ML19341B346
| ML19341B346 | |
| Person / Time | |
|---|---|
| Issue date: | 11/20/1980 |
| From: | Hoyle J NRC OFFICE OF THE SECRETARY (SECY) |
| To: | |
| References | |
| ACRS-MA-0972, ACRS-MA-972, NUDOCS 8101300775 | |
| Download: ML19341B346 (6) | |
Text
M[-o91>
/,'i.9.bxW[/f/S
/
Federal Register Notice
/
g
)
NUCLEAR REGULATORY COM'iISSION 6j JM 21 @.
ADVISORY COMMITTEE ON REACTOR SAFEGUARDS v,,, %*=os,
g Notice of Proposed Meetings In order to provide advance information rega rding pr b
J 'n;gs f
of the ACRS Subecmmittecs and Working Groups, and of the full Committee, the following preliminary schedule reflects the current situation, taking into accou'nt additional meetings which have been scheduled and meetings which have been postponed or c:.cc!1 eta since the last list of proposed meetings published Oct. 24, 1980 (45 FR 70606).
These meetincs v6fch are definitely scheduled have had, or will have, an individual notice publimed in the Federal Register approximately 15 days (or more) prior to the meet-ing. Those Subconnittee and Working Group meetings for which it is anticipated that there will be a portion or all of the meeting open to the public are indicated by an asterisk (*).
It is expected that the sessions of the full Committee meeting designated by an asterisk (*) will be open in whole or in part to the public.
ACRS full Committee meetings begin at 8:30 a.m.,and Subcommittee and Working Group meetings usually begin at 8:30 a.m.
The exact time when iteins listed on the agenda will be discussed during full Committee meetings and when Subcommittee and Working Group meetings will start will be published prior to each meeting.
Information as to whether a meeting has been firmly scheduled, cancelled, or rescheduled, or whether changes have been made in the agenda for the December 1980 ACRS full Committee meeting can be obtained by a prepaid telephone call to the Office of the Executive Director of the Committee (telephone 202/634-3267, ATTN:
Mary E. Vanderholt) between 8:15 a.m.
and 5:00 p.m., Easterm Time.
E 310130 h
3-
- procedures and Adninistration, December 3,1980 (afternoon), Washington, DC.
The Subcommittee will discuss proposed procedures and guidelines for ACRS review of safety related standards and criteria consistent with the memo of understanding between the EDO and ACRS regarding ACRS participation in the NRC rulemaking process and the Atomic Energy Act, Section 29.
Notice of this meeting was published Nov.18.
- Emergency Core Cooling Systems, December 10-11, 1980, San Jo se, CA. The Subcommit-tee will review NRC research programs related to transients LOCA and ECCS.
Notice of this meeting was published Oct. 24 Reactor Radiological Effects and Site Evaluation, December 11, 1980, Washington, DC.
The Subcommittee will discuss preparation of appropriate chapters of the ACRS Annual Report to Congress regarding the NRC Reactor Safety Research Program Budget.
Notice of this meeting was published Oct. 24.
- Reactor Radiological Effects, December 12, 1980, Washington, DC. The Subcommittee will discuss the state-of-the-art in the area of radiation standards and dose limits to radiation workers.
Notice of this meeting was published Oct. 24.
- Site Evaluation and Reactor Radiological Effects, December 13, 1980, Washington, DC.
The Subcommittees will discuss the Generic Environmental Impact Statement on Class-9 Accidents at nuclear power plants. Also, the Subcommittees will discuss and summarize the previous two days meetings on the ACRS Annual Report to Congress regarding tne NRC Reactor Safety Research Program Budget, and the discussion on radiation standards for workers.
Notice of this meeting was published Oct. 24.
- Combination of Dynamic Loads, December 16-17,198Q. Washington, DC. The Subcommittee will continue its review regarding the use of dynamic load combinations as
' i gn basis for nuclear power plants.
Notice of this meeting was published Oct. 24.
4
- 3abcock and Wilcox Water Reactors, December 18, 1980, Washington, DC. The Subcom-mittee will review the Feb. 25, 1980 event at Crystal River, Unit 3 to determine if there are any significant features or causes that are generic to Babcock and Wilcox water reactors.
Notice of this meeting was published Nov.10.
- AC/DC Power Systems Reliability, Mid-December (date to be announced), Washington, i
i DC.
