ML19343B676
| ML19343B676 | |
| Person / Time | |
|---|---|
| Site: | Wood River Junction |
| Issue date: | 10/15/1980 |
| From: | Bissett P, Holody D, Joyner J, Roxanne Summers, Zibulsky H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19343B674 | List: |
| References | |
| 70-0820-80-17, 70-820-80-17, NUDOCS 8012300039 | |
| Download: ML19343B676 (1) | |
Text
.
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.
70-820/80-17 Docket No.70-820 License No. SNM-777 Safeguards Group 1
Licensee:
United Nuclear Corporation UNC Recovery Systems Wood River Junction, Rhode Island 02894 Facility Name:
UNC Recovery Systems Inspection At:
Wood River Junction, Rhode Island Inspection Conducted:
September 8-12 and 22-26, 1980 Date of Last Material Control and Accounting Inspection:
August 15, 1980 Type of Inspection:
Material Control and Accounting Inspectors:
- b. -v-v d ir, / -kG R. Summers, Safeguards As11 tor date signed h.
Ye&$
lC' fly O
9 0.
lody, Safeguards Statistician date signed t bhW io Who
/
P'. Siss'ett, Safeguards Auditor dat(signed M 9Mdy
/s -/F 1!ro H. Zibuh?ky, afeguards Chemist date signed Approved by:
hh W
/o//S/go
. H. Joyner(J hief, Nuclear Material Control d6te / signed Support Section, Safeguards 8 ranch Inspection Summary:
Areas Inspected:
Measurement of SNM in waste discards and observation of licensee decommissioning activities.
The inspection involved 148 hours0.00171 days <br />0.0411 hours <br />2.44709e-4 weeks <br />5.6314e-5 months <br /> onsite by four NRC inspectors and was begun during the regular hours, Results:
The licensee was found to be in compliance with NRC requirements within the area inspected.
F 0 7 2 3 00039 m,
e
-ee
-,,w e
o q
-n n