o SNUPPS Standardised Nuclear Unit Power Plant System 5 Choke Cherry Road f:foT[24Efo January 29, 1981 SLNRC 81- 005 FILE: 0542/0491.3 SUBJ: SNUPPS Quality Assurance Programs for Design and Constructior Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Dockets: 50-482, 50-483, 50-486 Ref: SLNRC 80-47 dtd. 10/9/80: Subj. as Above
Dear Mr. Denton:
In the reference letter, SNUPPS transmitted to the NRC an uncontrolled copy of Revision 1 to the subject quality assurance program description.
Revision 1 was prepared to reflect clarifications and igreements resulting from NRC review comments and was subsequently endors_; by NRC letter of Dec. 22, 1980 from fir. Youngblood.
The purpose of this letter is to provide NRC, Attention, Mr. Haass, Chief Quality Assurance Branch, with Revision 2 to the subject program descrip-tions. The substance of this revision is as follows:
O incorporates changes in the Daniel International Corporation Quality l
and Technical Services organization. These changes are intended to i
strengthen the function and independence of the Daniel quality effort I
and are applicable to the construction of Callaway and Wolf Creek plants.
The substance of these changes were reviewed with NRR Project Manage-ment and Quality Assurance Staff on August 13, 1980.
O clarifies project commitments as they relate to the procurement and acceptance of simple off-the-shelf items. These clarifications are intended to permit off-the-shelf, commercially-available items to be accepted on the basis of receipt inspections without need for supporting l
quality verification documentation or preaward evaluation.
l l
A number of other minor changes are also included in Revision 2; these are l
limited to updating of organizational' relationships applicable to the Wolf Creek unit. A similar updating is in preparation for Callaway. These l
modifications are minor in nature and neither detract from nor inhibit pre-l vious licensing or quality program commitments.
g g
su ue.
l
l l
e j
SLNRC 81-005 l
l Page Two 1
}
Controlled copies of Revision 2 have been distributed to the NRC l
Offices of Inspection and Enforcement for Regions I, III, and IV.
If you have any questions concerning the attached revision, please I
contact the undersigned, i
i Very truly yours, S. J. Seiken i
Q.A. Manager j
r l
SJS:dck:5bl I
l Encl.: Revision 2 to the SNUPPS QA Programs j
for Design and Construction cc:
W. P. Haass, USNRC, w/ encl.
4 J. K. Bryan, UE w/o enc 1.
G. L. Koester, KGE w/o enc 1.
i D. T. McPhee, KCPL w/o encl.
4 9
t f
}
}
4 i
,-n,-
,-e-.~.w-a n,-
m--.n,
-,..e,,
,_a.w,
.,v
,.n.m.,
,n.
, -,., - +, - -, -,
.-n,.,,
,,..,.,--,.,.,.,,,, -.u,..-
,,.,,,..,..-,,,---, -