ML19343A120
| ML19343A120 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/11/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19343A122 | List: |
| References | |
| NUDOCS 8009160268 | |
| Download: ML19343A120 (2) | |
Text
=
A!atama Powtr Comcany 600 Nortn 18th Steset Post Office Boa 2641 0,rmingham. Alabama 35291 Teleonoce 205 250-1000 m
F. L CLAYTON, JR.
Alabama Power Senior Vice President
o yntrem enir: s,ae'"
September 11, 1930 Docket No. 50-348 Director Of fice of >!anagement Inf crmation and Program Control U. S. Nuclear Regulatory Comnission Washington, D.C.
20555
Dear Sir:
RE: Joseph >I.
Farley Nuclear Plant Unit No. 1
- fonthly Operating Data Report At: 1ched are two (2) copies of the August, 1980 monthly ope ating report for Joseph 31. Farley Nuclear Plant, Unit 1, as required bi Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from >!r. John F. Stolz to >!r. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the
)
attached report.
If you have any questions, please advise.
Yours very truly, F.m. 8 ":Aa<y % r\\
^
^ r
,1
\\
}
L
..ayton, s.r.
il FLCJr/JRC:bhj Attachments cc:
'tr. Ted Cintula (1 copy)
D ir ec to r, IE (10 copies) i Director, RII (1 copy) 008 s
/ l 8009160 257
4 JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS 1
I i
AUGUST, 1980
't i
There were four unit shutdowns (one continued from 7/31/80) and five power reductions in the month of August.
i The following safety-related maintenance was performed in August:
1.
Installed vibration monitoring instrumentation on 1B charging pump.
2.
Replaced leaking gasket on the
'B' train air filter for 1B Diesel.
3.
Repaired an air leak on the
'A' train air compressor unloader valve for 1-2A Diesel.
4.
Repacked No. 5 and No. 8 River Water Pumps.
5.
Repacked '1D' Service Water Pump.
l 4
i J
f I