ML19341A051
| ML19341A051 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 01/13/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML19341A052 | List: |
| References | |
| NUDOCS 8101210518 | |
| Download: ML19341A051 (1) | |
Text
.
Alabama Power Company
$00 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 250-1000 m
F. L CLAYTON, JR.
Senior Vice President dlObOIUO bWCT the soutMm e'ectre system January 13, 1981 Docket No. 50-348 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthlv Operating Data Report Attached are two (2) copies of the December, 1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mc. John F. Stolz to Mr. Alan R.'Barton, dated October 21, 1977 a
" Narrative Summary of Operating Experience" is included in the attached re-port.
If you have any questions, please advise.
Very truly s
1,
/
h4
- Q. L. Clayton, Jr.
FLCJr/JRC:nac Attachments 1 - 5 cc:
Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, RII (1 copy) l 0b l>$s \\
810;e,_5l7 g