ML19341D265

From kanterella
Jump to navigation Jump to search
IE Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29. Noncompliance Noted:Unauthorized Possession of U W/ Enrichment Greater than 5% & Failure to Use Acceptable Tamper Safe Seals.Details Withheld (Ref 10CFR2.790)
ML19341D265
Person / Time
Site: 07000925, 07001193
Issue date: 02/19/1981
From: Finley A, Hind J, Patterson J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19341D249 List:
References
70-0925-81-01, 70-1193-81-01, 70-1193-81-1, 70-925-81-1, NUDOCS 8103050242
Download: ML19341D265 (2)


Text

__

.O U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III Reports No. 70-1193/81-01; 70-925/81-01 Docket No.70-925 License No. SNM-928 Safeguards Group V Docket No. 70-1193 License No. SNM-1174 Safeguards Group I Licensee: Kerr McGee Nuclear Corporation Kerr McGee Center Oklahoma City, OK 73102 Facility Name: Cimarron Facility - Plutonium Plant - Uranium Plant Inspection At: Crescent, OK Inspection Conducted: January 26-29, 1981 Date of Last Material Control and Accounting Inspection:

June 1980 Type of Inspection: Unannounced Material Control and Accountability Inspectors:

~

ed.c./

^[M /f / 78/

A. G. Finley /

Date Auditor t

A'M.)

$ ff,!?N (1/ P. Patterson Date Chemist (d

M [9 cf/

Approved By:

. A. Hin'd', Chief Da te'

~

Safeguards Branch Inspection Summary Inspection conducted January 26-29, 1981 (Reports No.70-1193/81-01 and 70-925/81-01).

Areas Inspected: Nuclear material control and accountability including facility organization, facility operation, measurement and statistical controls, shipping and receiving, inventory, storage and internal con-trols, records and reports and management of materials control system.

The inspection involved 46 inspection-hours onsite by two NRC inspectors and was begun during the regular hours.

8103050 YD

_~

l Results: 'The licensee was found to be compliance with NRC requirements in the eight areas examined during the iaspections except for the follow-ing four items:

1.

Failure.to measure standards during the week NDA measurements were i

made on plutonium wastes (Level VI).

f 2.

Unauthorized possesson of enriched uranium greater than 5% en-richment (Level V).

3.

Failure to document transfers from NBA 50 to NBA 12 (Level VI).

4.

Failure to use acceptable taaper-safe seals on hand in noncompli-

}

ance with License Condition 7.4 of HPP-3 (Level VI).

I L

f i

3

-1 i

I i

J I

I i

- -.