Monthly Operating Rept for Dec 1980
ML19341A396
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/12/1981
From: Howlett G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19341A395 List:
References
NUDOCS 8101230413
Download: ML19341A396 (5)


Text

D"D "

&& %f 30

/3 I

W 1 Al/L

.pq ,

V.

OPERATING DATA REPORT DOCKET NO.

50-336 DATE 3/12/d1 COMPLETED BY G.H. Howlett TELEPIIONE .( 203 } 447-1791 X:

OPERATING STATUS

1. Unit Name: Millstone 2 Notes
  • Items 21 & 22
2. Reporting Period:

December im cupaWearecomputed using a weighted average.

3. Licensed Thermal Power (MWt): 2700
4. Nameplate Rating (Gross 31We): 909
5. Design Electrical Rating (Net MWe): 870
6. Masimum Dependable Capacity (Gross MWe). 895
7. Masimum Dependable Capacity (Net MWe): 864
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report,Gise Reasons:

None

9. Power Lesel To which Restricted,If Any(Net MWe): None
10. Reasons For Restrictions,If Any: N/A This Month Yr..to.Date Cumulative
11. Hours In Reporting Period 744 8,784 43.992
12. Number Of Hours Reactor Was Critical 744 6,170.2 31,249.3
13. Reactor Reserve Shutdown Hours 0 4.5 2,076.9
14. Ilours Generator On.Line 744 5,948.8 29,/69
15. Unit Resene Shutdown Hours 0 132.8 468.2
16. Gross Thermal Energy Generated (MWH) 1.995.148 15,536,693 72,235,321 .
17. Gross Electrical Energy Generated (MWH) 651,200 _ , , ,

5,088,272 23,672,917

18. Net Electrical Energy Cenerated (MWH) _ 628.113 4,881,788 22,662,046
19. Unit Senice Factor .

100 67.7 67.7

20. Unit Availability Factor 100 69.2 68.7
21. Unit Capacity Factor (Using MDC Net) 97.7 64.3
  • 62.4
22. Unit Capacity Factor (Using DER Net) 97.0 63.9
  • 61.2
23. Unit Forced Outage Rate 0 17.9 22.7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status IPrior to Commercial Operation): Forecast Achieved INITIA L' CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A NOTE: Correction made for typo reported for item 16 Cumulative in Nov'e'mber 1980 Operating Data Report, read 71,240,173 should have read 70,240,173.

19/77) 710 ] 2 3 Cf/Jt

s.

'.4 AVER AGE p agty UNIT l OhER LEVEL W.

DOCK ET NO. _50-336

. UNIT Millstone 2

. DA TE I/12/81 CO'.JPLE TED By J.H.Howlett TELEPHONE _(203)447-1791X364 MONTH December 1980 DAY AVER AGE DAILY POWER LEVEL

- DAY AVER AGE DAILY POhER LEVEL (M We-Ner)

(MWe Net)

849

- , 17 849 2 849 849

, 18 3 __850 19 849 4 851 848 20 5 849 827

  • 21 g ggg 22 848 7 823 849

- 23 8 826 849 24 9 849 849 25 10, 848 848 26 II 848 849 27 12 849 849 28 13 808 850 29 -~

14 836 849 30 15 849 849 3I

- 16 849 INSTRUCTIONS On this format.!!n the aserne daily unit power leselin MWe-Net for each day in tv repuning m.>r,th. C.empuie to .

- the r.euest whole mepwart.

(9/77)

. UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-336 UNIT NAME Mi Istone 2 DATE 1/ 2/81 December 1980 COMPLETED BY G.H. Howlett REPORT MONT11 TELEFilONE (203)447-1791 X364 "h -

-. .! ? . Yk Licensee j*, "

. Cause & Corrective No. Date g 3 gj q ,c g 5 Esent u '2 n3 Action to

$E $ jgg Reporia iN 0 jU Prevent Recurrence 8

17 801206 F 0 A/il NA 80-040/3L RB CRDRVE During steady-state 100% power opera-tions, CEA #31 dropped to zero steps from 180 steps. This resulted in operations, per spec ~s., at a reduced power level of 70%. There were no component failures found. The C.E.A.

was realigned at 180 steps and 100% ,

power operation was resumed. It is unknown why the CEA dropped, previous history and performance since has been normal.

Summary: The unit operated at or near 100% of rated thermal power throughout the reporting period except for the power reduction on the 6th.

. Docket No. 50-336 3 Date: 1/12/81 Completed By: G.H. Howlett III Telephone: 203/447-1971 X364 REFUELING INFORMATION REQUEST

1. Name of facility: Millstone 2

-2. Scheduled date for next refueling shutdown:

Commenced refuel outage November 28, 1981.

3. Schedule date for restart following refueling: January 16, 1982
4. Will refueling or resumption of operation thereafter require a technical .

specification change or other license amendment?

It is not anticipated that Cycle 5 opwations will require Technical Specification changes-or c'cher License amendments.

5. Scheduled date(s) for submitting licensing action.and supporting information:

Licensing documentation will be provided a minimum of 90 days prior to start-up of Cycle 5 or as documented in the R.A. Clark letter to W.G. Counsil, dated 10/6/80, authorizing Cycle 4 operation.

6. Important licensing considerations associated'with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) In Core: 217 (b) 216

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

667

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

1985, Spent Fuel Pool, full core off load capability is reached.

1987, Core Full,- Spent Fuel Pool contains 648 bundles.

I

Dock;t No. 50-336 Page I of 1 Date 1/12/81 Unit Name Millstone 2 Completed By G.H. Howlett Telephone (203) 447-1791 CORRECTIVE MAINTENANCE

SUMMARY

FOR SAFETY RELATED EQUIPMENT Report Month November 1980 DATE SYSTEM COMPONENT MAINTENANCE ACTION 11/3/80 Chemical and Volume Boric Acid Pump P-19 Replaced mechanical seal.

Control 11/17/80 Containment Post Hydrogen Analyzer B (C-87) Replaced failed operational amplifier. See Incident Hydrogen LER 80-39/3L-0 Control 11/20/80 Service Water Service Water Strainer L-lC Rebuilt strainer. See LER 80-38/3L-0 9

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ . _ . _ _ _ _ _ _ _