ML19341A427
| ML19341A427 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 01/15/1981 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, AECM-81-31, NUDOCS 8101230500 | |
| Download: ML19341A427 (2) | |
Text
"
D**
T R.
we w
n im 4
i MISS!SSIPPI POWER & LIGHT COMPANY A
A Helping Build Mississippi E b P. O. B O X 16 4 0. J A C K S O N. MI S SI S SI P ol 3920S JAMES P. VcGAU.asicm o'anuary 15, 1981 GHY. JR.
m sn rv w Offica of Inspection & Enforcement C. S. Nuclear Regulator / Commission Regica II 101 Marietca Street, N.".
Suite 3100 Atlanta, Georgia 30303 Attention:
Mr. J. P. O'Reilly, Director
Dear Mr. O'Reilly:
SU3JEC': Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-80/5&, Status Report No. 2, HVAC Seismic Hangers AECM-81/31 On Septemcer 5, 1980, Misstsstppi Power & Light Company noti-fled Mr. M. Hunt of your office of a Potentially Reportable Defi-ciency (PRD) at the Grand Gulf Nuclear Station (CGNS) construction site. This PRD identified a condition whereby seismic hangers in-stalled by the subcontractor were found to be not in conformance with specifications.
A determination has been made' tha't
'T deficiency is repor-table under the provisions of 10CFR50.55(e).
In that these items have not been delivered to MP&L for acceptance, this condition is not reportable under 10CFR21. A status report on this matter is attached.
Yours truly, o
f y J. P. McGaugh, Jr.
/
Adif FGM/EWC:mt f
Attachment 3 if cc:
Mr. N. L. Stampley tor Stello, Director Mr. G. B. Taylor Mr. R. B. McGehee Div. of Insp. & Enforcement South Miss. Electric Mr. T. B. Conner U.S. Nuclear Reg. Comm.
Power Association l
Washington, D.C. 20555 P. O. Box 1589 Hattiesburg, MS 39401 810 12805 %5.
- *b Attachment to AECM-8i/31 Page 1 of 1 f
6 STATUS REPORT NO. 2 FOR PRD-80/54 I.
Description of Deficiency On Septenber 5,1980, Mississippi Power & Light Company noti-fied Mr. M. Hunt of the NRC of a Potentially Reportable Defi-ciency (PRD) at the Grand Gulf Nuclear Station (GGNS) construc-tion site. Seismic HVAC hangers were found to have incomplete welds at member connection points.
Further investigation re-vealed missing braces, undersized rupport members and hangers not welded to the duct.
II.
Approach To The Resolution Of The Problem The deficiency concerns the installation of HVAC II over I and "Q" supports in violation of AISC and AWS Codes. This generic deficiency const tutes a significant reduction in the strength i
and quality of the entire HVAC support system and could have a detrimental effect upon the safety of plant operations. It has been determined that conditions satisfy the reporting cri-teria under 10CFR50.55(e).
The constructor is presently performing actions to correct nonconformances identified in Management Corrective Action Request (MCAR) 104.
(Previously reported as QAR F-223)
III.
Status Of Proposed Resolution The Inspection is presently underway by the constructor. The anticipated date of completion of all inspection and docume7ta-tion is February 27, 1981. Tne espestE-completion date or all rework ~ construction and re-inspection Ei April 30, 1981.
~
IV.
Reason For Final Report Delay The constructor's actions to resolve this problem include inspec-tion of the condition, evaluation and documentation followed by re-inspection of rework construction. Accessability to the items complicates the inspection procedure.
In certain cases, scaffolding will need to be erected to permit the inspector access to the work.
V.
Projected Final Report submittal Date It is anticipated that a final report on this matter can be presented May 28, 1981.