ML19341A475

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Originally Reported on 801216,re Unapproved Mods to Control Room Fire Dampers.Caused by A/E Error.Vendor Investigation Re Possible Effects on Ul Classification & Air Flow Testing in Progress
ML19341A475
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 01/15/1981
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, AECM-81-28, NUDOCS 8101230607
Download: ML19341A475 (2)


Text

1 o

.o I

MISSISSIPPI POWER & LIGHT COMPANY b 'b Helping Build Mississippi Emessmand P. O. B O X 16 40, J AC K S O N, MIS SIS SIP PI 3 920 5

  1. $.$r$,'cIN[e(('

January 15, 1981 a

f,V_'D%

y 9

office of Inspection & Enforcement U. S. Nuclear Regulatory Co= mission r l7 '!,

!f4' h'i l '. ;;

s Region II 4

9 101 Marietta Street, N.W.

2 f ~...

Suite 3100 p

"'2 S8+ w cre.,2 ~%

Atlanta, Georgia 30303 9Q

% u.

j Attention:

Mr. J. P. O'Reilly, Director

, /,, y /

\\l'

, h/

Dear Mr. O'Reilly:

N.2

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/71, Status Report No. 1, Control Room HVAC Fire Dampers AECM-81/ 23 On December 16, 1980, Mississippi Power & Light Company noti-fied Mr. John Rausch of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) canstruc-tion site. The deficiency concerns the modification of the :ontrol room HVAC fire dampers. Attached is a status report.

We expect to complete our investigation and submit a complete report by March 25, 1981.

~....-

Yours truly,

  • v p

J. P. McGaughy, Jr.

CWH:mt Attachment cc:

Mr. N. L. Stampley Mr. Victor Stello, Director ~

Mr. G. B. Taylor Mr. R. B. McGehee Div. of Insp. & Enforcement South Miss. Electric Mr. T. B. Conner U. S. Fuclear Reg. Co=m.

Power Association Washington, D.C.

20555 P. O. Box 1589 Hattiesburg, MS 39401 C

Il gI I

o O]2 30&}

A S

Member Middle South Utilities System

y Attachment to AECM-81/28 Page 1 of 1 STATUS REPORT NO. 1 FOR PRD-80/71 I.

Description of Deficiencv An' Architect / Engineer authorized = edification to safety related trap-door type fire dampers was_ performed. However, the Archi-tect/ Engineer failed to obtain. approval frem the manufacturer prior to making the modification. The modification involved relocating hinges and latches 90 degrees frem the designed /

manufactured position. Safety implications have not yet been determined, although the Architect / Engineer has informed MPSL that the change affects the geometry of the installation and may affect the seismic qualification of the dampers.

If the dampers were to fail during a seismic event, the operation of the Control Roc = HVAC System could be affected. The NRC Region II was notified of this problem on December 16, 1980.

II.

Approach to Resolution of the Problem The Architect / Engineer will investigate the problem in concert with the vendor and determine the actions necessary to correct the problem and to preclude recurrente. Based on this deter =in-ation, any required modifications will be made to the dampers.

III.

Status of Procosed Resolution 1.

The vendor has been contacted and requested to investigate the modification for possible affects on UL classification, seismic qualification and air flow testing and to provide the Architect / Engineer with the results for their investi-gation.

l 2.

The Constructer has begun a 100% inspection of the 391 fire dampers already installed. Inspection is expected to be complete by March 1, 1981.

IV.

Reason for-Delavine Final Report The vendor investigation has not been completed.

V.

Projected Completion Date A final report is expected to be submitted by March 25, 1901.