ML19343A889

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-02.Util Intends to Upgrade Addl Concrete Expansion Anchor Bolts within Existing Safety Factors
ML19343A889
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/03/1980
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-02, IEB-79-2, NUDOCS 8011240114
Download: ML19343A889 (1)


Text

-.. -. - -, -..

. _ ~ ~...

. ~ ~ ~.

Alabama Poww Company g

600 Nortn 18th Street i

Post Offke Bom 2641 Birminghs n. Alabama 3$291 Tesegnone 20S 250-1000 F. t CLAYTON, JR.

$f3bO$d,hDWCT Senior Vice President

- b *. k

[ ' '

[

the sotshem q system ca November 3,1980 2

shb 3

j Docket No. 50-348

=

j p,

3

.x

.P A

Mr. J. P. O'Reilly U. S. Nuclear Regulatory Coninission Region II, Suite 3100 101 Marietta-Street, N.W.

Atlanta, Georgia 30303

Dear Mr. O'Reilly:

I.E. BULLETIN 79-02 FARLEY' NUCLEAR PLANT UNIT 1 Alabama Power intends to upgrade additional concrete expansion anchor bolts within the scope of the Farley Unit 179-02 program from their existing safety: factors (greater than 2.65:1) to safety factors greater than or equal to 4:1 (for wedge type) or 5:1 (for shell type).

This upgrading will be performed during the upcoming refueling outage.

Following this upgrading, there will be fewer than 5% of the concrete expansion anchor bolts with safety factors less than the bulletin requirements on any system within the scope of the program. Alabama Power Company believes these actions will be sufficient to bring Farley Unit 1 into full compliance with the bullettre requirements.

y x

Very truly yours,

' :w! r.

t k

Dw F.L.Clayton,(r.

i..

CLB:de C.

,v, cc: Mr. R. A.. Thomas

~

Mr. G. F. Trowbridge Mr. E. A. Reeves Mr. W. H. Bradford Office of I & E Division of Reactor Operations Inspection Washington, D. C.

Mr. M. D. Hunt I & E, Region II Sox,onolly D

L ee e.

m g

.