VERMONT Y AN N EE NUCLEAR POWJCR CORPOR ATION SEVENTY SEVEN GROVE STREET 2.C.2.1 RUTLAND. VF.RMONT 05701 FVY 81-15 REPLY TOs ENGINEERING OFFICE 1671 WORCESTER HOAD F R A kuNGH A M. M ASS ACHUS ETTs ot 7of itLEPHONt et7 872-8tOO
-3 January 27, 1981 wJ 23 United States Nuclear Regulatory Commission Washington, DC 20555 n;
g3 M
5
[$
Attention:
Office of Nuclear Reactor Regulation Thomas A.
Ippolito, Chief Operating Reactor Branch #2 Division of Licensing Re ferences : (1) License No. DPR-28 (Docket No. 50-271)
(2) VYNPC Letter to l'ONRC dated October 11, 1978, WVY 78-92 (3) VYNPC Letter to USNRC dated July 27, 1979, WVY 79-83' (4) USNRC Letter to VYNPC dated September 24, 1980 (5) USNRC Letter to GE dated February 23, 1979 (6) USNRC Letter to VY dated August 7, 1978
Dear Sir:
Subject:
Reactor Protection System (RPS) Power Supply In References (2) and (3) Vermont Yankee committed to perform increased' surveillance and additional testing of the RPS Motar-Generator sets.
It was, and still is, our opinion that these changes, coupled with minor equipment-modifications, would satisfy the concerns regarding operability of the RPS Motor-Generator Sets.
However, Reference (4) states that the use of alarms or shift surveillance is only acceptable as an interim measure and not-adequate for the long-term solution.
For the long-term solution, modifications should be made to provide fully redundant Class IE protecti'on at the interface of the non-Class 1E power supplies and the RPS.
Consequently, as required by Reference'(4), Vermont Yankee proposes to install the required Class _-1E protective circuitry by the end of the next
~
refueling outage.
This commitment ~is made assuming that no unforeseen difficulties will be encountered in procuring the necessary equipment. Design information and proposed Technical Specifications for the-modified protective system will be submitted prior-to start up.
The protective circuitry packages we plan to use are similar to those which were found acceptable in References (4) and (5)..
T3 01300g
U.S. Nuclear Regulatory Commission January 27, 1981 Attention:
Mr. Thomas A.
Ippolito, Chief Page 2 k'e t ru s t that the information provided is adequate; however, should you have any questions, do not hesitate to call.
Very truly yours, VERMONT YANKEE NUCLEAR P0h'ER CORPORATION N
Y L. 11. He id e r Vice President SFU/kab l