?uality Assurance Manager S i t e En ginee ring Coo rdina to r - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Lettee)

N uclea r P ro j ec t Mana ge r Mon tb ello - - - - - - - - - - - - - - - - - - - - - - - - 1

(? Letter) 1 (Original of "emo)

Cary Reeves. Public Relations. Room 950 Bill 5hinkle. ?roperty Accounting. Holly Se: rice Center 1

(Original of Memo)

Supe rvisor. Licensing and Administrative Services.

-e------,


1 (P Letter)

Nuclear Project Oepartment. Monthallo Supervisor Project Engineering. Nuclear Projec* Department, "ont5ello - - - - - - 1 (P Letter) 2 (2 P Letters)

Cocu ents Centrol *echnician. MontSello 1

(P Letter)

Corresponcence Ccordinator. Nuclear Project Department. Montballo Suc le a r P r:d uc ticn Mana ger - - - - - - - - - - - - - - - - - - - - - - - - - - 1

(? Letter)

Cperations Manager - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)


,--------- 1 (P Letter)

Ad=inisertrive Services Manager PORC Cce=1ttee - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

FS V NTS C S e c r e t a ry - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter) 1 (P Letter)

P Files Record Storage - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter) 1 (P Letter)

Tecnnical Services Review 1

(P Letter)

  • echnical Se rvices Supe rvisor G re y 3o c k No t e b oos - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 1

Monthly ?perations Foldar 1

(P Letterl "onthly Operating Information Folder - - - - - - -----------------

Monthly Ope rat ing Informa tion File - - - - - - - - - - - - - - - - - - - - - - - - 0 (original of Report and 1 Copy of P Letter) 1 (P Letter)

Gas cooled Reactor Associates

--==---------------==-----

Attention:

Mr. Dan Yueh 3344 North Torrey Pines Court Suite 300 La

(? Letter)

Electric Pever Research Institute Attention:

Mr. Melvin T. Lapides 3412 Killview Avenue P. O. Box 10412 Palo Alto. California 94303 M0218 k O l

i certATINc OATA RrPORT ocCxt; No.

50-267 I

An 810201 l

COMPL..!ED ST J. W.

Cahm

.z?HcNE (303) 783-2224 l

t CPERATINC STATUS sons

(

1.

Unic Name:

Fort St. Vrain 7

2.

Reporting Period:

810101 throuzh 810131 3.

Licensed thermal Power (Wt):

842 t

4.

Nameplate Racing (.Oross We):

342 5 Oasisn Electrical Rating (set We):

330 l

6.

Maximum Oependable Capacity (cross We):

342 7.

Maximum Oependable Capacity (Net We):

330 j

8.

If Changes occur in Capacity Ratings ( tems Number 3 Through 7) Since Last Report, Give Reasons:

None 1

4 9.

Power Level To Which Restricted, If Any Ciet We):

231 10.

Reasons for Restrictions, If Any: Nuclear Rgkulatorv Coviission restrict h 70i non h o resolution of temperature fluctuations.

This Month Tear to Date C a lative

?

11. Hours in Reporting Period 744 744 13.945
12. Number of Hours Reactor Was Critical 518.2 518.2 9.653.4
13. Reactor Raserve Shutdovo Hours 0.0 0.0 0.0 r

14.

aours cenerator on-Line 393.5 393.5 6,086.8

13. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. cross Ther=al Energy cenerated (Wa) 179.038.8 179.038.8 2,887,131.6
17. cross Electrical Energy cenerated ($n) 63.566 63.566 935,360 f
15. Net slectrical Energy cenerated (Wu) 57.418 57.418 856,719 11.

nic Service Tactor 52.9%

52.9%

43.6%

P

20. Cnic Availability Tactor 52.9%

$2.9%

43.6%

21.

Unit Capacity Tactor (Using MDC Net) 23.4%

23.4%

18.6%

. Unit Capacity Factor (Using OE1 Net) 23.4%

23.4%

18.6%

23.

Unit Terced outage Race 47.1%

47.15 38.1%

24.

3hutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Zach): Refueling - Acril 3 for i

approximately 8 weeks.

23. !! Shut Down at Zad of Report Period. Esti=ated Oate of Startup N/A
25. Units In Test Status (Prior to Comercial Operation):

Forecast Achieved I:rt;:AL CRI n CAI.I n N/A N/A N/A N/A IN:T:A:. c.EC RICm CO:stERCIAL CPE3AT:03 N/A N/A a

m D

re w u

E

m AVERAGE DAILY UNIT PC'4ER LE'EL Docket No.

50-267 Unit Fort St. Vrain Date 810201 Completed By J. W.

