ML19341B668

From kanterella
Jump to navigation Jump to search
Forwards Amend 54 to Fsar.Summary of Status of TMI Open Items Encl
ML19341B668
Person / Time
Site: LaSalle  
Issue date: 01/29/1981
From: Abel J
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19341B669 List:
References
NUDOCS 8102030584
Download: ML19341B668 (4)


Text

-

N Commonwrith Edison 3[M$ff V{ )7 Address Reply to: Post Othee Box 767

  • as

. one First National Plaza. Chicago, Illinois Q Chicago, liiinois 60690

'/

& g ' ' LZ) 5 5

0 ]g lS 8

P

~ 4 %r4 9

January 29, 1981 m

g Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

LaSalle County Station Units 1 and 2 Amendment No. 54 to the Final Safety Analysis Report (FSAR)

NRC Docket Nos. 50-373/374-

Dear Mr. Denton:

Attached is Amendment No. 54 to the LaSalle County Station Unit 1 and 2 Final Safety Analysis Report.

This amendment transmits responses to sixteen (16) se cond round questions and voluntary. text and response revisions addressing some of the open issues which have been discussed previously with your Staff.

Also included as an attachment to this letter is a summary of the status of all open issues identified by your staff.

Three (3) signed originals and fifty-seven (57) copies of this amendment are submitted for your review and approval.

Very truly yours, JI S. dbel Director of Nu clear -Licensing Enclosures SUBSCRIBED and SWORN to

'before meg his 295/

day of:,

_'.J h g m -,.1981 v

01628 I

-.=

=

m 4

Pre-TMI Issue Summary i

Do ck.a t

{

Item

Response

Status t

i j

1.

Flood Potential 02-02-81 Rework in Progress 1

2.

Shear Modulus Am. 54 Complete I

3.

Int. Missiles Am. 55 (1)

In Progress 4.

MKII l

(a) 4/81 In Progress (b) 4/81 Draft Submitted (12-17-81) 1

( c) 1-08-81 Complete (d) 2-02-81 5.

Jet Pump Beams Am. 54 Complete i

6.

PSI /ISI 12-12-80 Clarification i

In Progress 7.

SQRT 2-02-81 In Progress 8.

Env. Qual.

2/81 Final Report in Progress i

i 9.

Fuel Rupt.

2-2-81 10.' Fuel Uplift 2-2-81 j

-11.-Chan. Box 2-2-81

12. MCPR 2-13-81 In Progress i
13. ODYN.

2-13-81~

'In_ Progress I

14. CRD Test Am. 54-Complete
15. SDV Am. 55 Draft Submitted l

(12-17-80) i

16. SDV's Am. 55 Draft Submitted-(12-17-80)

. 12-17-80

-Complete-

17. ATWS
18. ISI 12112 Clarification in Progress
19. Syst. Leakage Am.- 54 Complete
20. App. G&H Am. 54-Complete j
21. SDV Flow Am. 55; Draft Submitted

.(12-17-80) i

22. RHR (A/C)

Am. 54 Complete

23. Steam Bypass APPEALL
24. App. J Am.;54-Complete
25. Filled 1ECCSL 12-17-80 Complete.
26. RHR Isol.

Am. 54 CompleteL 27.-ECCS Leak Am. 55 1~

Draft by 2-13-81

28. Separation-Draft by 2-13-81 i
29. Test Te ch 2-2-81
30. Setpoints Am. 55 Oraft by 2-13-81 j
31. 0wgs. (LLS)-_

JL m. ~ 5 4 Complete.

j

32..Dwgs. (RCIC)

Am. 54 Complete.

I i

. 33. Saf. Disp.

Am. 55 Draft by 2-13-81

34. RBM Awaiting NRC
35. Deg. Grid Am. 54 Complete
36. Shared Diesel Am. 54 U2 submittal Am. 55
37. Pent. Isol.

APPEAL

38. RPSMG Am. 50 Complete
39. Therm. Over.

Am. 54 Complete

40. Separation Draft by 2-13-81
41. Fire Prot.

(a)( c)

Am. 49 Complete (b)

Am. 49 Complete (d) 2-2-81 (e)(f)

Am. 55 In Progress

42. Rad Prot.

Am. 54 Awaiting NRC

43. Se curity 2/81 Draft by 2-13-81
44. Non-Saf. Equip.

Am. 55 See Items 12 aled 13

45. Shaft Seizure Am. 53 Closed
46. Te ch Specs Awaiting NRC 47 Qual Assur Am. 54 Complete
48. Fin. Quals.

Awaiting NRC Notes:

(1)

Amendment 55 is scheduled to be submitted before March 1, 1981.

A draft of this amendment will be available for NRC review by February 16, 1981.

01628 i

i l

TMI Issues Appendix L of the LaSalle County Station FSAR which is submitted as a part of Amendment 54 to that FSAR addresses all licensing requirements for NTOL plants delineated in NUREG-0737.

The materials presented therein are complets and responsive to previous NRC Staff questions, with limited exception.

The exceptions include:

1.

Task II.B.2 Plant Shieloing The routes to vital areas and descriptions of shielding modifications made to date are now being documented and are e xpected to be submitted in Am. 55.

2.

Task II.K.3.27 Common Water Level Reference The LaSalle County response is being revised to provide for a common reference level.

The response in Am. 54 does not now make that commitment.

This revised response will be included in Am. 55.

3.

