Interim Deficiency Rept Re Defective Sway Strut Rod Ends, Initially Reported on 801031.Solutions Are Being Investigated & Will Be Coordinated W/All Vendors to Obtain Generic Solution.Next Rept Will Be Forwarded by 810227
ML19341A465
Person / Time
Site: Midland
Issue date: 01/15/1981
From: Jackie Cook, Rutgers J
BECHTEL GROUP, INC., BECHTEL POWER CORP., CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 11009, MCAR-42, NUDOCS 8101230581
Download: ML19341A465 (5)


Text

.

[ k' CODStm0IS

~

~ 6

! D0V!8r I 3-j Coll 1pany vu, n,,u,., a,j,,,33,<.,-,,,

J.nw. w c k i

e and Constructson v)

.l 3

G o.n.r.i ovvic : 194s w.,e Pern ri no.a. J.ek,on. us 4o201. (s 7: 7ss.o4s3 rj

{

f

'=

. sa.

S*

t jg j

January 15,1981

.D

-N LS

~2 T5

=!

EEE

~

h n

Mr J G Keppler, Regional Director y

3 3

Office of Inspection and Enforcement US Nuclear Regulatory Commission Re6 ion III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR PLANT UNITS 1 AND 2, DOCKET NOS 50-329, 50-330 SWAY STRUT ROD ENDS DEFICIENCY FILE:

0.k.9.h2 UFI:

73*10*01, 152.40(E) SERIAL:

11009

Reference:

CPCo letter to J G Keppler; Same Subject; Scrial 9784; Dated October 31, 1980 This letter is an interim 50.55(e) report concerning the sway strut rod ends deficiency.

The enclosure to this letter describes the status of the resolution as of December 12, 1980.

Another report, either interin or final, vill be provided by February 27, 1981.

ht446$

WRB/1r

Enclosure:

Letter, Bechtel to CPCo, Serial BLC-1012h, dated December 12, 1980, with attached Management Corrective Action Report (MCAR-1), Report No h2, Interim Report 2, Loose Hanger Standard Parts Bushings CC: Director of Offrice of Inspection & Enforcement l

Att Mr Victor Stello, USNRC (15)

Director, Office of Management Infomation & Procram Control, USHRC (1) l RJCook, USNRC Resident Inspector Midinnd Nuc3 car Plant (1) l al0ietio61r/

S

m.

e 2

Serial'11009 CC: CBechhoefer, ASLB Panel GALinenberger, ASLB Panel FPCowan, ASLB Panel

'AS&E Appeal Panel M Cherry, Esq MSinclair CRStephens, USNRC WDPaton, Esq, USHRC FJKelly, Esq, Attorney General SEFreeman, Esq, Asst Attorney General GTTaylor, Esq, Asst Attorney General.

WHMarshall GJMerritt, Esq, TNK&J Great Lakes QA Managers T

Y N

I

\\

t 4

. ~... -... _,

Enclosure to Strici 11009 Bechtel Power Corporation 018090 777 East Eisenhower Parkway Ann Arbor, Michigan Afed A##ess P.O. Box 1000, Ann Arbor, Michigan 48106 December 12, 1980 BLC-10124 Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 Attention: Mr. J.W. Cook Vice President Projects. Engineering and Construction

Subject:

Midland Plant Units 1 and 2 Consumers Power Company Bechtel Job 7220 MCAR 42, Interim Report 2 The attached Interim Report 2 for MCAR 42 dealing with linear indica-tion in disengaged self-aligning rod end bushings is transmitted for your information and use.

The next interin report is scheduled for issue by February 9, 1981.

Very uly yours J.A. Rutgere Project Ma ager JAR /AEB/LH

Attachment:

MCAR 42, Interim Report 2 cc:

W.R. Bird w/a G.S. Keeley w/a

.' ['. A)%{f,t R.L. Rixford w/a Od 3 Jg ASSU:1Atjgg Written Response Requested: No

~

Bechtel Associates Professional Corporation 777 East Eisenhower Parkway Ann Arter. Whg.n 0l8090 aneumers P.O. Box 1000. Ar.n A *bor, Michigan 48106

SUBJECT:

MCAR 42, Issued 9/24/80 Loose Hanger Standard Parts Bushings INTERIM REPORT 2 DATE:

PROJECT:

Consumers Power Company Midland Plant Units 1 and 2 Bechtel Job 7220 STATUS OF CORRECTIVE ACTION AND INVESTICATION The status of actions in progress for resolution of the subject Management Corrective Action Report (MCAR) is as follows:

1.

Complete identification, location, and inspection of sway struts furnished to the Midland plant by Corner & Lada, Inc., ITT Crinnall, Pacific Scientific, NPS, and Bergen-Paterson has not been initiated pending a generic solution which is applicable and acceptable to all the vendors and Bechtel.

2.

The manufacturer's recommended procedures for resolving the deficiencies without precluding warranties were requested from all suppliers of sway struts.

Both Corner & Lada and NPS responded with procedures which require staking; however, several sway struts that were initially staked have been identified as loose or dislodged.

ITT Crinnell's response was incomplete and is being pursued further.

Bergen-Paterson requested return of a sway strut assembly for examination prior to providing its tecommendation.

The sway strut assembly was returned to Bergen-Paterson and we are awaiting its reply.

3.

The use of spacers, tack welding, or pinning is being considered to restrain any bushir.g that is identified as loese and/or where total bushing disengagement is possible.

Spacers would be sized such that disengagement of the self-aligning ball bushing would be prevented by restraining the rod end paddle from excessive side motion without precluding design function.

Bechtel Associates ProfessionalCorporation 018090 MCAR 42 Interim Report 2 Page 2 These solutions are being investigated ar1 will be coordinated with'all vendors in an attempt to obtain a generic solution for all sway strut bushings involved.

Our next report on this subject will Le issued by 2/9/81.