YANKEE ATOMIC NUCLEAR POWER STATION 4
t t.;
a' MONTHLY STATISTICAL REPORT 80-12 1
1 FOR THE MONTH OF DECEMBER, 1980 j
1 1
1 i
I 4
1
(
4 l
1
.)
1 t
h t
3 f
i 0
[
)
1 a
j s
b l
i.
i 8101150ppy
... -.. - - - -. -. -.. ~. - - -.. -. -.. - -.. -. -
?
J OPERATI$G DATA REPORT
]
DOCKET NO.
50-29 DATE 810112 CO>iPLETED BY D.
M. Barnard TELEPHONE 617-872-8100 X239:
1 OPERATING STATUS Notes Yankee Rowe
- 1. Unit Name:
- 2. Reporting Period:
Dee -her. 1980 Power level restricted by 600 installation of baffle plates
- 3. Licensed Therms! Power (SIWt):
185 in turbine.
- 4. Nameplate Rating (Gross SIWE):
175
- 5. Design Electrical Rating (Net SIWE):
180
- 6. Staximum Dependable Capacity (Gross 5fWe):
175
- 7. Staximurr, Oependsbie Capacity (Net SIWE):
- 8. If Changes Ocw in C:pacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:
l
' 9. Power Level To Which Restricted.lf Any (Net $!We):
150 MWe See Notes l
- 10. Ressons For Restrictions.If Any:
i j
.i
)
This Sionth Yr to Date Cumu!stive 744.00 8.784.00
- 11. Hours In Reportini Period 744.00 1.969.63 140.334.28
- 12. Number Of Hours Reactor Was Critics!
0.00 0.00 0.00
- 13. Reactor Resene Shutdown Hours 744.00 1.934.12 135,961.73 l
- 14. Hours Generator On.Line 0.00 0.00 0.00 i
IS. Unit Reserve Shutdown Hour.
443.719.00 1.125.458.70 72.873,780.81 l
- 16. Gross Thermal Energy C2nerated (SIWUF:
- 17. Gross Electrical Energy Genersred (l'Vrf)
I19,465.10_,
312,987.30 22,385,140.50 111.366.59 291.966.36 20.958.109.69
- 18. Net E!ectrical Ene.ey Generated (3R H) 100.00 22.02 77.03
- 19. Unit Service Fsetor 100.00 22.02 77.03
- 20. Unit Availsbility Factor 85.54 18.99 70.04
- 21. Unit Capscity Factor (Using SIDC Net) 85.54 18.99 70.04
- 22. Unit Capacity Factor (Using DER Net) 0.00 73.95 5.38
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths (Type.Date.snd Durstion of Escht:
There is a scheduled refuelina and maintenance outane to beein May 1. 1981.
The outage is scheduled for six weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Ststus (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY Cost'.1ERCIAL OPERATION t /77) 1 y-*y4 yaia m
--w w
r-.-a g
4 "tT v"7 e
W=---tz---m-'e--
3 m
W v^-'
- a*-v*-
- -'ai.,e
- w w k --
w.
g.--7-.iw----wy g
y ew9.we+-w-p-gp-
)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Rowe DATE 810112 COMPLETED BY D. M. Bernard 617-872-8100 X2390 TELEPHONE MONTH DECEMBER. 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe. Net)
I 148.7 17 150.6 2'
149 0 Ig 150.5 3
149.2 19 150.5 149 4 20 150.6 4
3 149.6 21 150.7 6
149 8 22 150.7
.(-
7 149.8 23 150.8 149.8 24 150.8 g
150.4 9
149.5 25 10 149.9 26 150.1 11 140.7 27 150.2 149 9 12 '
149 7 28 150.1 13 149.9 29 149.8 30 149.7 l
14 149.8
~
l 15 149 9 31 16 150.2 INSTRUCTIONS On this format. list the average daily unit power leselin MWe. Net for esch day in the reporting month. Compute to the nearest whole rne swatt.
l (9/77)
(
L
l UNITSilUIDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 I
UNITNAhlE _ Yankee Rowe DATE annii?
REPORT AIONTil DECEMBER. 1980
, COMPLETED llY D-M-
Bernard 4
TEl.ErilONE 617-872-8100 X2390
)
1 1
4 j
"L
'.5 3
Licensec c*
c c
c.
.2 _e g
g*"
Cause & Curicesive g.s *f No.
Date g
3g
, ;g oc Evcas a3 o-Action to j$
Repost
- EU
]
l M
$5 5*
Prevens Recutscace 1
i i
~ None N/A N/A N/A N/A N/A N/A N/A N/A N/A l
k i
I i
i l
L 1
I 2
3 4
F: Fossed Iteasun:
Meiliud:
Enliible G Insieuctisms i
i j
S: Sdicduled A l?tiniement Failuie(Earlain) 1-Manual fue Picpasation of Da:a ll.nlaintenance ut Test 7 Manual Sct'ain.
Entay Slicces fue Licensec
[
l C Rcfueling
- 3. Automatic Scrain.
Eveni Repost (LERI File INUREG.
D Hegulatusy Resisicilun 4 O Isca (Emplain) 0 fill li Opciator Tsaining & License Examinailun l
I: Asiminisesasive 3
G Opciational 1.si. llinplain)
Enliileis I Same Simsee 08/77) 18 Disics Dimplain)
_- -. __.=
DOCKET NO.
50-29 UNIT Yankee Rowe DATE alGL12 CO!.!PLETED BY D. M. Bernard TELEPHONE 617-872-81C0 X2390 REPORT MONTH DECEMBER, 1980 SU:41ARY OF OPERATING EXPERIENCES 12/11/80 Plant load reduction connenced for Turbine Throttle Valve Exercise at 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br />.
12/11/80 Plant load at 123 Nie. Coassenced Turbine Throttle Valve Exercise at 1005 hours0.0116 days <br />0.279 hours <br />0.00166 weeks <br />3.824025e-4 months <br />.
12/11/80 Turbine Throttle Valve Exercise completed and conunenced plant load increase at 1140 hours0.0132 days <br />0.317 hours <br />0.00188 weeks <br />4.3377e-4 months <br />.
12/11/80 Plant returned to full load of 600 MWe at 2045. hours.
1 l