Task II.K.3.46 Michelson Concerns Although a preliminary evaluation of this item has been completed and the BWR Owners Group has responded with a generic submittal applicable to LaSalle County, further review is in progress and will be submitted at a later date.

0162B 1

e T

~

tr--

rw-t?vc upg--

r--

  • vv

Commonwealth Edison Cne Fest Natonal P'aza Chcago te0 S Acdress Reply to. Post Omce Scx 767 Checa;;o. li!co:s 60690 V

January 29, 1981 Mr. Harolc R.

Denton, Director Of fice of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission nashington, DC 20555 Subj e ct :

LaSalle County Station Units 1 and 2 Amenoment No. 54 to the Final Safety Analysis Report (FSAR)

NRC Docket Nos. 50-373/384

Dear Mr. Denton:

A t t a ched is Amenoment No. 54 to the LaSalle County Station Unit 1 ano 2 Final Safety Analysis Report.

Tnis amendment transmits responses to sixteen (16) se cond round questions and voluntary text and response revisions addressing some of the open issues which have oeen discussed previously with your Staf f.

Also included as an

-s

(

\\

a t t a chme n t to this letter is a summary of the status of all upen

~'

issues ioentified by your staff.

Three (3) signed originals ana fifty-seven (57) copies of this amendment are submittec for your review and approval.

Very eruly yours, c' r'

(

J.

S. Abel Director of Nuclear Licensing En clo sure s SUBSCRISED and SWORN to before megthis

[ hp day of

_ 'l 1,.. -

1981 y

/

A, 01628 r

}

Pre-TMI Issue Summary Do cke t Item-

Response

Status i

1.

Flood Potential 02-02-81 Rework in Progress 2.

Shear Modulus Am. 54 Complete 3.

Int. Missiles Am. 55 (1)

In Progress 4.

MKII (a) 4/81 In Progress (b) 4/81 Draft Submitted (12-17-81)

( c) 1-08-81 Complete (d) 2-02-81 5.

Jet Pump Beams Am. 54 Complete 6.

PSI /ISI 12-12-80 Clari fi ca tion In Progress-7.

SQRT 2-02-81 In Progress 8.

Env. Qual.

2/81 Final Report in Progress 9.

Fuel Rupt.

2-2-81

10. Fuel Upli#t 2-2-81 1
11. Chan. Box 2-2-81

()

12. MCPR 2-13-81 In Progress
13. ODYN 2-13-81 In Progress
14. CRD Test Am. 54 Complete
15. SDV Am. 55 Draft' Submitted (12-17-80)
16. SDV's Am. 55 Draft Submitted

~4 (12-17-80) 1

17. Ai. 3 12-17-80 Complete
18. ISI 12-12-80 Clarification in Progress
19. Syst. Leakage Am. 54 Complete
20. App. G&H Am. 54

. Complete-

21. SDV Flow Am. 55

. Draft Submitted (12-17-60)

22. RHR (A/C)

Am. 54 Complete

23. Steam Bypass APPEAL
24. App. J Am. 54_

Complete

25. Filled ECCS 12-17-80 Complete
26. RHR Isol.

Am. 54 Complete

27. ECCS Leak Am. 55 Draft by 2-13-81
28. Separation Oraft by 2-13-81
29. Test Tech 2-2-81
30. Setpoints Am. 55-JDraft by 2-13-81
31. Dwgs. (LLS)

Am. 54

. Complete

32. Dwgs..(RCIC)

()

Am. 54 Complete

-w._

33. Saf. Disp.

Am. 55 Draft by 2-13-81

34. RBM Awaiting NRC
35. Deg. Grid Am. 54 Complete
36. Shared Diesel Am. 54 02 submittal Am. 55
37. Pent. Isol.

APPEAL

38. RPSMG Am. 50 Complete
39. Therm. Over.

Am. 54 Complete

40. Separation Draft by 2-13-81
41. Fire Prot.

(a)( c)

Am. 49 Complete (b)

Am. 49 Complete (d) 2-2-81 (e)(f)

Am. 55 In Progress

42. Rad Prot.

Am. 54 Awaiting NRC

43. Security 2/81 Draft by 2-13-81
44. Non-Saf. Equip.

Am. 55 See Items 12 and 13

45. Shaft Seizure Am. 53 Closed
46. Te ch Specs Awaiting NRC
47. Qual Assur Am. 54 Complete
48. Fin. Quals.

Awaiting NRC Notes:

(1)

Amendment 55 is scheduled to be submitted before

(,\\

March 1, 1981.

A draft of this amendment will be available for NRC review by February 16, 1981.

01628 Ov

{JS TMI Issues Appendix L of the laSalle County Station FSAR which is submitted as a part of Amenda.ent 54 to that FSAR addresses all licensing requirements for NTOL plants delineated in NUREG-0737.

The materials presented therein are complete and responsive to previous NRC Staff questions, with limited e xception.

The exceptions include:

1.

Task II.B.2 Plant Shielding The routes to vital areas and descriptions of shielding modifications made to date are now being documented and are e xpe cted to be submitted in Am. 55.

2.

Task II.K.3.27 Common Water Level Reference The LaSalle County response is being revised to provide for a common reference level.

The response in Am. 54 does not now make that commitment.

This revised response will be included in Am. 55.

3.

Task II.K.3.46 Michelson Concerns Although a preliminary evaluation of this item has been

()

completeo and the BWR Owners Group has resporided with a generic submittal applicable to LaSalle County, further review is in progress and will be submitted at a later date.

01628 l

l l

('j) l u

l