ML19341B026
| ML19341B026 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/14/1981 |
| From: | Kintner L Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8101300062 | |
| Download: ML19341B026 (4) | |
Text
___.m_
l
[o.* "og'o, s
UNITED STATES
!\\
NUCLEAR REGULATORY COMMISSION n
{
WASHINGTON, D. C. 20656
\\,...../
.!An 1 1 1981
)
Docket No. 50=364 t
APPLICANT: Alabama Power Company FACILITY:
Farley 2 l
1
SUBJECT:
SUMPARY OF DECEMPER 5,1980 MEETING REGARDING OPERATING LICENSE j
REVIEW j
J. Halapatz visited Harold Bell in the design offices of Bechtel Corporation i
(Gaithersburg) to review drawings and other design information regarding piping systems that penetrate the containment. The purpose was to identify components of the piping systems that are a part of the containment pressure boundary and therefore must meet the fracture toughness requirements of General Design Criteria-51.
The following components were selected for audit of the materials used therein i
to determine their compliance with GDC-51.
Main Feedwater System (Bechtel DWC. D-205073 Rev. 5)
Piping: Each Lot of 14" DEC-1 Piping: Each Lot of 14" EBD-4 Valves: Body-Bonnet-Disc / Plug / Wedge of:
N21V001A-B, N21V0018-B, N21V001C-B 2
FCV478. FCV488, FCV498 N2N31V508A, N2N21V508B, N2M21V508C Main Steam System (Bechtel DWG. D-205033 Rev. 9)
Piping: Each Lot of 32" EBB-1 Piping: Each Lot of 34.55" EBB-3 Valves: Body-Cover-Disc of:
QV001A, QV0018, QV001C Equipment Hatch (Chicago Bridge I, Iron DVG. 50 Rev. 3)
Piece Mark 72-3 k
m.
. Personnel Lock (Chicaco Bridge & Iron DWG. 305 Rev. 3)
Piece Mark 305-1 Penetration Sleeves (Bechtel DWG. D-206157 Rev. 13) sa Sleeves of Penetration Nos. 1,2,3,4,5,6 Applicant agreed to make certified material test reports for these components available to the staff for review.
7 p
i Les er L. Kintner, Project Manager Licensing Branch No. 2 Division of Licensing cc: See next page l
l l
9 l
a JAN 141961 Mr. F. L. Clayton, Jr., Senior Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 cc: Mr. W. O. Whitt Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 Mr. Ruble A. Thomas Vice President Southern Company Services. Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Mr. George F. Trowbridge Shaw, Pittman, Potts and Trowbridge 1800 M Street, N. W.
Washington, D. C.
20036 Mr. W. Bradford NRC Resident Inspector P. O. Box 1814 Dothan, Alabama 36302 1
9 t
1 9.
._.....__...---...._u.
..,. -_..a....
n
..