ML19341B671

From kanterella
Jump to navigation Jump to search
Submits Revision 2 to Reflect Daniel Intl Corp Quality & Technical Svcs Organizational Changes Re QA Programs for Design & Const
ML19341B671
Person / Time
Site: Wolf Creek, Callaway  Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/29/1981
From: Seiken S
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
81-005, 81-5, NUDOCS 8102030602
Download: ML19341B671 (2)


Text

^

o SNUPPS Standardised Nuclear Unit Power Plant System 5 Choke Cherry Road f:foT[24Efo January 29, 1981 SLNRC 81- 005 FILE: 0542/0491.3 SUBJ: SNUPPS Quality Assurance Programs for Design and Constructior Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Dockets: 50-482, 50-483, 50-486 Ref: SLNRC 80-47 dtd. 10/9/80: Subj. as Above

Dear Mr. Denton:

In the reference letter, SNUPPS transmitted to the NRC an uncontrolled copy of Revision 1 to the subject quality assurance program description.

Revision 1 was prepared to reflect clarifications and igreements resulting from NRC review comments and was subsequently endors_; by NRC letter of Dec. 22, 1980 from fir. Youngblood.

The purpose of this letter is to provide NRC, Attention, Mr. Haass, Chief Quality Assurance Branch, with Revision 2 to the subject program descrip-tions. The substance of this revision is as follows:

O incorporates changes in the Daniel International Corporation Quality l

and Technical Services organization. These changes are intended to i

strengthen the function and independence of the Daniel quality effort I

and are applicable to the construction of Callaway and Wolf Creek plants.

The substance of these changes were reviewed with NRR Project Manage-ment and Quality Assurance Staff on August 13, 1980.

O clarifies project commitments as they relate to the procurement and acceptance of simple off-the-shelf items. These clarifications are intended to permit off-the-shelf, commercially-available items to be accepted on the basis of receipt inspections without need for supporting l

quality verification documentation or preaward evaluation.

l l

A number of other minor changes are also included in Revision 2; these are l

limited to updating of organizational' relationships applicable to the Wolf Creek unit. A similar updating is in preparation for Callaway. These l

modifications are minor in nature and neither detract from nor inhibit pre-l vious licensing or quality program commitments.

g g

su ue.

l

l l

e j

SLNRC 81-005 l

l Page Two 1

}

Controlled copies of Revision 2 have been distributed to the NRC l

Offices of Inspection and Enforcement for Regions I, III, and IV.

If you have any questions concerning the attached revision, please I

contact the undersigned, i

i Very truly yours, S. J. Seiken i

Q.A. Manager j

r l

SJS:dck:5bl I

l Encl.: Revision 2 to the SNUPPS QA Programs j

for Design and Construction cc:

W. P. Haass, USNRC, w/ encl.

4 J. K. Bryan, UE w/o enc 1.

G. L. Koester, KGE w/o enc 1.

i D. T. McPhee, KCPL w/o encl.

4 9

t f

}

}

4 i

,-n,-

,-e-.~.w-a n,-

m--.n,

-,..e,,

,_a.w,

.,v

,.n.m.,

,n.

, -,., - +, - -, -,

.-n,.,,

,,..,.,--,.,.,.,,,, -.u,..-

,,.,,,..,..-,,,---, -