ML19341A406

From kanterella
Jump to navigation Jump to search
Amends 52 & 46 to Licenses DPR-19 & DPR-25,respectively, Authorizing one-time Operation for 48-h W/Plant Chimney Monitoring Sys Out of Svc to Permit Installation of Required Monitoring Improvements
ML19341A406
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/29/1980
From: Crutchfield D, Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19341A407 List:
References
NUDOCS 8101230451
Download: ML19341A406 (8)


Text

__

3 b) gj

.k UNITED STATES f

puerg g

NUCLEAR REGULATORY COMMISSION y

g E

WASHING TON, D. C. 20555

%,*..,*/

COMM0 WEALTH EDISON COMPANY DOCKET NO. 50-237 DRESDEN STATION UNIT NO. 2 AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 52 License No. DPR-19 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Comonwealth Edison Conpany (the licensee) dated December 5,1980, conplies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be

~ conducted in conpliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; ana E.

The issuance of this amendment is in accoraance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

i i

l 8101*8a 4 51

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B of Provisional Operating License No.

DPR-19 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 52, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY C0ltilSS10N pgp 4 kt Dennis M. Crutchfield, hief Operating Reactors Branch #5 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: December 29, 1980 4

i e

o ATTACMENT TO LICENSE AMENDMENT NO. 52 PROVISIONAL OPERATING LICENSE NO. DPR-19 DOCKET NO. 50-237 i

Revise the Appendix "A" Technical Specifications by removing Page 133a and replacing it with the attached revised Page 133a.

'l i

f S

S I

I l

t OPR 19 3.8 LIMITING CONDITION M)R OPERATION 4,g SURVEILLANCE REQUIRDtENT The Unit 2/3 plant chire.ey gas sampling system may be out of service for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for the purpose of installing the high range noble gas ronitor as long as the following,

conditions are satisfied:

c.

Both units are at steady state conditions with the racarbiners and charecal adsorbers in service for the operating unit (s),

b.

The chimney release rate rest be shown by calculation to be less than the lirits of 3.8.A.2.a. and b.,

assuming the charcoal adscrters are bypassed on both units.

c.

Both offgas monitors en Unit 2 and Unit 3 must be operational and the rcnitor reading correlated to the chimney release rate based en the conservative as-sumption of both units' charcoal adsorbers being by-passed.

d.

If the provisions of 3.E.A.l.a, b or c cannot be met, an orderly load reducticn of the unit (s) shall be initiated imrediately.

Due to the existence of Crerden Unit 1 and two Dresden Unit 2/3 stacks in close /icinity, a set of equations are M

needed to express the airterne effluents limits. The 6

sy:rtols in the equations s ard fcr the following:

O Oy = release rate fran Uni-1 plant chimney 0 = release rate from Units 2 ard 3 plant chimney O

with only Unit 2 or cnly Unit 3 operating (not both) 2350 Q2,3 = release rate fran Units 2 and 3 plant chimney with both units operating MN O

= release rate fran Units 2 and 3 reactor building g

y ventilation stack Change J5, 133a Arendment No. 52

8[

+

UNITED STATES p,

NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 5

~s...../

COMMONWEALTH EDIS0N COMPANY DOCKET N0. 50-249 DRESDEN STATION UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 46 License No. DPR-25 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Comonwealth Edison Conpany (the licensee) dated Decenber 5,1980, conplies with the standards and requirements of the Atomic Energy Act of 1954, as a~ mended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in conpliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

j l

l l

l

, 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 3.B of Facility Operating License No.

DPR-25 is hereby amended to read as follows:

B.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 46, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION QL Thomas

. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: December 29, 1980 l

l

(

ATTACMENT TO LICENSE AMENDMENT NO. 46 FACILITY OPERATING LICENSE NO. DPR-25 DOCKET NO. 50-249 Revise the Appendix "A" Technical Specifications by renoving Page 133a and replacing it with the attached revised Page 133a.

J 0

~

I t

DPR-25 l

mm CE R6NT 3.8 LIMITING CONDITION FOR OPERATION 4.8 The Unit 2/3 plant chimney gas sappling system may be out l

cf service for 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for the purpose of installing the high range noble gas monitor as long as t.he following conditions are satisfied:

a.

Both units are at steady state conditions with the ~

recombiners and charcoal adsorbers in service for the operating unit (s).

b.

The chimney release rate must be shown by calculation to be less than the limits of 3.8.A.2.a. and b.,

assuming the charcoal adsorbers are bypassed on both units.

c.

Both offgas monitors on Unit 2 and thit 3 must be operational and the monitor reading correlated to the chimney release rate based on the conservative as-sumption of both units' charcoal adsorbers being by-passed.

d.

If the provisions of 3.8.A.l.a, b or c cannot be met, an orderly load reduction c. the unit (s) shall be initiated inTnediately.

Due to the existence of Dresden Unit 1 and two Dresden Unit 2/3 stacks in close vicinity, a set of equations are needed to express the airtorne effluents limits. The sytrbols in the equations stand for the following:

Oy = release rate frm Unit 1 plant chimney Q2 = release rate from Units 2 and 3 plant chimney with only Unit 2 or only Unit 3 operating (not both) 0,3 = release rate frm Units 2 and 3 p1 ant chimney 2

with both units operating O

= release rate from Units 2 and 3 reactor building g

ventilation stack Change No. 7, icendment No. 46 133a

-