ML19343A834
Jump to navigation
Jump to search
| ML19343A834 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/07/1980 |
| From: | George R ALABAMA POWER CO. |
| To: | Kintner L Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19343A835 | List: |
| References | |
| NUDOCS 8011210585 | |
| Download: ML19343A834 (1) | |
Text
_a Alabant] Power Company 600 North 18th Strec4 Post C#ce Box 264i B,rmingham. Alatama 35291 Tsecoone 205 323 5341 Alabama Power the Southem e+ecinC System b
M November 7, 1980 d::h 5
Mr. L. L. Kintner i-U. S. Nuclear Regulatory Commission M@,3 Phillips Building, Room 116 i
7920 Norfolk Avenue
[
d@
Bethesda, Maryland 20014 3
9 o
uv M
Der" Mr. Kintner:
Enclosed is a sumary of the Hittman Demineralization System to be installed in Farley Units 1 and 2 by January 1,1981. This will be the basis of our revised Process Control Program, which will be submitted to you prior to December 1, 1980.
Yours truly, R.L.G$orge RLG:rt Enclosure cc: Mr. C. D. Nesbitt Mr. J. G. Sims QPs'\\
i
(
Bonno gs5