Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Eight Suspect Valves Have Been Supplied.Replacement of Coils Will Be Completed by 810416
ML19341C295
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 02/11/1981
From: Rausch T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-80-23, NUDOCS 8103020668
Download: ML19341C295 (2)


Text

-

4

[.fN Commonwrith Edison one First National Plaza. Chicago, lihnois i Address Reply to: Post Othee Box 767 Chicaga, Illinois 60690 j

February 11, 1981

%I c>y m

(

Mr. James G. Keppler, Director 9 Q)

Enforcement - Region III

{

y/g /([ [g k

Directorate of Inspection and 44 g

U.S. Nuclear Regulatory Commission 4

/

799 Roosevelt Road Glen Ellyn, IL 60137 4

f N

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Response to IE Bulletin 80-23

" Failures of Solenoid valves Manufactured by Valcor Engineering Corporation" NRC Docket Nos. 50-454/455 and 50-456/457 References (a):

J. G. Keppler letter'to C. Reed dated November 14, 1980 (b):

T.

J. Rausch letter to J. G. Keppler dated December 29, 1981-

Dear Mr. Keppler:

The Commonwealth Edison Company review conducted in accordance with the subject bulletin disclosed that eight (8) of the i

suspect valcor Engineering Corporation solenoid valves have been supplied as solenoid operators on Anchor / Darling valves at Byron and Braidwood Stations (4 per station).

These solenoid valves are not i

subjected to high temperatures, therefore we do not expect to encounter the problem described in the bulletin.

It is our intent-to replace the coils in these solenoids-with new coils supplied by valcor.

Replacement will be completed

~

l prior to-commencing operation (the current schedule is to have-replacement completed by April 16,-1981).

I Approximately 18 man-hours were e'xpended in conduct of the l

review and preparation of this report.

The manpower required to j

replace the coils is estimated to be a total of 20 man-hours.

i 3108026 i

FEB 12 93I

r

. Please address any questions you may have concerning this matter to this office.

Very truly yours, hhwf

%4 Thomas J. Rausch Nuclear Licensing Administrator Special Projects cc: