Responds to NRC Re Violations Noted in IE Insp Repts 50-352/79-12 & 50-353/79-11.Corrective Actions:Insp Program of Installed Pipe Hanger Support Pins Modified. Pins Tested & Batch Rejected If Incorrect Matl Found
ML19341C015
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 12/12/1980
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19341C012 List:
References
NUDOCS 8102280408
Download: ML19341C015 (1)


Text

.

.. _ s O

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA, PA.19101 12:51841-4502 DEC 121^30 m.m.m.,,

Mr. Boyce Grier, Director United States Nuclear Regulatory Commission Office of Inspection Enforcement, Region I 631 Park Avenue King of Prussia, PA 19406

Subject:

USNRC IE Region I Letter, dated !! arch 12, 1980 RE: Site and Office Inspection of November 29-30, and December 3-21, 1979

References:

a) Inspection Report #50-352/79-12 and 50-353/79-11 Limerick Generating Station, Units 1 and 2 b) PECO Letter to the NRC, dated April 10, 1980 c) PECO Letter to the NRC, dated June 10, 1980 d) PECO Letter to the NRC, dated September 3,1980 File: QUAL 1-2-2-1 (79-12)

QUAL 1-2-2-2 ' (79-11)

Dear Mr. Grier:

The inspection program of the installed pipe hanger support pins described I

in reference c) has been modified as a result of further engineering evaluation of the hanger pins being rejected by the visual inspection process.

i The modification is that after visually rejected pins are replaced, the rejected pins are then subjected to material analysis testing.

If the material analysis identifies the incorrect (A-36) material, the batch / lot from which this pin came is then rejected and as stated in reference c), the entire batch / lot will be 100% inspected, l