Affidavit Forwarding Schedule for NRC Testimony Which Will Be Filed on 800925 Re Core Cooling & During Sept-Oct 1980 Re Equipment Design & Mods.Certificate of Svc Encl
ML19343A350
Person / Time
Site: Crane 
Issue date: 09/15/1980
From: Novak T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19343A349 List:
References
ISSUANCES-SP, NUDOCS 8009170256
Download: ML19343A350 (5)


Text

E

(_-

s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION EEFORE THE ATOMIC SAFETY AND LICENSIf;C BOARD In the Matter of

)

)

l'ETROPOLITAN EDISON COMPAl;Y, et _al.

)

Docket No. 50-289 (Three Mile Island, Unit 1)

)

AFFIDAVIT OF THOMAS M. NOVAK I, Thomas M. Novak, being duly sworn, do depose and state:

1.

I am the Assistant Director for Operating P,eactors, Division cf Licensing, Cffice of Nuclear Reactor Regulation of the United States Nuclear Regulctory Connission.

I am responsible for the project management of operating reactors, including Three Mile Island, Unit 1.

2.

The attached SchedJle for Filing of Certain Testimony for TMI-l Restart was prepared by me.

I certify that the information therein is true and accurate to the best of my knowledge.

f w

  • Et 4: T v

Thomas M. Novak Subscribed and sworn to before me this 15th day of September, 1980 l.

'L,.

r-Notafiublic

/

My Commission expires: July 1, 1982 8009170 7gg

i l

SCHEDULE FOR FILING CERTAIN TESTIMONY FOR Thl-1 RESTART HEARING Staff testimony in response to the contentions listed below will be filed by the dates indicated, Management review of the draf t responses concluded that additional information was required to complete the responses to the contentions.

In certain cases additional time will be required to coordinate interrelationships between responses prepared oy witnesses of several differer.t areas of technical expertise.

Croup A - Analysis and Modification of Plant Design and Procedures Subgroup 1 - Core Cooling Related Contentions Filing Date Natural and Forced Circulation UCS-1 September 25, 1930 UCS-2 September 25, 1980 Additional LOCA Analysis Board Question (UCS-8)

September 25, 1980 ECNP-1(e)

September 25, 1980 l

ECCS Bypass and Override UCS-10 Sertember 25, 1930 SHOLLY-3 September 25, 1950 f

l Suboroup 2 - Equipment Design l

and hodifications Related Contentions Filing Date l

l Safety Classification Board Question (UCS-12) October 2,1980 UCS-14 October 2,1980 UCS-3 September 25, 1980 l

Valves and Valve Testing UCS-5 September 25, 1980 l

Board Question (UCS-6) October 2,1980 Computer SH0LLY-13 October 2, 1980 j

ECUP-1(a)

October 2,1930 Safety System Status Panel UCS-9 Octobcr 2, 1930 ENCP-1(c)

October 2, 1980 1

Instrument Ranges (in plant)

ENCP-1(d) - remainder October 2,1920

)

Uith re9ard to contentiens related to the subject of Detection of Inadequate Core Cooling (UCS-7, A"3RY-V(B), SHOLLY-6(b)) the staff plans to provide its response by November 30, 1980.

The subject contentions challenge the suffi-ciency of NRC requirements for instrumentation to detect inadequate core ll

e e As part cf its intended response to the contentions, the staff cooling.

be used at TM:-l te cetect t.ill provide its evaluation of the Orccedures to Hos:e ver, i: cr;;r and respond to indications of inadequate core ccoling.

i et.

to complete these procedure revievts the staff must first complete its rev of the E bcock and t.'ilcox precedure guideline f or recognition and mitiga This review is being conducted by the staff's of inadequate core cooling.

We anticipate discussions with the Procedures and Test Review Branch.

We tFen riar, licensee vithin the ner.t two weets to discuss our concerns.

a walk-through of the procedures to be usec te visit the site and perfort Based on these considcrations the revie;..s culd e

in the TMI-l control room.

and testircry filed by hovember 30,19S0.

be corriett d

With regard to cor,tentic".s rclated to Ccr,trcl Rect Design - Human Facter Encineering (SHOLLY-15, ANGRY-V(C)), the staff is conducting a thorou A revieu ten of thc Human human f acters review of the T:' -l certrcl roon.

Factors Engineerings Branch and a human factors engineering consultant f ormed a site visit and review of the TMI-l control recr f rcr July 21 to As part of the review, the desicn review tear is considering July 25,1930.

l the similarities in design and construction between Units 1 and 2 centro

l. visual inspection disclosed that there were more significant room:.

differences than similarities in design and constructicn cf the contrG The bult of the revieu will be concer.trated on assessing the Ur.it rccms.

1 control room te determine whether the design of operatu instrume The revieu will be interf aces could lead to potential operator errer.

completed and testimony prepared by November 30,19ED.

+

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of

)

)

METROPOLITAN EDISON COMPANY,

)

Docket No. 50-289 ET AL.

)

)

(Three itile Island, Unit 1)

)

i CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF REQUEST FOR AN EXTEiiSICN OF TIME TO FILE TESTIMONY," dated September 15, 1980, ir. the above-captioned proceeding, have beer, served on the following, by deposit in the United States mail, first class, or, as indicated by an asterisk through deposit in the Nuclear Regulatory Commission's internal mail systen, this 15th day of September,1953:

  • Ivan W. Smith, Esq.

Mr. Steven C. Snolly Atomic Safety 1 Licensing Board Panel 304 South Market Street U.S. Nuclear 'egulatory Comission Mechanicsburg, Pennsylvania 17055 Washington, D.C.

20555 Mr. Thomas Gerusky Dr. Walter H. Jordan Bureau of Radiation Protection 881 W. Outer Drive Dept. of Environmental Resources Oak Ridge, Tennessee 37830 P.O. Box 2063 Harrisburg, Pennsylvania 17120 Dr. Linda W. Little 5000 Hermitage Drive Mr. flarvin I. Lewis Raleigh, Nortn Carolina 27612 6504 Bradford Terrace Philadelphia, Pennsylvania 19149 George F. Trowbridge, Esq.

Shaw, Pittmen, Potts & Trowbridge Metropolitan Edison Company 1800 M Street, N.W.

ATTN:

J.G. Herbein, Vice President Washington, D.C.

20006 P.O. Box 542 Reading, Pennsylvania 19503 Karin' W. Carter, Esq.

505 Executive House lis. Jane Lee P. O. Box 2357 R.D. 3; Box 3521 Harrisburg, Pennsylvania 17120 Etters, Pennsylvania 17319 Honorable Mark Cohen Walter W. Cohen, Consumer Advocate 512 D-3 Main Capital Building Department of Justice Harrisburg,. Pennsylvania 17120 Strawberry Square,14th Floor Harrisburg, Pennsylvania 17127 D**]O "30 QY o o fd o mu UA 2

i

' Allen R. Carter, Chairnan John Levin, Esq.

Joint Legislative Committee on Energy Pennsylvania Public Utilities Comm.

Post Office Box 142 Box 3265 Suite 513 Harrisburg, Pennsylvania 17120 Senate Gressette Building Columbia, South Carolina 29202 Jordan D. Cunningham, Esq.

Fox, Farr and Cunningham Robert Q. Pollard 2320 North 2nd Street 609 Hontpel.ier Street Harrisburg, Pennsylvania 17110 Baltimore, Maryland 21218 Theodore A. Adler, Esq.

Chauncey kepford WIDOFF REAGER SELK0WITZ & ADLER Judith H. Johnsrud Post Office Box 1547 Environmental Coalition on Nuclear Power Harrisburg, Pennsylvania 17105 433 Orlando Avenue State College, Pennsylvania 16801 fis. Ellyn R. Weiss Harnon & Weiss Ms. Frieda Berrynill, Chairman 1725 I Street, N.N.

Coalition for Nuclear Power Plant Suite 506 Postponement Washington, D.C.

20006 2610 Grendon Drive Wilmington, Delaware 19503 Ms. Marjorie M. Aamodt R.D. p5 Holly S. Keck Coatesville, Penns.ylvania 10.120 Anti-Nuclear Group Representing York 245 W. Pniladelphia Street York, Pennsylvania 17404

\\d

\\-\\

j

%,].

  • Atomic Safety and Licensing Appeal Board ~ %M l

.dgTO Nd'~',-

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 James R. Tourtellotte

  • Atomic Safety and Licensing Board Panel Assistant Chief Hearing Counsel U.S. Nuclear-Regulatory Commission Washington, D.C.

20555

  • Secretary U.S. Nuclear kegulatory Conrission

. ATTN: Chief, Docketing & Service Br.

Washington, D.C.

20555 Karen P. Sheldon, Esq.

c/o Harmon & Weiss 1725 I Street, N.W.

Suite 505 Washington, D.C.

23196 D*"]D

]D h { { h

_to em o MU U

. \\ uh