ML19341A193
| ML19341A193 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/16/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Hwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19341A194 | List: |
| References | |
| NUDOCS 8101220344 | |
| Download: ML19341A193 (1) | |
Text
Alabama Power Company
- ~
- 600 North 18th Street Post office Box 2641 Birmingham. Alabama 35291 Telephone 205 250-1000 F. L CLAYTON, Jft.
Senior Vice President Alabama Pbwer the southem electrc system January 16, 1981 Docket No. 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Phillips Building, Room 116 7920 Norfolk Avenue Bethesda, Maryland 20014
~
1 Attention: Mr. A. Schwencer Gentlemen:
Joseph M. Farley Nuclear Plant - Unit 2 Special Low Power Tests Safety Evaluation Revision 2 Enclosed is Revision 2 to the Farley Nuclear Plant Unit 2 Special Low Power Tests Safety Evaluation which was performed by Westinghouse. This revision provides justification for perfonning test 5, Forced Circulation Cooldown, as a part of test 4, Establishment of Natural Circulation from Stagnant Conditions.
If you have any questions, please advise.
Yours very truly, C. 0 98
&l A
V M+s 4
F. L.pClayton,jJr.t/
RWS:de Enclosure cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner (w/ enclosure)
Mr. W. H. Bradford gg
.5
///
l l
l 81012g03s;q f