LICENSEE EVENT REPORT C
CONTROL BLOCX:(
lEEl l
l l
l (PE.ASE PRINT ALL RECUlRED INFORMATI!N) 1 8
i
' TAS"
~
TM'
'7Yg7 tcENst NuuBER 01 lMl Al Yl Kl Rl1]
l 0 l 0 l-l0 l 0 l 0l 0l 0l-l0 l.0l l4 l 1 l 1 l 1l 1l l0 l1l 7 89 14 15 25 26 30 31 32 CATEGORY TY P SO DOCKET NUMBER EVENT DATE REPORT DATE 01 CON T l M l 1 l lLl l Ll l 0 l 5'l 0l-l 0l 0l 2 l 9l l 0 l 2 l 1l 1l 7l 5l l0 l 3l0l 5l7 l 5l 7 8 57 SS 59 60 01 68 69 74 75 80
{
EVENT DESCR:PTION l
@l Monthly coerational check Of the twO SI Initiation air pressure switches was missed l 7 89 80
@l for the month of January 1975.
This is a violation of Technical Specification, l
i 7 89 80
@l Annandiv A. Section 0.2.i.
(A0 75-2) l-l 7 89 80 i
@l l
7 89 CO l
36 l l
E C CE COMPONENT COCE A
N TON 07 lIl Bl [A_j lIl N l Si TlR l Ul
[L_j lS l3 l8 l2 l W
7 89 10 11 12 17 43 44 47 48 CAUSE DESCR:PTION O9 l (Attarb-ant) 7 89 80 Os l l
7 89 80 1O l l
I' sTA s
% POWER OTHER STATUS SCOVERY OtSCOVERY DESCR;PTON
[Ej l1l0l0]
l NA l
ldl l
NA l
11 7 8 9
10 12 13 44 45 46 80' AMOUNT OF ACTMTV LOCATON OF RELEASE
[zj
[?jESEl RELE SED CF NA l
l NA l
12 7 8 9
10 11 44 45 80 PERSONNEL EXPOSURES NUVSER TYPE CESCRiPTON 13 10 i O l 01
[Z_j l
NA l
-7 89 11 12 13 80 j
PERSONNEL INJUR:ES
}
NUVBER C ESC A.PTON l0 I 0l Ol l
NA l
[
14 7 89 11 12 80 OFFSITE CONSECUENCES mn l NA l
7 89 80 LOS3 OR OAMAGE TO FACILITY TYPE DESCR PT:CN
[Zj l
NA l
1s 7 89 10 80 PUBLICITY 17 l NA l
7 89 80 ADDITIONAL FACTOAS 3-l NA l
7 69 80 19 l l
80 7 09 N.N. St.Laurent 1-413-625-6140-NAME:
pgang
.,7
(;
(;
i CAUSE DESCRIPTION Change No.115 to the Technical Specifications was issued on 11/27/74.
It requires that a monthly operational check be made of the SI Initiation air pressure switches.
Plant personnel assumed that the checks need not be made until administrative procedure, AP-0220, detailing all Technical Specifi' cations required sur-veillance checks along with their implementing procedures, were revised.
AP-0220 was expeditiously revised but its approval and subsequent issuance did not occur until approximately one month had elapsed.
The check for the month of January 1975 was thus missed.
Plant supervisory personnel have been informed that license requirements become effective when issued by the NRC..and.no.t when administrative controls are issued.
/
i e
0 5
1 e
4 e
.