ML19341D265
| ML19341D265 | |
| Person / Time | |
|---|---|
| Site: | 07000925, 07001193 |
| Issue date: | 02/19/1981 |
| From: | Finley A, Hind J, Patterson J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML19341D249 | List: |
| References | |
| 70-0925-81-01, 70-1193-81-01, 70-1193-81-1, 70-925-81-1, NUDOCS 8103050242 | |
| Download: ML19341D265 (2) | |
Text
__
.O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III Reports No. 70-1193/81-01; 70-925/81-01 Docket No.70-925 License No. SNM-928 Safeguards Group V Docket No. 70-1193 License No. SNM-1174 Safeguards Group I Licensee: Kerr McGee Nuclear Corporation Kerr McGee Center Oklahoma City, OK 73102 Facility Name: Cimarron Facility - Plutonium Plant - Uranium Plant Inspection At: Crescent, OK Inspection Conducted: January 26-29, 1981 Date of Last Material Control and Accounting Inspection:
June 1980 Type of Inspection: Unannounced Material Control and Accountability Inspectors:
~
ed.c./
^[M /f / 78/
A. G. Finley /
Date Auditor t
A'M.)
$ ff,!?N (1/ P. Patterson Date Chemist (d
M [9 cf/
Approved By:
. A. Hin'd', Chief Da te'
~
Safeguards Branch Inspection Summary Inspection conducted January 26-29, 1981 (Reports No.70-1193/81-01 and 70-925/81-01).
Areas Inspected: Nuclear material control and accountability including facility organization, facility operation, measurement and statistical controls, shipping and receiving, inventory, storage and internal con-trols, records and reports and management of materials control system.
The inspection involved 46 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.
8103050 YD
_~
l Results: 'The licensee was found to be compliance with NRC requirements in the eight areas examined during the iaspections except for the follow-ing four items:
1.
Failure.to measure standards during the week NDA measurements were i
made on plutonium wastes (Level VI).
f 2.
Unauthorized possesson of enriched uranium greater than 5% en-richment (Level V).
3.
Failure to document transfers from NBA 50 to NBA 12 (Level VI).
4.
Failure to use acceptable taaper-safe seals on hand in noncompli-
}
ance with License Condition 7.4 of HPP-3 (Level VI).
I L
f i
3
-1 i
I i
J I
I i
- -.