Interim Deficiency Rept Re Sway Strut Rod Ends,Initially Reported 801031.Bechtel Is Reviewing Spacer Size & Bearing Movement for Acceptance as Resolution to Loose Bushing Problem.Interim or Final Rept Expected by 810410
ML19341C978
Person / Time
Site: Midland
Issue date: 02/27/1981
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 11501, 80-05-#3, 80-5-#3, NUDOCS 8103040645
Download: ML19341C978 (3)


Text

  1. . * .

f%.

' W%Q par % Consumers

' I L';l James W Cook h

Q Vice President - Projects, Engsneering W- and Construction General offices: 1945 West Pernall Road, Jackson, MI 49201 * (517) 788-0453 February 27, 1981 80-05 #3 ot Q

Mr J G Keppler, Regional Director (

,d, Office of Inspection & Enforcement US Nuclear Regulatory Ccenission C f{ g (

Regicn III 799 Roosevelt Road C J tM O 31931"M a u c, s to**

h2 Glen Ellyn, IL 60137  %, " co p*55" t D

MIDLA:iD PLANT, UNITS 1 A'.'D 2 Q. xN Af 4\ -

DOCKET NOS 50-329, 50-330 / Vn" SWAY STRUT ROD E' IDS DEFICIE' ICY FILE: 0 h.9.L2 UFI: 73*10*01, 152LO(E) SERIAL: 11501

Reference:

CPCo letters to J G Keppler; Same Subject;

1) Serial No 978h, dated October 31, 1980
2) Serial No 11009, dated January 15, 1981 This letter, as were the referenced letters, is an interim 50.55(e) repcrt cencerning the sway strut rod ends deficiency.

Enclosure (1) describes the status of the resolution as of February 13, 1981.

Another report, either interim or final, vill be sent en or before Acril 10, 1981.

JLW/lr Enelcsure: (1) MCAR L2, Interim Report No 3 (February 13, 1981),

Lcose Hanger Standard Parts Rushings CC: Director of Office of Inspecticn & Enforcement Att Mr Victer Stello, US:IRC (15)

Directer, Office of Managecent Informatien L Program Control, US:iRC (1)

RJCook, US:iRC Resident Inspector Midland !uclear Plant (1) 810304069'5 g

( '

2 Serial 11501 80-05 #3 CC: CBechhoefer,..SLB Panel GALinenberger, ASLB Panel FPCowan, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair CRStephens, USNRC WDPaton, Esq, USNRC FJKelly, Esq, Attorney General SHFreeman, Esq, Asst Attorney General Ll' Taylor, Esq, Asst Attorney General WHMarshall GJMerritt, Esq, TNK&J l

l l

o . l

^

Enclosure 1 Bechtel Associates Professional Corporation E**j5 1 022055

SUBJECT:

MCAR 42 (Issued 9/24/80)

Loose Hanger Standard Parts Bushings INTERIM REPORT 3 DATE: February 13, 1981 PROJECT: Consumers Power Company Midland Plant Units 1 and 2 Bechtel Job 7220 Status of Corrective Action and Investigation The status of actions in progress for resolution of the subject manage-ment corrective actior. report (MCAR) is as follows:

Corner and Lada Company, Incorporated h*s been requeated to evaluate the use of spacers or other methods rather *.han the staking method pre-viously used. Corner and Lada stated that Bechtel could install spacers, but Bechtel would have to assume liability for the function of the strut. Bcchtel will continue to seek an acceptable resolution from Corner and Lada.

NPS Industries Inc. is investigating the use of washers to prevent dislodgement of their bushing. NPS had previously provided staking procedures to retain the bushings.

Bergen-Paterson Pipe Support Corporation has not yet responded with a resolution to the loose bushing problem. Bechtel will pursue a reso-lution frca Bergen Patterson.

Through dimensional analysis, ITT Grinnell has established that, although some partial bearing disengagement might be possible, the use of spacers will preclude total disengagement without affecting the proper design function of the sway struts. Grinnell has provided Bechtel with spacer sizes for all sway struts and shock arrestors provided to the Midland project. Grinnell also provides spacers with all sway struts and shock arrestors furnished for the Midland project. Bechtel is reviewing spacer size and bearing movement for acceptance as a resolution to the loose bushing problem.

The next interim raport is scheduled for >brch 27, 1981.

Prepared by: 1 Reviewed by: .st f-d b,2.n3 w ncurreece by: /