Advises of Decision to Withdraw License Change Application 15 to License NPF-1.Tendon Degradation Has Not Appeared During First Three Surveillance Tests,Therefore Change Not Warranted
ML19341D415
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 02/20/1981
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Clark R
Office of Nuclear Reactor Regulation
References
NUDOCS 8103050568
Download: ML19341D415 (1)


Text

--

/

h

,i' fibulI t9 m

V=C 4

".s,.h 0115816 b' Portland General Electric Ccorany Qv na.minese O

,.mmae ca g

h " *A<,- ) C

=,*

February 20, 19

3 g [.
,/

Trojan Nuclear Plant Docket 50-344 License NPF-1 License Change Application 15 Director of Nuclear Reactor Regulation ATTN:

Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

License Change Application 15 was submitted on December 10, 1976 and subsequently revised on July 21, 1977 to upgrade the Survailler.:.e requirements for the Containment tendons in response to Revision 2 to Regulatory Guide 1.35.

LCA 15 has been in a " Hold " status pending the issuance of Revision 3 to Regulatory Guide 1.35 which we understand may not occur for another 12 to 18 months. Therefore, based on the favorable results obtained from the current Contcinment tendon surveillance pro-gram, we have decided to withdraw License Change Application 15 to Facility Operating License NPF-1.

Since the differences between the program proposed under LCA 15 and the program under the existing Tech-nical Specification 4.6.1.6.1 are small for the situation where tendon degradation has not appeared during the first three surveillance tests, continued efforts to gain approval of this LCA are not warranted at this time. However, in the event that it becomes desirable to resubmit LCA 15 in the future or if other licensing action on this matter is required (e.g., as a result of Revision 3 to Regulatory Cuide 1.35), we expect to do so without incurring an amendment fee in accordance with 10 CFR 170.22.

Sincerely, A A Y Eart D. Withers Vice President 00/