Gahm Telephone (303) 785-2224 Month Januarv, 1981 DAY AVERAGE DAILY POWER LE'EL DAY AVERAGE DAILY PC'4ER LEVEL (We-Ne t)

(We-Net) 1 0.0 17 139.1 2

0,0 18 124.6 3

0.0 19 160.8 4

0.0 20 157.3 5

0.0 21 129.3 6

0.0 22 158.4 -

7 0.0 23 90.1 3

0.0 24 80.4 9

0.0 25 148.1 10 0.0 26 158.0 11 0.0 27 160.3 12 0.0 28 191.7 13 0.0 29 201.6 14 0.0 30 202.1 15 102.0 31 1ca.s 16 121.o

  • Generator on line but no net generation.

d E

C e

f e

f N

n o

e o

E i

f R

R b

l l

U

. r s e

r e

C 2 ue v

i v

E P

0 t v e

a e

2 l

l p

l T

n 4

7 ra i

r h

e N

i 2

F

- i v lg g

a 2

V V a E

r 2

pt i.

o i.

R V

m P

rep h s t

h s h

5 i re t

t a

8 OT a

c on e

on t

C 7

por t a n

t a 1

N et e d

i d

7 S

O 6

0

)

r t

ei l

ei I

2 t

2 W

3 T

d n ux ux r

0 0

C oei d o f

d o 0

o 1

3 A

t u f

5 F

8 J

(

E nd nt o

nt V

nin on on I

T wt a i a n

i a C

on tl e

tl i.

E E

Y E

E d op co k

co t

T B

N R

m W A

o R

t co uo ak uo T

I D

)

n O

u t

d c t a d c H

r C

h ns e

e e

T T

E.

E I

E.

l.

D sw ry el ry N

t t

N ot r

n r

x U

a' i

A td a ra ir ra n

m E

nt e em b e em I

c S

auh wi rt wi U

l h e or ua or A

a C

PS r P p Tw P p TN X

X E

N E

E O

V N

0' E L

A A

I 4 DU A

/

A

/

LCG V

N V

N H

ETE l

i Y) i B

l B

SD l

l S~

Su l

C I

C

~

N

^

D C~

1 1

8 0

9 E~-

1 l

0 0

R t

E-g s

L L

U r

3 3

M-I.

a 0

0 i-n l

t N

n 9

9 A_

a 0

0 l.

0 0

S,-

f N

A A

H R

/

1

/

1 M_

T F

i E

l N

8 N

8 n

T_

L U

H H

F S

T OG T.

N R

DI O

A A

A t

I-P OT T

N E

iTNC 2

/

/

/

l UMA N

N N

I k

l I

Eik E l

HSiN no N

S A

A 1

l.

O 1

t 1

1 A

a E

r R

ep o

8 0

7 0

N O

t IT 6

0 3

0 n

A 3

1 a

3 l

H I

p e

u E

F F

F F

n P

i YT tn 1

3 1

o 3

0 2

3 C

E 2

2 1

1 TA 1

1 0

0 D

0 O

1 1

B t

B 3

Y i

R 2

1 2

3 A

3 0

0 0

M O

M N

0 1

1 1

U 3

3 3

3 S

4

j

=

]i 1

l f

{

\\

1 REFUELING INFORMATION 1.

Name of Facilitv.

Fort St. Ursin-l'ni t No. 1 2.

Scheduled date for next refueling shutdown.

Aoril 3, 1981 3.

Scheduled date for restart following refueling.

June 3. 1981 4.

Will refueling or resu=ption of operation thereafter require a technical specification change or other license amendment?

No If answer is yes, what, in general, will these be?

1 If answer is no, has the reload Yes fuel design and core configura-tion been reviewed by your Plant Safety Review Co=mittee to deter-mine whether any unreviewed safety questions are associated t

with the core reload (Reference 10CFR Section 50.39)?

If no such review has taken

-==

elace, when is it scheduled?

5.

Scheduled date(s) for subnitting proposed licensing action and suoportinc information.

6.

Important licensing considera-tions associated with refueling, e.g., new or different fuel de-sign or supplier, unreviewed design or performance analysis methods, significant changes in fual design, new operating pro-cedures.

7.

The number of fuel asse=blies a) 1482 HTGR fuel elements.

(a) in the core and (b) in the scent fuel storage cool.

5) 10 2nene uTc7 s,.

t ot,-oor,.

S.

The present licensed spent fuel Capacity is limited in size to about one-pool storage capacity and the third of core (approximately 500 HTGR ele-size of any increase in licensed cents). No change is planned.

storage capacity that has been requested or is planned, in number of fuel asse=blies.

1 REFLT ING INFORMATION (CONTINUED) 9.

The projected date of the 1986 under the Three Party Agreement (Con-last refueling that can be tract AT (04-3)-633) between DOE, Public discharged to the spent fuel Service Company of Colorado (PSCo), and pool assuming the present General Atomic Company.*

licensed capaciev.

  • The 1986 date is based on the understanding that spent fuel discharged during the term of the Three Party Agree =ent will be shipped to the Idaho National Engineering Laboratory for storage by DOE at the Idaho Chemical Processing Plant (ICPP). The storage capacity has evidently been sized to acco=odate fuel which is expected to be discharged during the eight year period covered by the Three Party Agreement.

I l

l l

l l

t 1

i