ML19341C918
| ML19341C918 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 02/11/1981 |
| From: | David Jones, Mcalpine E, Todd G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19341C916 | List: |
| References | |
| 70-1151-81-01, 70-1151-81-1, NUDOCS 8103040502 | |
| Download: ML19341C918 (1) | |
Text
fuT5iAL 701"V0 !!EMml CONTAli:3 2.M i.JR. LEO.i O
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION II FE B 121981 Report No. 70-1151/81-1 Docket No. 70-1151 License No. SNM-1107 Safeguards Group III Licensee: Westinghouse Electric Corporation Nuclear Fuel Division Drawer R Columbia, South Carolina 29250 Inspection Conducted: January 12 and 13,1981 Type of Inspection: Announced Material Control & Accounting Inspectors:
NAWCQ_Qom 1 2 /11 / ? l F'
Date Signed G. A. fddd, Auditor E9WCL6u L 2./n / r 1 D. W. \\1ones, St)ati sti'cian Date Signed Approved by:
CD
- RW%
2./II /8 E. J. McAlpine, Sedtion Chief, Safeguards Branch Date Signed Inspection Summary Areas Inspected:
Independent inspection of the Fundamental Nuclear Material Control Plan.
The inspection involved 14 inspector-hours on site by two NRC inspectors and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the area examined during the inspection.
S-F2 Copy of Copies A
Pnges g.N'.R T','?9IE.3 IIEEE3 I This Docurent is not to be" 81030407@-
CWik ' =#' =
((;;l3*o*NN['"