ML19341A757
| ML19341A757 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/29/1980 |
| From: | Oprea G HOUSTON LIGHTING & POWER CO. |
| To: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML19341A758 | List: |
| References | |
| ST-HL-AE-521, NUDOCS 8101270909 | |
| Download: ML19341A757 (3) | |
Text
7/C
'l[i> >. ? (7,I I.. ',, ~ ( '.,,
e i es i
n i
s
,ws V
,-,.m.
j t{ ' 'g' Iloust.in Iighung & luu, l'O llox1 00 !!on st. in, I, s.v.,, unl G l.4.?S 'c l 1 August 29, 1950 ST-If L-Ali-521 SIN:
C-0510 Mr. Karl Seyfrit Director, Region IV Nuclear Regulatory Cornission bil Ryan Drive, Su i t e 1000 Arlington, TX 76102
SUBJECT:
RESPONSE TO TiiE ORDER 'IO SUOW CAUSE COM'!!'lMENT EXTENSION Rl: QUEST SOUTli TEX \\S PROJECT ELI CIRIC GENERATING SI Al'10N Dea r r.
5cyfrit:
The t ask force review of the concrete placements in the Reactor Containnent, "echanical Auxiliary, and fuel Handling Buildings, as explained in our response to the Order to Show Cause item r3b, has revealed that t he :umunt of work required is greater than earlier ant icipat ed.
Specifically our review process requires a physical verification of the as-built conditions versus that of the design drawings, and in order to naintain consistency the sane resources are being used to perform the inspections in each building.
For these reasons we need to nodify our previous connitment dates of August 31, September 30, and October 31, 1980, respectively.
The task force review is now scheduled to be completed by; Reactor Containrent Building (Unit I and 2) -
Sept ember 15, 1980 Mechanical Auxiliary Building (Unit I and 2) -
October 15, 19S0 Fuel llandling Building (Unit I and 2) -
Nover.ber 15, 19SO Very t ruly yours,
[
i' l
Gt u' s
' L, G. W. Oprea, J r.
Execut ire Vice i' resident Gh0/end 810 127O W
G. W. Oprea, Jr.
f inovon l igloing & P..s o comp.m>
Page 2 August 29, 1980 cc:
D. G. Barker C. L. McNeese H. R. Dean R. L. Waldrop G. B. Painter A. J. Granger R. A. Frazar M. D. Schwar (Baker & Botts)
R. Gordor. Gooch (Baker & Botts)
J. R. Newman (Lowenstein, Newman, Reis, Axelrad & Toll)
Director, Office of Inspection & Enforcement Nuclear Regulatory Con:nission Washington, D. C. 20555 M. L. Borchelt Executive Vice President Central Power & Light Company P. O. Box 2121 Corpus Christi, Texas 78403 R. L. Range Central Power & Light Conpany P. O. 2121 Corpus Christi, Texas 78403 R. L. Hancock Director of Electrical Utilities City of Austin P. O. Box 1088 Austin, Texas 78767 T. H. Moehlenbeck City of Austin' P. O. Box 1088 Austin, Texas 78767 J. B. Poston Assistant General Manager of Operations City Public Service Board P. O. Box 1771 San Antonio, Texas 78296 A. vonRosenberg City Public Service Board P. O. Box 1771 San Antonio, Texas 78296 l
l t
prea, Jr.
, I tommn 1 ighting & l'..wr o.m;>.m3 3
August 29, 1980 Charles Be:hoefer, Esquire Chairman, Atomic Safety & Licensing Board U.S. Nuclear Regulatory Con; mission Washine ;n, D.C. 20E55 Dr. James C. Lamb, III 313 Woodhaven Road Chapel Hill, North Carolina 27514 Dr. Eameth A. Lueble Atomic Safety & Licensing Connission U.S. Nuclear Regulatory Cor=ission Washington, D.C.20555 Steven A. Sinkin, Esquire 116 Villita Street San Antonio, Texas 78205 Citizens for Equitable Utilities c/o Ms. Peggy Buchv n Route 1. Box 432 Brazoria, Texas 77422 Richard W. Lowerre, Esquire Assistant Attorney General for the State of Texas P. O. Box 12548 Capitol Station Austin, Texas 78711 Henry J. McGurren, Esquire Hearing Attorney Office of the Executive Legal Director U.S. Nuclear Regulatory Conmission Washington, D.C. 20555 l