ML19341A031

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1980
ML19341A031
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/14/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML19341A032 List:
References
NUDOCS 8101210481
Download: ML19341A031 (1)


Text

.

Alabama Power Company j

600 North 18tn Street Post Office Box 2641 l

Birmingham, Alabama 35291 Telepnone 205 250-1000 m

F. L CLAYTON, JR.

Senior Vice President Alabama Power the sou: hem ett.trc sys:em January 14, 1981 Docket No. 50-364 Director Office of Management Information and Program Control U. S. Nuclear Regulatory Corr.ission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit No. 2 Mcnthly Operating Data Report Attached are two (2) copies of the December, 1980 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Section 6.9.L 10 of the Appendix A Techn cal Specifications. As requested by letter from Mr John F. Stolz to Mr. AL n R. Barton, dated October 21, 1977, a

" Narrative Su= mary of Operating Em erience" is included in the attached re-port.

If you have any questions, please advise.

Very truly yo s

f T 7: h~1

/

F. L. Clayton, Jr.

/g FLCJr/JRC:nac Attschments 1 - 4 cc:

Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) f

" 5 ')

(S 8101sicg.