ML19341C759
Jump to navigation
Jump to search
| ML19341C759 | |
| Person / Time | |
|---|---|
| Issue date: | 01/14/1981 |
| From: | Potapovs U NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Wahl H BECHTEL GROUP, INC., BECHTEL POWER CORP. |
| Shared Package | |
| ML19341C760 | List: |
| References | |
| REF-QA-99900501 NUDOCS 8103040136 | |
| Download: ML19341C759 (1) | |
Text
l
[c ~ ' b',
s UNITED STATES NUCLEAR REGULATORY COMMISSION 7
,fs l
"v.
REcioN iv 611 RYAN PLAZA DRIVE, SulTE 1000
?,
.s ARLINGTON, TEXAS 76011 1 4 m ss.
- e Docket No.
99900501/80-01 fg s
/
0ggg3\\*k',
Bechtel Power Corporation
$ b" 0'
- pp)$kp /j Ann Arbor Power Division VEB r
Attn: Mr. H. W. Wahl Vice President and General Manager
/d P. O. Box 1000
.~
d Ann Arbor, Michigan 48106 Gentlemen:
Thank you for your letter of January 6,1981, changing your December 9,1980 letter commitment date from December 31, 1980 to March 31, 1981, for Deviation C.
This revised date is acceptable to us.
We will review your corrective action and preventive measures during a future inspection.
Sincerely, Uldis tapovs Chi Vendor Inspection Branch cc:
J.
Milandin
?
8108040136
,