The Subcommittee will discuss the expected NRC Report on DC Power Systems Reliability and the NRC plans for future work.
(Tentative )
- Regulatory Activities, January 6,1981,/ Washington, DC. The Subcommittee will review regulatory guides and revisions to existing regulatory guides; also, it may discuss pertinent activities which affect the current licensing process and/or reactor operation.
- Metal Comoonents, January 7,1981, Washington, DC.
The Subcommittee will discuss inservice inspection techniques as applied to the.'eactor coolant pressure boundary.
tbtice of this meeting was published Oct. 24 Reactor Sa fety Research Program, January 7,1981, Washington, CC. The Subcommittee will discuss draft chapters of the ACRS Annual Report to Congress on NRC's FY-82 Reactor Safety Research Program Budget.
- Emergency Core Cooling Systens, January 15, 1981, Al buque rque, NM. The Subcommittee will meet to discuss progress in the NRC Reactor Safety Research Programs on ELCS/LOCA, and Transient Code development.
- Consideration of Class-9 Accidents, January 16, 1981, Albuquerque, NM. The Subcom-mi tte will discuss the research programs at Sandia Laboratories on steam explosions and H2 mitigation features.
S
--.v
. - ~.
,-.,.7 r
. at plant site near
- Fort St. Vrain Nuclear Power Plant, January 27,1981 (Tentative),/Longmont, C0 The Subcommittee wil review operating experience, degree of success in eliminating the core power fluctuations, test results above 70% of rated power, core performance (fuel and structural), and plans for future operations, modifications, and refueling.
l
- Extrece External phenomena, January 29-30, 1 981, Los Angeles, CA. The Subcommittee will discuss the status of the Seismic Safety Margins Program.
It is expected that phase 1 of this Program will have been completed by the time of this meeting.
- Indian Point Nuclear Power plant, Unit 2, and Metal Comconents, January,1981, (date to be announced), Washington, DC. The Subcommittee will review the contain-ment leakage accident and will discuss the possible pressure vessel degradation
)
caused by the accident.
- Regulatory Activities, February 3,1981, Washington, DC.
The Subcommittee will review regulatory guides and revisions to existing regulatory guides; also, it may discuss pertinent activities which affect the current licensing process and/or reactor operation.
Reactor Safp*y Research program, February 4,1981 (tentative), Washington, DC.
The Subcommittee will discuss the draft ACRS Annual Report to Congress on the NRC's FY-82 Reactor Safety Research Program Budget.
- ACRS FULL COMMITTEE MEETINP,S December 4-6, 1980 A.
- Three Mile Island Nuclear Power Station, Unit 1 - Proposed restart and operation of this Unit.
B.
' North Anna Nuclear Power Station, Unit 2 - Discuss matters related to plant staffing, results of the augmented low-power test program, steam generator tube integrity, and decay beat removal capability.
C.
- Generic Items Acolicable to Light-Water Reactors - Discuss proposed revisien of ACRS report regarding the status of unresolved generic items applicable to light-water reactors.
D.
- Prcoosed NRC Guidelines Regarding Utility Manacement Structure and Technical Succort - Discuss proposed NRC guidelines.
E.
- BilR Hydraulic Scram Systems - Discuss proposed ACRS report regarding design and performance of these systems.
F.
- Indian Point Nuclear Power Station, Unit 2 - Discuss incident of Oct.17, 1980 in which a large quantity of service water was released into the contain-ment from piping system leaks.
G.
- Meeting with NRC Chairman and Commissioners - Discuss items related to the NRC regulatory process and nuclear plant safety.
H.
- Recorts of ACRS Subcommittees Regarding Various Safety Related Matters -
Waste management and disposal, improved engineered safety features, considera-tion of Class-9 Accidents in nuclear power plant design, and evaluation of nuclear power plant operating experience.
t
, I.
The Committee will also consider and discuss:
- 1) *The conceptual design for a Passive Centain: cent System proposed for licensing.
- 2)
- Clarification of its report of April 16. 1980 to NRC regarding Acticipated Transients Without Scram.
- 3) *The schedule for ACRS consideration of items at future meetings.
January 8-10, 1981: Agenda to be announced.
February 5-7, 1 981: Agenda to be announced.
,/
d Date N6 d J)/5'[D Jo hn C. Hoyl e Advisory Comittee Management Officer
.n.,-
"'