ILLINDIS P0tt'E'R 00A1PANY
~:'
LO8-81(01-08)-6 500 SOUTH 27TH 3THE ET. DECATUR, ILLINOIS 62525 January 8, 1981
{<
';dk.ll 9 y 3
'/iil)1l g T Mr. James G. Keppler a
Director, Region III d % 9m,3 0
of fice of Inspection & Enforcement N
%$t,MW j
U. S. Nuclear Regulatory Commission (Pr,c W/, xy 799 Roosevelt Road p
Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
Clinton Power Station Units 1 & 2 Docket Nos. 50-461 and 50-462 Construction Permits No. CPPR-137 & CPPR-138 This is in reply to your letter of November 6, 1980, whereby you forwarded IE Bulletin No. 80-21 which reported on the failures of some valve yokes supplied by Malcolm Foundry Co., Inc.
Please be advised that Illinois Power is still pursuing the initial determination on valve parts required by item 1 of the bulletin.
Some of our vendors investigations are still not complete.
We propose to provide a complete response to the bulletin action items by the end of February 1981.
Sincerely,
./'
C.
W G.
E. Wuller Supervisor - Licensing Nuclear Station Engineering l
GEW/em cc:
11.
H. Livermore. NRC Resident Inspector l
Director, Office of I & E, Div. of Reactor Operations Inspection NRC, Washington, D.
C.
l l