ML19343B189

From kanterella
Jump to navigation Jump to search
Forwards LER 80-154/03L-0
Date released: 12/23/2019 Download: ML19343B189


LER 80-154/03L-0:on 801106,during Cold Shutdown,Tests of Primary Feedwater Isolation Valves 2B21-FO10A & 2B21-FO77A Revealed That Total Leakages Exceeded Tech Spec Limits. Caused by Scratches on Valve Seat.Valve Seat Polished
ML19343B192
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/05/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19343B192 (2)
Forwards LER 80-154/03L-0
ML19343B188
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 12/05/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19343B188 (1)