Alabama Power Company 600 Nortn 18tn Street Post Office Box 2641 Birmmgnam. Alabama 35291 Telephone 205 250-1000 m
F. L CLAYTON. JR.
Senior Vice President Alabama Power the southem erectrc system November 4,1980 Docket No. 50-364 Director of Reactor Regulation U. S. Nuclear Regulatory Commission Phillips Building, Room 110 7920 Norfolk Avenue Washington, D. C.
20555 Attention: Mr. Robert L. Tedesco JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 REQUEST FOR ADDITIONAL INFORMATION
Dear Mr. Tedesco:
Enclosed is the additional information concerning the Farley Nut; ear Plant Q-List which was requested in telephone conversations of October 24, 1980, between Southern Company Services and members of the NRC staff.
If you nave any questions concerning this information, please advise.
Yours very truly,
- 7 \\b ff F.D Ciayton', Jr b
RWS:rt Enclosure cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner Mr. W. H. Bradford Mr. W. P. Haass fool s
//
,801121OWO p
.. ~
~
i RESPONSE TO VERBAL REQUESTS FOR ADDITIONAL INFORMATION CONCERNING Q-LIST ITEMS 260.1 Question 3:
Clarify that the Containment Emergency Cooling System includes ductwork dampers and supports, and fan motors.
Verbal Question:
Are the fusible links "Q"?
Response
Containment Air Cooler fusible links are "Q".
l Question 4:
Identify that motor operators for Q-listed valves are in the Q-list.
Verbal Question:
Are operators on nonactive Q-valves "Q"?
Response
Motor operators for "Q" listed valves are "Q".
260.2 The following items were not added to the Q-list:
1.
Leak Detection System
- 27. Containment Purge System Fans.
- 28. Containment Purge System Charcoal Absorbers NRC Comment - These items perform safety-related functions at Plant Farley and should be added to the Q-list with a clarifying comment.
Response: Alabama Power Company has added the following items to the Q-list:
1.
Leak Detection System 27.
Containment Purge System 5ans 28.
Containment Purge System Charcoal Absorbers Alabama Power Company will document all repairs and modifications to these systems on a level of quality similar to other Q systems.
Replacement parts will be bought to meet the original specification.