ML19341A924
| ML19341A924 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 01/13/1981 |
| From: | Widner W GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-07, IEB-80-7, NUDOCS 8101290376 | |
| Download: ML19341A924 (1) | |
Text
~
bG
\\
L b
- # "* 'd ""
January 13, 1981 m.,c
,e lo 0.,
United States Nuclear Regulatory Co p//
Office of Inspection and Enforceme %
REF:
RII-JP0 Region II - Suite 3100 t
50-321, 50-366 I
d@/
I&E Bulletin 101 Marietta Street, NW Atlanta, Georgia 30303 8/p
,C 80-07 g
b ATTENTION:
Mr. James P. O'Reilly 4"
% d' P
' '# /.49 g njN GENTLEMEN:
Inscection of Plant Hatch Unit 2 jet pump astemblies has been comoleted as required per I&E Bulletin 80-07, "BWR Jet Pump Assembly Failure."
Visual examinations by remote underwater television cameras of the Unit 2 jet pump structures, hold-downs, hold-down beam assemblies, and wedge and restrainer assemblies revealed no abnomal wear, stress, or failed welds.
Ultrasonic examinations utilizing General Electric pro-cedure TP-508.0642 (Rev. A) were also conducted on the jet pump hold-down beams at the midlength ligament areas bounding the beam bolt. It was determined that no cracking existed at those locations.
Visual and ultrasonic inspections of Hatch Unit 1 jet pump com-ponents are scheduled for examination during the Winter 1981 refueling outage scheduled to begin in February.
If you have any questions in this regard, please contact my office.
Sincerely yours, b
-f
./ / W. A. Widner JAE/mt xc:
M. Manry R. F. Rogers, III Sworn to and subscribed befoce me this 13th day of January, 1981 Notary Pubitc. Georgia. State at Large
- t.. ~/ ~ '_i [
My Comm:ssion Empires Sept. 20.1983 Notary Public pg 1%O3%