Responds to NRC 801008 Ltr Re Violations Noted in IE Insp Rept 50-482/80-18 Corrective Actions:Weld Portion Deposited by Shielded Manual Arc Process Removed & Welders Responsible for Electrode Maint Reprimanded & Suspended
ML19341A851
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/30/1980
From: Koester G
KANSAS GAS & ELECTRIC CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19341A850 List:
References
NUDOCS 8101280497
Download: ML19341A851 (2)


Text

-_- _ _ _ _ _ _

KANSAS GAS AND ELECTRIC COMPANY tw ea:me cc =w otsas u nousta=

w.cs *ess osur . =wctsan October 30, 1980 Mr. W.C. Seidle, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76011 KMLNRC-036 Re: NRC Docket No. STN 50-482/Rpt. 80-18

Dear Mr. Seidle:

This letter is eritten in response to your letter of October 8,1980.

As requested, the finding is addressed in three parts:

a) Corrective steps which have been taken and the results achieved; b) Corrective steps which have been taken to avoid further noncompliance 1 and c) The date when full compliance will be achieved.

Finding on October 1, 1980, the PSI observed two Daniel welders performing SMAW welding utilizing low hydrogen electrodes (7018) on a portion of the Essential Service Water system below grade piping which runs adjacent to the Control Building penetration. The following items are failures to follow the CWP-503 procedural requirements:

1. Low hydrogen electrodes were not maintained in heated containers but were carried about in stub buckets. The containers were found to be unheated.
2. The welders were not utilizing their welding pouches to hold the electrodes. The electrodes were cold to the touch and had been out of a heated storage caddy for more than one hour. No electrodes bent 1800 were observed in the 8101280 201 N. Market - Wichita, Kansas - Mail Address:PO. Box 208 I nichita, Kansas 67201 - Teleonone: Area Code (316) 261-6451

r

6. .

Mr. W.C. Seidle KMLNHC-036 October 30, 1980 stub buckets or in the adjacent area.

3. Welding was being done using the over-exposed and cold low hydrogen electrodes.

Response

a) The identified use of cold electrodes was documented on Deficiency Report 1SD5033M. To assure the metallurgical soundness of the weld, the deficiency report disposition required the ram val, by grinding, of the portion of the weld deposited by the Shielded Manual Arc process. Such removal was verified by QC inspection. Rewelding was performed in accordance with welding procedure CWP-503.

b) The two welders responsible for the improper care of welding electrodes were reprimanded and given a three-day suspension without pay. In accordance with Daniel's policy on weld rod control, any further violation by these welders will result in their termination.

c) Full compliance was achieved on October 28, 1980.

Please advise if you need additional information.