ML19341D612

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 3 to License DPR-22
ML19341D612
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/27/1981
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19341D610 List:
References
NUDOCS 8104080004
Download: ML19341D612 (2)


Text

\\

o

. ~. _ -

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-263 NORTHERN STATES POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U. S. Nuclear Regulatory Comis; ion (the Commission) has issued Amendment No. 3 to Facility Operating License No. DPR-22, issued to Northern States Power Company, which revised Technical Specifications for operation of the Monticello Nuclear Generating Plant (the facility) located in Wright County, Minnesota. The amendment is effective as of its date of issuance.

e-The amendment revises the Technical Specifications to (1) add surveillance requirements for reactor protection system instrumentation (main steam iso-lation and turbine stop valves closure scram signals), (2) add Technical Speci-fications related to degraded grid voltage protection modifications, (3) provide clarification of the status of inoperable secondary containment ventilation dampers, (4) provide miscellaneous corrections and clarifications and (5) incorporate organizational changes of an administrative nature.

~

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.

4 8204080 %

3

(

o i

7590-01

_2 The Conraission has determined that the issuance of this amendment will J-not result in any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal neeo not be prepared in connection with issua.no of

  • imendment.

For further details with respect to this action, see (1) the application for amendment dated May 15,19E0, (2) Amendment No. 3 to License !10. DPR-22, and (3) the Comission's related Safety Evaluation. All of these items are available for public inspection at the Commission's Public Document Room,1717

~

H. Street, fM., Washington, D. C. and at the Environmental Conservation Libra:,,

1 inneapolis Publ'c Library, 303 tiicollet Mall, Minneapolis, Minnesota. A copy

<>f items (2) and (3) may be obtained upon request addressed to the U. S. fluclear bAulotory I.ommission, Washington, D. C.

20555. Attr:ntion:

Direct or, lii vis ion r,t Litenning.

< Dated at Bethesda, Maryland, this 27th day of liarch,1981.

FOR THE !iUCLEAR REGULATORY COMMISSION

//.

- /-

L s'a -%.cE-e

.. Thomas'A. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing I

3 4

w 4

P00R ORGNil g __ ___ - _ __

.